GVA 12.31.2013 10K


 
                     
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
x
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 2013
OR
o
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from _____ to _____
 Commission file number 1-12911
Granite Construction Incorporated
(Exact name of registrant as specified in its charter)
Delaware
77-0239383
(State or other jurisdiction of incorporation or organization)
(I.R.S. Employer Identification Number)
 
 
585 West Beach Street
 
Watsonville, California
95076
(Address of principal executive offices)
(Zip Code)
 
Registrant’s telephone number, including area code: (831) 724-1011
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Name of each exchange on which registered
Common Stock, $0.01 par value
New York Stock Exchange
 
Securities registered pursuant to Section 12(g) of the Act: None
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes x No o
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes o No x
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes x No o
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes x No o
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§ 229.405 of this chapter) is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. o
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. Large accelerated filer x Accelerated filer o   Non-accelerated filer o   Smaller reporting company o
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act). Yes o No x 
The aggregate market value of voting and non-voting common equity held by non-affiliates of the registrant was $1.1 billion as of June 30, 2013, based upon the price at which the registrant’s Common Stock was last sold as reported on the New York Stock Exchange on such date.
At February 18, 201438,919,160 shares of Common Stock, par value $0.01, of the registrant were outstanding. 
DOCUMENTS INCORPORATED BY REFERENCE
Certain information called for by Part III is incorporated by reference to the definitive Proxy Statement for the Annual Meeting of Shareholders of Granite Construction Incorporated to be held on June 5, 2014, which will be filed with the Securities and Exchange Commission not later than 120 days after December 31, 2013.
 



Index
 PART I

PART II

PART III
 

PART IV
 
 
 
 
 
 
 
 
 
EXHIBIT 101.INS 
 
EXHIBIT 101.SCH 
 
EXHIBIT 101.CAL 
 
EXHIBIT 101.DEF 
 
EXHIBIT 101.LAB 
 
EXHIBIT 101.PRE

1
 
 
 
 



Table of Contents

DISCLOSURE REGARDING FORWARD-LOOKING STATEMENTS
 
From time to time, Granite makes certain comments and disclosures in reports and statements, including in this Annual Report on Form 10-K, or statements made by its officers or directors, that are not based on historical facts, including statements regarding future events, occurrences, circumstances, activities, performance, outcomes and results that may constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements are identified by words such as “future,” “outlook,” “assumes,” “believes,” “expects,” “estimates,” “anticipates,” “intends,” “plans,” “appears,” “may,” “will,” “should,” “could,” “would,” “continue,” and the negatives thereof or other comparable terminology or by the context in which they are made. In addition, other written or oral statements which constitute forward-looking statements have been made and may in the future be made by or on behalf of Granite. These forward-looking statements are estimates reflecting the best judgment of senior management and reflect our current expectations regarding future events, occurrences, circumstances, activities, performance, outcomes and results. These expectations may or may not be realized. Some of these expectations may be based on beliefs, assumptions or estimates that may prove to be incorrect. In addition, our business and operations involve numerous risks and uncertainties, many of which are beyond our control, which could result in our expectations not being realized or otherwise materially affect our business, financial condition, results of operations, cash flows and liquidity. Such risks and uncertainties include, but are not limited to, those more specifically described in this report under “Item 1A. Risk Factors.” Due to the inherent risks and uncertainties associated with our forward-looking statements, the reader is cautioned not to place undue reliance on them. The reader is also cautioned that the forward-looking statements contained herein speak only as of the date of this Annual Report on Form 10-K, and, except as required by law, we undertake no obligation to revise or update any forward-looking statements for any reason.

PART I
Item 1. BUSINESS 

Introduction
Granite Construction Company was originally incorporated in 1922. In 1990, Granite Construction Incorporated was formed as the holding company for Granite Construction Company and its wholly-owned subsidiaries and was incorporated in Delaware. Unless otherwise indicated, the terms “we,”  “us,”  “our,”  “Company” and “Granite” refer to Granite Construction Incorporated and its consolidated subsidiaries.
We are one of the largest diversified heavy civil contractors and construction materials producers in the United States. We operate nationwide, serving both public and private sector clients. Within the public sector, we primarily concentrate on heavy-civil infrastructure projects, including the construction of roads, highways, mass transit facilities, airport infrastructure, bridges, trenchless and underground utilities, electrical utilities, tunnels, dams and other infrastructure-related projects. Within the private sector, we perform site preparation and infrastructure services for residential development, energy development, commercial and industrial sites, and other facilities, as well as provide construction management professional services.
We own and lease substantial aggregate reserves and own a number of plant facilities to produce construction materials for use in our construction business and for sale to third parties. We also have one of the largest contractor-owned heavy construction equipment fleets in the United States. We believe that the ownership of these assets enables us to compete more effectively by ensuring availability of these resources at a favorable cost.
In December 2012, we purchased 100% of the outstanding stock of Kenny Construction Company (“Kenny”), a Northbrook, Illinois-based national contractor and construction manager, for a purchase price of $141.1 million. Kenny is recognized as a national leader among tunneling and electrical power contractors, and has evolved into an industry-leading rehabilitation contractor utilizing cutting-edge trenchless and underground construction technologies and processes. The acquisition expanded our presence in the power, tunnel and underground markets, and has enabled us to leverage our capabilities and geographic footprint. Amounts associated with Kenny are included in our consolidated statement of operations for the year ended December 31, 2013 and in our consolidated balance sheets as of December 31, 2013 and 2012.



