Skip to main content

Banyan Gold Announces Voting Results From Annual General and Special Meeting of Shareholders

VANCOUVER, BC / ACCESSWIRE / September 6, 2024 / Banyan Gold Corp . (the "Company" or "Banyan") (TSXV:BYN)(OTCQB:BYAGF) is pleased to announce the voting results of the Company's Annual General and Special Meeting of Shareholders held on September 6, 2024 (the "Meeting").

A total of 151,302,063 common shares were voted, representing the votes attached to 46.02% of all outstanding common shares. Shareholders voted in favour of the election of all director nominees. The percentage of votes cast for each is as follows:

Nominee

Total "for" votes cast

Votes "for" %

Marc Blythe

131,958,808

99.87%

Hayley Halsall-Whitney

132,009,205

99.91%

Tara Christie

132,000,103

99.90%

David Reid

132,008,650

99.91%

Steve Burleton

132,007,655

99.91%

Shareholders also approved: (i) the appointment of John J. Geib, Chartered Accountant, as the Company's auditors and authorized the directors to set the auditor's remuneration; and (ii) a resolution approving the Company's Stock Option Plan.

The reappointment of John J. Geib, Chartered Accountant as auditor of the Company:

Total number of ‘for' votes cast: 151,289,757 or 99.99%

In favour of approval of the Stock Option Plan:

Total number of "for" votes cast: 131,416,251 or 99.46%

Further information can be found in Banyan Gold's information circular available on SEDAR at www.sedar.com.

Upcoming Events

• Precious Metals Summit Beaver Creek - September 10 -13

  • Corporate Presentation: September 11 3:45 PM MDT

• Denver Gold Forum Americas - September 15 -18

  • Corporate Presentation: September 17 4:50 PM MDT

• Metals Investor Forum Vancouver - September 20 - 21

  • Corporate Presentation: September 20 1:30 PM PDT

• GCFF Conference (Vancouver) - September 21

  • Corporate Presentation: September 21 10:30 AM PDT

About Banyan

Banyan's primary asset, the AurMac Project is adjacent to Victoria Gold's Eagle Gold Mine and Hecla's high grade Keno silver mine, in Canada's Yukon Territory. The current inferred mineral resource estimate (" MRE ") for the AurMac Project of 7.0 million ounces has an effective date of February 6, 2024.

The 173 square kilometres (" sq km ") AurMac Project lies 40 km from Mayo, Yukon. The AurMac Project is transected by the main Yukon highway and benefits from a 3-phase powerline, existing power station and cell phone coverage. Banyan has the right to earn up to a 100% interest, in both the Aurex and McQuesten Properties respectively, subject to certain royalties.

The inferred MRE for the AurMac Project was prepared on February 6, 2024, and consisted of 7,003,000 ounces of gold (see Table 1) hosted within near surface, road accessible pit constrained Mineral Resources contained in two near/on-surface deposits: the Airstrip and Powerline Deposits.

Table 3: Pit-Constrained Inferred Mineral Resources - AurMac Project (1)(2)(3)(4)(5)

Deposit

Gold Cut-Off

g/t

Tonnage

Tonnes

Average Gold Grade

g/t

Gold Content

oz.

Inferred

Airstrip

0.30

35,243,000

0.75

845,000

Powerline

0.30

312,243,000

0.61

6,158,000

Combined Inferred

0.30

347,486,000

0.63

7,003,000

Notes to Table 1 :

  1. The effective date for the MRE is February 6, 2024 and was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., an independent Qualified Person in accordance with the requirements of NI

43-101. The technical report supporting the Resource Estimate entitled "AurMac Property, Mayo Mining District, Yukon Territory, Canada" (the "Technical Report") has been filed on SEDAR at www.sedarplus.ca on March 18, 2024.

  1. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing,changes in global gold markets or other relevant issues.

  2. The CIM Definition Standards were followed for classification of Mineral Resources. The quantity and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature ‎and there has been insufficient exploration to define these Inferred Mineral Resources as an ‎Indicated Mineral Resource and it is uncertain if further exploration will result in upgrading them to an ‎Indicated or Measured Mineral Resource category.

  3. Mineral Resources are reported at a cut-off grade of 0.30 g/t gold for all deposits, using a US$/CAN$ exchange rate of 0.75 and constrained within an open pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the following estimated parameters: gold price of US$1,800/ounce, US$2.50/t mining cost, US$5.50/t processing cost, US$2.00/t G+A, 80% gold recoveries, and 45° pit slopes.

  4. The number of tonnes and ounces was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations as per NI 43-101.

Detailed images of the Mineral Resource model, including an interactive 3D model and additional information can be found at: https://www.banyangold.com/projects/aurmac/

In addition to the AurMac Property, the Company holds the Hyland Gold Project, located 70 km Northeast of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt (the " Hyland Project"). The Hyland Project represents a sediment hosted, structurally controlled, intrusion related gold deposit, within a large land package (over 125 sq km), accessible by a network of existing gravel access roads.

Banyan trades on the TSX-Venture Exchange under the symbol " BYN " and is quoted on the OTCQB Venture Market under the symbol " BYAGF ". For more information, please visit the corporate website at www.banyangold.com or contact the Company.

Qualified Persons

Paul D. Gray, P.Geo., is a "qualified person" as ‎defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101"), and has reviewed and approved the content of this news release.‎ Mr. Gray is a geological consultant to Banyan and has verified the data disclosed in this news release, including the sampling, ‎‎analytical and test data underlying the information.

ON BEHALF OF BANYAN GOLD CORPORATION

(signed) "Tara Christie"

Tara Christie
President & CEO

For more information, please contact:
Tara Christie • 778 928 0556 • tchristie@banyangold.com
Jasmine Sangria • 604 312 5610 • jsangria@banyangold.com

CAUTIONARY STATEMENT: Neither the TSX Venture Exchange, its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) nor OTCQB Venture Market accepts responsibility for the adequacy or accuracy of this release.

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

FORWARD-LOOKING INFORMATION: This news release contains forward-looking information, which is not comprised of historical facts and is based upon the Company's current internal expectations, estimates, projections, assumptions and beliefs. Such information can generally be identified by the use of forwarding-looking wording such as "may", "will", "expect", "estimate", "anticipate", "intend(s)", "believe", "potential" and "continue" or the negative thereof or similar variations. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's plans for exploration; and statements regarding exploration expectations, ease and confidence in increasing ounces, exploration or development plans and timelines; mineral resource estimates; mineral recoveries and anticipated mining costs. Factors that could cause actual results to differ materially from such forward-looking information include uncertainties inherent in resource estimates, continuity and extent of mineralization, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, and the other risks involved in the mineral exploration and development industry, enhanced risks inherent to conducting business in any jurisdiction, and those risks set out in Banyan's public documents filed on SEDAR. Although Banyan believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

SOURCE: Banyan Gold Corp.



View the original press release on accesswire.com

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.