2
 
 
 
 



Table of Contents

Operating Structure
Our business has been organized into four reportable business segments to reflect our lines of business. These business segments are: Construction, Large Project Construction, Construction Materials and Real Estate. See Note 20 of “Notes to the Consolidated Financial Statements” for additional information about our reportable business segments.
In addition to business segments, we review our business by operating groups and by public and private market sectors. Our operating groups are defined as follows: 1) California; 2) Northwest, which primarily includes offices in Alaska, Arizona, Nevada, Utah and Washington; 3) Heavy Civil (formerly East), which primarily includes offices in California, Florida, New York and Texas; and 4) Kenny, which primarily includes offices in Colorado and Illinois. Each of these operating groups may include financial results from our Construction and Large Project Construction segments. A project’s results are reported in the operating group that is responsible for the project, not necessarily the geographic area where the work is located. In some cases, the operations of an operating group include the results of work performed outside of that geographic region. Our California and Northwest operating groups include financial results from our Construction Materials segment.
Effective in the third quarter of 2013, we made certain changes to the organizational structure of the four operating groups. The most significant changes were to move our Arizona business from the Heavy Civil operating group to the Northwest operating group, and to reclassify the majority of the complex heavy-civil construction contracts to the Heavy Civil operating group. These changes were designed to improve operating efficiencies and better position the Company for long-term growth. Prior period amounts associated with these changes have been reclassified to conform to the current year presentation. These changes had no impact on our reportable business segments.
Construction: Revenue from our Construction segment was $1.3 billion and $1.0 billion (55.2% and 47.2% of our total revenue) in 2013 and 2012, respectively. Revenue from our Construction segment is derived from both public and private sector clients. The Construction segment performs construction management, as well as various civil construction projects with a large portion of the work focused on new construction and improvement of streets, roads, highways, bridges, site work, underground, utilities and other infrastructure projects. These projects are typically bid-build and construction management projects completed within two years with a contract value of less than $75 million.
Large Project Construction: Revenue from our Large Project Construction segment was $777.8 million and $863.2 million (34.3% and 41.4% of our total revenue) in 2013 and 2012, respectively. The Large Project Construction segment focuses on large, complex infrastructure projects which typically have a longer duration than our Construction segment work. These projects include major highways, mass transit facilities, bridges, tunnels, waterway locks and dams, pipelines, canals, utilities and airport infrastructure. This segment primarily includes bid-build, design/build and construction management/general contractor contracts, generally with contract values in excess of $75 million.
We participate in joint ventures with other construction companies mainly on projects in our Large Project Construction segment. Joint ventures are typically used for large, technically complex projects, including design/build projects, where it is desirable to share risk and resources. Joint venture partners typically provide independently prepared estimates, shared financing and equipment, and often bring local knowledge and expertise (see “Joint Ventures” section below).
We also utilize the design/build and construction management/general contract methods of project delivery. Unlike traditional projects where owners first hire a design firm or design a project themselves and then put the project out to bid for construction, design/build projects provide the owner with a single point of responsibility and a single contact for both final design and construction. Although design/build projects carry additional risk as compared to traditional bid/build projects, the profit potential can also be higher. Under the construction management/general contract method of delivery, we contract with owners to manage the design phase of the contract with the understanding that we will negotiate a contract on the construction phase when the design nears completion. Revenue from design/build and construction management/general contract projects represented 63.6% and 74.5% of Large Project Construction revenue in 2013 and 2012, respectively.

3
 
 
 
 



Table of Contents

Construction Materials: Revenue from our Construction Materials segment was $237.8 million and $230.6 million (10.5% and 11.1% of our total revenue) in 2013 and 2012, respectively. The Construction Materials segment mines and processes aggregates and operates plants that produce construction materials for internal use and for sale to third parties. We have significant aggregate reserves that we own or lease through long-term leases. Sales to our construction projects represented 36.1% of our gross sales during 2013, and ranged from 36.1% to 47.1% over the last five years. The remainder is sold to third parties.
During 2013 and in connection with our 2010 Enterprise Improvement Plan (“EIP”), we recorded $14.7 million in restructuring charges and, separate from the EIP, recorded $3.2 million in non-cash impairment charges, related to the Construction Materials segment. The restructuring and impairment charges consisted of non-cash impairment charges to non-performing quarry sites which had an aggregate carrying value of $21.3 million prior to the impairment. Separate from these quarry sites, we incurred lease termination charges of $3.2 million. See Note 11 of “Notes to the Consolidated Financial Statements” and “Restructuring and Impairment Charges (Gains), Net” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” for additional information.
Real Estate: Granite Land Company (“GLC”) is an investor in a diversified portfolio of land assets and provides real estate services for other Granite operations. GLC’s current investment portfolio consists of residential as well as retail and office site development projects for sale to home and commercial property developers. The range of its involvement in an individual project may vary from passive investment to management of land use rights, development, construction, leasing and eventual sale of the project. Generally, GLC has teamed with partners who have local knowledge and expertise in the development of each property.
GLC’s current investments are located in California, Texas and Washington. Revenue from GLC was $0.1 million and $5.1 million (less than 0.1% and 0.2% of our total revenue) in 2013 and 2012, respectively. Pursuant to the EIP, which included plans to orderly divest of our real estate investment business, the Company recorded restructuring charges of $31.1 million in the fourth quarter of 2013, including amounts attributable to non-controlling interests of $3.9 million. The restructuring charges consisted of non-cash impairment charges to residential and retail development projects which had a carrying value of $44.6 million prior to the impairment. See Note 11 of “Notes to the Consolidated Financial Statements” and “Restructuring and Impairment Charges (Gains), Net” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” for additional information.

4
 
 
 
 



Table of Contents

Business Strategy
Our fundamental objective is to increase long-term shareholder value as measured by the appreciation of the value of our common stock over a period of time, as well as dividend yields. A specific measure of our financial success is the achievement of a return on net assets greater than the cost of capital. The following are key factors in our ability to achieve these objectives:
Aggregate Materials - We own and lease aggregate reserves and own processing plants that are vertically integrated into our construction operations. By ensuring availability of these resources and providing quality products, we believe we have a competitive advantage in many of our markets, as well as a source of revenue and earnings from the sale of construction materials to third parties.
Controlled Growth - We intend to grow our business by working on many types of infrastructure projects, as well as by expanding into new geographic areas organically and through acquisitions. In addition, our financial strength and project experience provide us with a competitive advantage, as we focus our efforts on larger projects. 
Decentralized Profit Centers - Each of our operating groups is established as an individual profit center which encourages entrepreneurial activity while allowing the operating groups to benefit from centralized administrative and support functions.
Diversification - To mitigate the risks inherent in the construction business as the result of general economic factors, we pursue projects: (i) in both the public and private sectors; (ii) in federal, rail, power and renewable energy markets; (iii) for a wide range of customers within each sector (from the federal government to small municipalities and from large corporations to individual homeowners); (iv) in diverse geographic markets; (v) that are construction management/general contractor, design/build and bid-build; (vi) at fixed price, time and materials, cost reimbursable and fixed unit price; and (vii) of various sizes, durations and complexity. In addition to pursuing opportunities with traditional project funding, we continue to evaluate other sources of project funding (e.g., public and private partnerships).
Employee Development - We believe that our employees are key to the successful implementation of our business strategies. Significant resources are employed to attract, develop and retain extraordinary talent and fully promote each employee’s capabilities.
Core Competency Focus - We concentrate on our core competencies, which include the building of roads, highways, bridges, dams, tunnels, mass transit facilities, airport and railroad infrastructure, underground utilities, power, materials management, construction management, staff augmentation and site preparation. This focus allows us to most effectively utilize our specialized strengths.
Ownership of Construction Equipment - We own a large fleet of well-maintained heavy construction equipment. The ownership of construction equipment enables us to compete more effectively by ensuring availability of the equipment at a favorable cost.
Profit-based Incentives - Managers are incentivized with cash compensation and restricted equity awards, payable upon the attainment of pre-established annual financial and non-financial metrics.
Selective Bidding - We focus our resources on bidding jobs that meet our selective bidding criteria, which include analyzing the risk of a potential job relative to: (i) available personnel to estimate and prepare the proposal; (ii) available personnel to effectively manage and build the project; (iii) the competitive environment; (iv) our experience with the type of work; (v) our experience with the owner; (vi) local resources and partnerships; (vii) equipment resources; (viii) the size and complexity of the job and (ix) expected profitability.
Our operating principles include:
Accident Prevention - We believe accident prevention is a moral obligation as well as good business. By identifying and concentrating resources to address jobsite hazards, we continually strive to reduce our incident rates and the costs associated with accidents.
Quality and High Ethical Standards - We believe in the importance of performing high quality work. Additionally, we believe in maintaining high ethical standards through an established code of conduct and an effective corporate compliance program.
Sustainability - Our focus on sustainability encompasses many aspects of how we conduct ourselves and practice our core values. We believe sustainability is important to our customers, employees, shareholders, and communities, and is also a long-term business driver. By focusing on specific initiatives that address social, environmental and economic challenges, we can minimize risk and increase our competitive advantage.

5
 
 
 
 



Table of Contents

Raw Materials
We purchase raw materials, including aggregate products, cement, diesel fuel, liquid asphalt, natural gas, propane and steel, from numerous sources. Our aggregate reserves supply a portion of the raw materials needed in our construction projects. The price and availability of raw materials may vary from year to year due to market conditions and production capacities. We do not foresee a lack of availability of any raw materials in the near term.
Seasonality
Our operations are typically affected by weather conditions during the first and fourth quarters of our fiscal year which may alter our construction schedules and can create variability in our revenues, profitability and the required number of employees.
Customers
Customers in our Construction segment include certain federal agencies, state departments of transportation, county and city public works departments, school districts and developers, utilities and owners of industrial, commercial and residential sites. Customers of our Large Project Construction segment are predominantly in the public sector and currently include various state departments of transportation, local transit authorities, utilities and federal agencies. Customers of our Construction Materials segment include internal usage by our own construction projects, as well as third-party customers. Our third party customers include, but, are not limited to, contractors, landscapers, manufacturers of products requiring aggregate materials, retailers, homeowners, farmers and brokers.
During the years ended December 31, 2013, 2012, and 2011, our largest volume customer was the California Department of Transportation (“Caltrans”). Revenue recognized from contracts with Caltrans represented $265.8 million (11.7% of our total revenue) in 2013, of which $239.9 million (19.2% of segment revenue) was in our Construction segment and $25.9 million (less than 0.1% of segment revenue) was in our Large Project Construction segment. Revenue from Caltrans represented $272.9 million (13.1% of total revenue) in 2012, of which $268.9 million (27.3% of segment revenue) was in our Construction segment and $4.1 million (0.5% of segment revenue) was in the Large Project Construction segment. Revenue from Caltrans represented $264.9 million (13.2% of total revenue) in 2011, of which $241.1 million (23.1% of segment revenue) was in the Construction segment and $23.8 million (3.3% of segment revenue) was in the Large Project Construction segment.




6
 
 
 
 



Table of Contents

Contract Backlog
Our contract backlog consists of the remaining unearned revenue on awarded contracts, including 100% of our consolidated joint venture contracts and our proportionate share of unconsolidated joint venture contracts. We generally include a project in our contract backlog at the time a contract is awarded and funding is in place. Certain federal government contracts where funding is appropriated on a periodic basis are included in contract backlog at the time of the award. Existing contracts that include unexercised contract options and unissued task orders are included in contract backlog as follows:
Contract Options: Contract options represent the monetary value of option periods under existing contracts in contract backlog, which are exercisable at the option of our customers without requiring us to go through an additional competitive bidding process and would be canceled only if a customer decided to end the project (a termination for convenience) or through a termination for default. When the options are exercised and funding is in place, the amount associated with the exercised option is recorded into contract backlog.
Task Orders: Task orders represent the expected monetary value of signed contracts under which we perform work only when the customer awards specific task orders or projects to us. When agreements for such task orders or projects are signed and funding is in place, the amount associated with the task order is recorded into contract backlog.
Substantially all of the contracts in our contract backlog, as well as unexercised contract options and unissued task orders, may be canceled or modified at the election of the customer; however, we have not been materially adversely affected by contract cancellations or modifications in the past (see “Contract Provisions and Subcontracting”). Many projects in our Construction segment are added to backlog and completed within a year and therefore may not be reflected in our beginning or year-end contract backlog. Contract backlog by segment is presented in “Contract Backlog” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.” Our contract backlog was $2.5 billion and $1.7 billion at December 31, 2013 and 2012, respectively. Approximately $1.4 billion of the December 31, 2013 contract backlog is expected to be completed during 2014
Equipment
At December 31, 2013 and 2012, we owned the following number of construction equipment and vehicles:
December 31,
2013
2012
Heavy construction equipment
2,534

2,566

Trucks, truck-tractors, trailers and vehicles
3,664

3,579

 
Our portfolio of equipment includes backhoes, barges, bulldozers, cranes, excavators, loaders, motor graders, pavers, rollers, scrapers, trucks and tunnel boring machines that are used in our Construction, Large Project Construction and Construction Materials segments. We believe that ownership of equipment is generally preferable to leasing because it ensures the equipment is available as needed and normally results in lower costs. We pool certain equipment for use by our Construction, Large Project Construction and Construction Materials segments to maximize utilization. We continually monitor and adjust our fleet size so that it is consistent with the size of our business, considering both existing backlog and expected future work. On a short-term basis, we lease or rent equipment to supplement existing equipment in response to construction activity peaks. In 2013 and 2012, we spent $30.2 million and $19.8 million, respectively, on purchases of construction equipment and vehicles.

7
 
 
 
 



Table of Contents

Employees
On December 31, 2013, we employed approximately 1,600 salaried employees who work in management, estimating and clerical capacities, plus approximately 2,000 hourly employees. The total number of hourly personnel is subject to the volume of construction in progress and is seasonal. During 2013, the number of hourly employees ranged from approximately 1,900 to 4,000 and averaged approximately 3,300. Three of our wholly-owned subsidiaries, Granite Construction Company, Granite Construction Northeast, Inc., and Kenny Construction Company, are parties to craft collective bargaining agreements in many areas in which they work.
We believe our employees are our most valuable resource, and our workforce possesses a strong dedication to and pride in our company. Among salaried and non-union hourly employees, this dedication is reinforced by a 6.5% equity ownership at December 31, 2013 through our Employee Stock Purchase Plan, Profit Sharing and 401(k) Plan, and service and performance-based incentive compensation arrangements. Our managerial and supervisory personnel have an average of approximately 11 years of service with Granite.
Competition
Competitors in our Construction segment typically range from small, local construction companies to large, regional, national and international construction companies. We compete with numerous companies in individual markets; however, there are few, if any, companies which compete in all of our market areas. Many of our Construction segment competitors have the ability to perform work in either the private or public sectors. When opportunities for work in one sector are reduced, competitors tend to look for opportunities in the other sector. This migration has the potential to reduce revenue growth and/or increase pressure on gross profit margins.
The scale and complexity of jobs in the Large Project Construction segment preclude many smaller contractors from bidding such work. Consequently, our Large Project Construction segment competition typically is comprised of large, regional, national and international construction companies.
We own and/or have long-term leases on aggregate resources that we believe provide a competitive advantage in certain markets for both the Construction and Large Project Construction segments.
Competitors in our Construction Materials segment typically range from small local materials companies to large regional, national and international materials companies. We compete with numerous companies in individual markets; however, there are few, if any, companies which compete in all of our market areas. 
Factors influencing our competitiveness include price, estimating abilities, knowledge of local markets and conditions, project management, financial strength, reputation for quality, aggregate materials availability, and machinery and equipment. Historically, the construction business has not required large amounts of capital, particularly for the smaller size construction work pursued by our Construction segment, which can result in relative ease of market entry for companies possessing acceptable qualifications. Although the construction business is highly competitive, we believe we are well positioned to compete effectively in the markets in which we operate.

8
 
 
 
 



Table of Contents

Contract Provisions and Subcontracting
Our contracts with our customers are primarily “fixed unit price” or “fixed price.” Under fixed unit price contracts, we are committed to providing materials or services at fixed unit prices (for example, dollars per cubic yard of concrete placed or cubic yard of earth excavated). While the fixed unit price contract shifts the risk of estimating the quantity of units required for a particular project to the customer, any increase in our unit cost over the expected unit cost in the bid, whether due to inflation, inefficiency, errors in our estimates or other factors, is borne by us unless otherwise provided in the contract. Fixed price contracts are priced on a lump-sum basis under which we bear the risk of performing all the work for the specified amount. The percentage of fixed price contracts in our contract backlog increased to 63.5% at December 31, 2013 compared with 56.8% at December 31, 2012. The percentage of fixed unit price contracts in our contract backlog was 26.0% and 39.6% at December 31, 2013 and 2012, respectively. All other contract types represented 10.5% and 3.6% of our backlog at December 31, 2013 and 2012, respectively.
Our construction contracts are obtained through competitive bidding in response to solicitations by both public agencies and private parties and on a negotiated basis as a result of solicitations from private parties. Project owners use a variety of methods to make contractors aware of new projects, including posting bidding opportunities on agency websites, disclosing long-term infrastructure plans, advertising and other general solicitations. Our bidding activity is affected by such factors as the nature and volume of advertising and other solicitations, contract backlog, available personnel, current utilization of equipment and other resources, our ability to obtain necessary surety bonds and competitive considerations. Our contract review process includes identifying risks and opportunities during the bidding process and managing these risks through mitigation efforts such as contract negotiation, insurance and pricing. Contracts fitting certain criteria of size and complexity are reviewed by various levels of management and, in some cases, by the Executive Committee of our Board of Directors. Bidding activity, contract backlog and revenue resulting from the award of new contracts may vary significantly from period to period.
There are a number of factors that can create variability of the contract performance as compared to the original bid, such factors can positively or negatively impact costs and profitability, may cause higher than anticipated construction costs and can create additional liability to the contract owner. The most significant of these include:
the completeness and accuracy of the original bid; 
costs associated with scope changes;
costs of labor and/or materials;
extended overhead due to owner, weather and other delays;
subcontractor performance issues;
changes in productivity expectations;
site conditions that differ from those assumed in the original bid (to the extent contract remedies are unavailable);
continuing changes from original design on design/build projects;
the availability and skill level of workers in the geographic location of the project;
a change in the availability and proximity of equipment and materials; and
our ability to fully and promptly recover on claims for additional contract costs.
The ability to realize improvements on project profitability at times is more limited than the risk of lower profitability. For example, design/build projects typically incur additional costs such as right-of-way and permit acquisition costs. In addition, design/build contracts carry additional risks such as those associated with design errors and estimating quantities and prices before the project design is completed. We manage this additional risk by adding contingencies to our bid amounts, obtaining errors and omissions insurance and obtaining indemnifications from our design consultants where possible. However, there is no guarantee that these risk management strategies will always be successful.
Most of our contracts, including those with the government, provide for termination at the convenience of the contract owner, with provisions to pay us for work performed through the date of termination. We have not been materially adversely affected by these provisions in the past. Many of our contracts contain provisions that require us to pay liquidated damages if specified completion schedule requirements are not met, and these amounts could be significant.
We act as prime contractor on most of our construction projects. We complete the majority of our projects with our own resources and subcontract specialized activities such as electrical and mechanical work. As prime contractor, we are responsible for the performance of the entire contract, including subcontract work. Thus, we may be subject to increased costs associated with the failure of one or more subcontractors to perform as anticipated. Based on our analysis of their construction and financial capabilities, among other criteria, we determine whether to require the subcontractor to furnish a bond or other type of security to guarantee their performance. Disadvantaged business enterprise regulations require us to use our best efforts to subcontract a specified portion of contract work done for governmental agencies to certain types of disadvantaged contractors or suppliers. As with all of our subcontractors, some may not be able to obtain surety bonds or other types of performance security.



9
 
 
 
 



Table of Contents

Joint Ventures
We participate in various construction joint venture partnerships and a limited liability company of which we are a limited partner or member (“joint ventures”) in order to share expertise, risk and resources for certain highly complex projects. Generally, each construction joint venture is formed to accomplish a specific project and is jointly controlled by the joint venture partners. We select our joint venture partners based on our analysis of their construction and financial capabilities, expertise in the type of work to be performed and past working relationships, among other criteria. The joint venture agreements typically provide that our interests in any profits and assets, and our respective share in any losses and liabilities, that may result from the performance of the contract are limited to our stated percentage interest in the project.
Under each joint venture agreement, one partner is designated as the sponsor. The sponsoring partner typically provides all administrative, accounting and most of the project management support for the project and generally receives a fee from the joint venture for these services. We have been designated as the sponsoring partner in certain of our current joint venture projects and are a non-sponsoring partner in others.
We also participate in various “line item” joint venture agreements under which each partner is responsible for performing certain discrete items of the total scope of contracted work. The revenue for these discrete items is defined in the contract with the project owner and each venture partner bears the profitability risk associated with its own work. There is not a single set of books and records for a line item joint venture. Each partner accounts for its items of work individually as it would for any self-performed contract. We account for our portion of these contracts as project revenues and costs in our accounting system and include receivables and payables associated with our work in our consolidated financial statements.
The agreements with our joint venture partners and limited liability company members (“partner(s)”) for both construction joint ventures and line item joint ventures define each partner’s management role and financial responsibility in the project. The amount of exposure is generally limited to our stated ownership interest. Due to the joint and several nature of the performance obligations under these agreements, if one of the partners fails to perform, we and the remaining partners would be responsible for performance of the outstanding work (i.e., we provide a performance guarantee). We estimate our liability for performance guarantees and include them in accrued expenses and other current liabilities with a corresponding asset in equity in construction joint ventures on the consolidated balance sheets. We reassess our liability when and if changes in circumstances occur. The liability and corresponding asset are removed from the consolidated balance sheets upon customer acceptance of the project. Circumstances that could lead to a loss under these agreements beyond our stated ownership interest include the failure of a partner to contribute additional funds to the venture in the event the project incurs a loss or additional costs that we could incur should a partner fail to provide the services and resources that it had committed to provide in the agreement. We are not able to estimate amounts that may be required beyond the remaining cost of the work to be performed. These costs could be offset by billings to the customer or by proceeds from our partners’ corporate and/or other guarantees.
At December 31, 2013, there was $4.4 billion of construction revenue to be recognized on unconsolidated and line item construction joint venture contracts, of which $1.2 billion represented our share and the remaining $3.2 billion represented our partners’ share.
Insurance and Bonding
We maintain general and excess liability, construction equipment and workers’ compensation insurance; all in amounts consistent with industry practice.
In connection with our business, we generally are required to provide various types of surety bonds that provide an additional measure of security for our performance under certain public and private sector contracts. Our ability to obtain surety bonds depends upon our capitalization, working capital, past performance, management expertise and external factors, including the capacity of the overall surety market. Surety companies consider such factors in light of the amount of our contract backlog that we have currently bonded and their current underwriting standards, which may change from time to time. The capacity of the surety market is subject to market-based fluctuations driven primarily by the level of surety industry losses and the degree of surety market consolidation. When the surety market capacity shrinks it results in higher premiums and increased difficulty obtaining bonding, in particular for larger, more complex projects throughout the market. In order to help mitigate this risk, we employ a co-surety structure involving three sureties. Although we do not believe that fluctuations in surety market capacity have significantly affected our ability to grow our business, there is no assurance that it will not significantly affect our ability to obtain new contracts in the future (see “Item 1A. Risk Factors”).

10
 
 
 
 



Table of Contents

Environmental Regulations
Our operations are subject to various federal, state and local laws and regulations relating to the environment, including those relating to discharges to air, water and land, the handling and disposal of solid and hazardous waste, the handling of underground storage tanks and the cleanup of properties affected by hazardous substances. Certain environmental laws impose substantial penalties for non-compliance and others, such as the federal Comprehensive Environmental Response, Compensation and Liability Act, impose strict, retroactive, joint and several liability upon persons responsible for releases of hazardous substances. We continually evaluate whether we must take additional steps at our locations to ensure compliance with environmental laws. While compliance with applicable regulatory requirements has not materially adversely affected our operations in the past, there can be no assurance that these requirements will not change and that compliance will not adversely affect our operations in the future. In addition, our aggregate materials operations require operating permits granted by governmental agencies. We believe that tighter regulations for the protection of the environment and other factors will make it increasingly difficult to obtain new permits and renewal of existing permits may be subject to more restrictive conditions than currently exist.
In July 2007, the California Air Resources Board (“CARB”) approved a regulation that will require California equipment owners/operators to reduce diesel particulate and nitrogen oxide emissions from in-use off-road diesel equipment and to meet progressively more restrictive emission targets from 2010 to 2020. In December 2008, CARB approved a similar regulation for in-use on-road diesel equipment that includes more restrictive emission targets from 2010 to 2022. The emission targets will require California off-road and on-road diesel equipment owners to retrofit equipment with diesel emission control devices or replace equipment with new engine technology as it becomes available, which will result in higher equipment-related expenses. In December 2010, CARB amended both regulations to grant economic relief to affected fleets by extending initial compliance dates as well as adding additional compliance requirements. To-date, costs to prepare the Company for compliance have been $9.6 million. We will continue to manage compliance costs; however, it is not possible to determine the future cost of compliance.
As is the case with other companies in our industry, some of our aggregate products contain varying amounts of crystalline silica, a common mineral. Also, some of our construction and material processing operations release, as dust, crystalline silica that is in the materials being handled. Excessive, prolonged inhalation of very small-sized particles of crystalline silica has allegedly been associated with respiratory disease (including Silicosis). The Mine Safety and Health Administration and the Occupational Safety and Health Administration have established occupational thresholds for crystalline silica exposure as respirable dust. We have implemented dust control procedures to measure compliance with requisite thresholds and to verify that respiratory protective equipment is made available as necessary. We also communicate, through safety information sheets and other means, what we believe to be appropriate warnings and cautions to employees and customers about the risks associated with excessive, prolonged inhalation of mineral dust in general and crystalline silica in particular (see “Item 1A. Risk Factors”).
Website Access
Our website address is www.graniteconstruction.com. On our website we make available, free of charge, our Annual Report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and all amendments to those reports as soon as reasonably practicable after such material is electronically filed with or furnished to the Securities and Exchange Commission (“SEC”). The information on our website is not incorporated into, and is not part of, this report. These reports, and any amendments to them, are also available at the website of the SEC, www.sec.gov.

11
 
 
 
 



Table of Contents

Executive Officers of the Registrant
Our current executive officers are as follows:
Name
Age
Position
James H. Roberts
57
President and Chief Executive Officer
Laurel J. Krzeminski
59
Senior Vice President and Chief Financial Officer
Thomas S. Case
51
Senior Vice President and Operations Services Manager
Michael F. Donnino
59
Senior Vice President and Group Manager
Patrick B. Kenny
63
Senior Vice President and Group Manager
Martin P. Matheson
52
Senior Vice President and Group Manager
James D. Richards
50
Senior Vice President and Group Manager
 
All dates of service for our executive officers include the periods in which they served Granite Construction Company.
Mr. Roberts joined Granite in 1981 and has served in various capacities, including President and Chief Executive Officer since September 2010. He also served as Executive Vice President and Chief Operating Officer from September 2009 to August 2010, Senior Vice President from May 2004 to September 2009, Granite West Manager from February 2007 to September 2009, Branch Division Manager from May 2004 to February 2007, Vice President and Assistant Branch Division Manager from 1999 to 2004, and Regional Manager of Nevada and Utah Operations from 1995 to 1999. Mr. Roberts served as Chairman of The National Asphalt Pavement Association in 2006. He received a B.S.C.E. in 1979 and an M.S.C.E. in 1980 from the University of California, Berkeley, and an M.B.A. from the University of Southern California in 1981. He also completed the Stanford Executive Program in 2009.
Ms. Krzeminski joined Granite in 2008 and has served as Chief Financial Officer since November 2010 and Senior Vice President since January 2013. She also served as Vice President from July 2008 to December 2012, Interim Chief Financial Officer from June 2010 to October 2010 and Corporate Controller from July 2008 to May 2010. From 1993 to 2007, she served in various corporate and operational finance positions with The Gillette Company (acquired by The Procter & Gamble Company in 2005), including Finance Director for the Duracell and Braun North American business units. Ms. Krzeminski also served as the Director of Gillette’s Sarbanes-Oxley Section 404 Compliance program and as Gillette’s Director of Corporate Financial Reporting. Her experience also includes several years in public accounting with an international accounting firm. She received a Bachelor’s degree in Business Administration-Accounting from San Diego State University in 1978.

12
 
 
 
 



Table of Contents

Mr. Case joined Granite in 1987 and has served as Senior Vice President and Operations Services Manager since January 2013. He also served as Vice President and Group Manager from January 2010 to December 2012, Southwest Operating Group Manager from March 2007 to December 2009, Utah Operations Branch Manager from August 2001 through March 2007, Utah Operations Construction Manager during 2001, Utah Operations Materials Manager between 1996 and 2000, and in various positions at Granite’s Nevada and Santa Barbara, California operations between 1986 and 1996. Mr. Case received a B.S. degree in Construction Management from California Polytechnic State University in 1986.
Mr. Donnino joined Granite in 1977 and has served as Senior Vice President and Group Manager since January 2010, Senior Vice President since January 2005, Manager of Granite East from February 2007 to December 2009, and Heavy Construction Division Manager from January 2005 to February 2007. He served as Vice President and Heavy Construction Division Assistant Manager during 2004, Texas Regional Manager from 2000 to 2003 and Dallas Estimating Office Area Manager from 1991 to 2000. Mr. Donnino received a B.S.C.E. in Structural, Water and Soils Engineering from the University of Minnesota in 1976.
Mr. Kenny has served as Senior Vice President and Group Manager since January 2013. Mr. Kenny previously served as Executive Vice President of Kenny Construction Company, which was acquired by Granite in December 2012. He was responsible for the Tunnel and Power divisions from 2005 to 2012, and he managed the Tunnel and Underground divisions from 1990 to 2005. Prior to such time, Mr. Kenny was Vice President of Engineering for Kenny Construction Company. Mr. Kenny received a B.S in Civil Engineering from Lehigh University in 1972 and an MBA from Lehigh in 1973.
Mr. Matheson joined Granite in 1989 and has served as Senior Vice President and Group Manager since August 2013. He also served as Washington Region Manager from February 2007 through July 2013, Branch Division Construction Manager from 2006 through 2007, Utah Operations Area/Operations Manager from 1999 to 2006 and in other positions at Granite’s Nevada Branch between 1989 and 1997. Prior to joining Granite, he worked at Kenny Construction Company. Mr. Matheson received a B.S. in Animal Science from University of Illinois in 1983.
Mr. Richards joined Granite in January 1992 and has served as Senior Vice President and Group Manager since January 2013. He also served as Arizona Region Manager from February 2006 through December 2012, Arizona Region Chief Estimator from January 2000 through January 2006 and in other positions at Granite’s Arizona Branch between 1992 and 2000. Prior to joining Granite, he served as a U.S. Army Officer. Mr. Richards received a B.S. in Civil Engineering from New Mexico State University in 1987.





13
 
 
 
 



Table of Contents

Item 1A. RISK FACTORS
Set forth below and elsewhere in this report and in other documents we file with the SEC are various risks and uncertainties that could cause our actual results to differ materially from the results contemplated by the forward-looking statements contained in this report or otherwise adversely affect our business.
We work in a highly competitive marketplace. We have multiple competitors in all of the areas in which we work, and some of our competitors are larger than we are and may have greater resources than we do. Government funding for public works projects is limited, thus contributing to competition for the limited number of public projects available. This increased competition may result in a decrease in new awards at acceptable profit margins. In addition, should downturns in residential and commercial construction activity occur, the competition for available public sector work would intensify, which could impact our revenue, contract backlog and profit margins.
Government contracts generally have strict regulatory requirements. Approximately 74.4% of our total revenue in 2013 was derived from contracts funded by federal, state and local government agencies and authorities. Government contracts are subject to specific procurement regulations, contract provisions and a variety of socioeconomic requirements relating to their formation, administration, performance and accounting and often include express or implied certifications of compliance. Claims for civil or criminal fraud may be brought for violations of regulations, requirements or statutes. We may also be subject to qui tam (“Whistle Blower”) litigation brought by private individuals on behalf of the government under the Federal Civil False Claims Act, which could include claims for up to treble damages. Further, if we fail to comply with any of the regulations, requirements or statutes or if we have a substantial number of accumulated Occupational Safety and Health Administration, Mine Safety and Health Administration or other workplace safety violations, our existing government contracts could be terminated and we could be suspended from government contracting or subcontracting, including federally funded projects at the state level. Should one or more of these events occur, it could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
Government contractors are subject to suspension or debarment from government contracting. Our substantial dependence on government contracts exposes us to a variety of risks that differ from those associated with private sector contracts. Various statutes to which our operations are subject, including the Davis-Bacon Act (which regulates wages and benefits), the Walsh-Healy Act (which prescribes a minimum wage and regulates overtime and working conditions), Executive Order 11246 (which establishes equal employment opportunity and affirmative action requirements) and the Drug-Free Workplace Act, provide for mandatory suspension and/or debarment of contractors in certain circumstances involving statutory violations. In addition, the Federal Acquisition Regulation and various state statutes provide for discretionary suspension and/or debarment in certain circumstances that might call into question a contractor’s willingness or ability to act responsibly, including as a result of being convicted of, or being found civilly liable for, fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public contract or subcontract. The scope and duration of any suspension or debarment may vary depending upon the facts and the statutory or regulatory grounds for debarment and could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
Our success depends on attracting and retaining qualified personnel, joint venture partners and subcontractors in a competitive environment. The success of our business is dependent on our ability to attract, develop and retain qualified personnel, joint venture partners, advisors and subcontractors. Changes in general or local economic conditions and the resulting impact on the labor market and on our joint venture partners may make it difficult to attract or retain qualified individuals in the geographic areas where we perform our work. If we are unable to provide competitive compensation packages, high-quality training programs and attractive work environments or to establish and maintain successful partnerships, our ability to profitably execute our work could be adversely impacted.
Failure to maintain safe work sites could result in significant losses. Construction and maintenance sites are potentially dangerous workplaces and often put our employees and others in close proximity with mechanized equipment, moving vehicles, chemical and manufacturing processes, and highly regulated materials.  On many sites, we are responsible for safety and, accordingly, must implement safety procedures.  If we fail to implement these procedures or if the procedures we implement are ineffective, we may suffer the loss of or injury to our employees, as well as expose ourselves to possible litigation.  Despite having invested significant resources in safety programs and being recognized as an industry leader, a serious accident may nonetheless occur on one of our worksites. As a result, our failure to maintain adequate safety standards could result in reduced profitability or the loss of projects or clients, and could have a material adverse impact on our financial position, results of operations, cash flows and liquidity.
An inability to obtain bonding could have a negative impact on our operations and results. As more fully described in “Insurance and Bonding” under “Item 1. Business,” we generally are required to provide surety bonds securing our performance under the majority of our public and private sector contracts. Our inability to obtain reasonably priced surety bonds in the future could significantly affect our ability to be awarded new contracts, which could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.

14

Table of Contents

We may be unable to identify and contract with qualified Disadvantaged Business Enterprise (“DBE”) contractors to perform as subcontractors. Certain of our government agency projects contain minimum DBE participation clauses. If we subsequently fail to complete these projects with the minimum DBE participation, we may be held responsible for breach of contract, which may include restrictions on our ability to bid on future projects as well as monetary damages. To the extent we are responsible for monetary damages, the total costs of the project could exceed our original estimates, we could experience reduced profits or a loss for that project and there could be a material adverse impact to our financial position, results of operations, cash flows and liquidity.
Fixed price and fixed unit price contracts subject us to the risk of increased project cost. As more fully described in “Contract Provisions and Subcontracting” under “Item 1. Business,” the profitability of our fixed price and fixed unit price contracts can be adversely affected by a number of factors that can cause our actual costs to materially exceed the costs estimated at the time of our original bid.
Design/build contracts subject us to the risk of design errors and omissions. Design/build is increasingly being used as a method of project delivery as it provides the owner with a single point of responsibility for both design and construction. We generally subcontract design responsibility to architectural and engineering firms. However, in the event of a design error or omission causing damages, there is risk that the subcontractor or their errors and omissions insurance would not be able to absorb the liability. In this case we may be responsible, resulting in a potentially material adverse effect on our financial position, results of operations, cash flows and liquidity.
Many of our contracts have penalties for late completion. In some instances, including many of our fixed price contracts, we guarantee that we will complete a project by a certain date. If we subsequently fail to complete the project as scheduled we may be held responsible for costs resulting from the delay, generally in the form of contractually agreed-upon liquidated damages. To the extent these events occur, the total cost of the project could exceed our original estimate and we could experience reduced profits or a loss on that project.
Strikes or work stoppages could have a negative impact on our operations and results. We are party to collective bargaining agreements covering a portion of our craft workforce. Although strikes or work stoppages have not had a significant impact on our operations or results in the past, such labor actions could have a significant impact on our operations and results if they occur in the future.
Failure of our subcontractors to perform as anticipated could have a negative impact on our results. As further described in “Contract Provisions and Subcontracting” under “Item 1. Business,” we subcontract portions of many of our contracts to specialty subcontractors, but we are ultimately responsible for the successful completion of their work. Although we seek to require bonding or other forms of guarantees, we are not always successful in obtaining those bonds or guarantees from our higher-risk subcontractors. In this case we may be responsible for the failures on the part of our subcontractors to perform as anticipated, resulting in a potentially adverse impact on our cash flows and liquidity. In addition, the total costs of a project could exceed our original estimates and we could experience reduced profits or a loss for that project, which could have an adverse impact on our financial position, results of operations, cash flows and liquidity.
Our joint venture contracts subject us to joint and several liability. As further described in Note 1 of “Notes to the Consolidated Financial Statements” and under “Item 1. Business; Joint Ventures,” we participate in various construction joint venture partnerships in connection with complex construction projects. If our joint venture partners fail to perform under one of these contracts, we could be liable for completion of the entire contract. If the contract were unprofitable, this could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
Our failure to adequately recover on claims brought by us against project owners for additional contract costs could have a negative impact on our liquidity and future operations. In certain circumstances, we assert claims against project owners for additional costs exceeding the contract price or for amounts not included in the original contract price. These types of claims occur due to matters such as owner-caused delays or changes from the initial project scope, both of which may result in additional costs. Often, these claims can be the subject of lengthy arbitration or litigation proceedings, and it is difficult to accurately predict when and the terms upon which these claims will be fully resolved. When these types of events occur, we use working capital in projects to promptly and fully cover cost overruns pending the resolution of the relevant claims. A failure to recover on these types of claims promptly and fully could have a negative impact on our liquidity and results of operations. In addition, while clients and subcontractors may be obligated to indemnify us against certain liabilities, such third parties may refuse or be unable to pay us.

15

Table of Contents

Failure to remain in compliance with covenants under our debt and credit agreements, service our indebtedness, or fund our other liquidity needs could adversely impact our business. Our debt and credit agreements and related restrictive and financial covenants are more fully described in Note 12 of “Notes to the Consolidated Financial Statements.” Our failure to comply with any of these covenants, or to pay principal, interest or other amounts when due thereunder, would constitute an event of default under the applicable agreements.  Under certain circumstances, the occurrence of an event of default under one of our debt or credit agreements (or the acceleration of the maturity of the indebtedness under one of our agreements) may constitute an event of default under one or more of our other debt or credit agreements. Default under our debt and credit agreements could result in (1) us no longer being entitled to borrow under the agreements; (2) termination of the agreements; (3) the requirement that any letters of credit under the agreements be cash collateralized; (4) acceleration of the maturity of outstanding indebtedness under the agreements; and/or (5) foreclosure on any collateral securing the obligations under the agreements. On March 3, 2014, Granite executed amendments to the Credit Agreement and 2019 NPA (the “Amendments”), which terms include, among other things, (i) revised minimum Consolidated Tangible Net Worth; and (ii) revised maximum Consolidated Leverage Ratio. For the Credit Agreement, the Amendments are effective for our quarter ending March 31, 2013 and for the 2019 NPA, the Amendments are retroactive to December 31, 2013. If we are unable to service our debt obligations or fund our other liquidity needs, we could be forced to curtail our operations, reorganize our capital structure (including through bankruptcy proceedings) or liquidate some or all of our assets in a manner that could cause holders of our securities to experience a partial or total loss of their investment in us.
Unavailability of insurance coverage could have a negative effect on our operations and results. We maintain insurance coverage as part of our overall risk management strategy and pursuant to requirements to maintain specific coverage that are contained in our financing agreements and in most of our construction contracts. Although we have been able to obtain reasonably priced insurance coverage to meet our requirements in the past, there is no assurance that we will be able to do so in the future, and our inability to obtain such coverage could have an adverse impact on our ability to procure new work, which could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
Accounting for our revenues and costs involves significant estimates. As further described in “Critical Accounting Policies and Estimates” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations,” accounting for our contract-related revenues and costs, as well as other expenses, requires management to make a variety of significant estimates and assumptions. Although we believe we have sufficient experience and processes to enable us to formulate appropriate assumptions and produce reasonably dependable estimates, these assumptions and estimates may change significantly in the future and could result in the reversal of previously recognized revenue and profit. Such changes could have a material adverse effect on our financial position and results of operations.
We use certain commodity products that are subject to significant price fluctuations. Diesel fuel, liquid asphalt and other petroleum-based products are used to fuel and lubricate our equipment and fire our asphalt concrete processing plants.  In addition, they constitute a significant part of the asphalt paving materials that are used in many of our construction projects and are sold to third parties. Although we are partially protected by asphalt or fuel price escalation clauses in some of our contracts, many contracts provide no such protection. We also use steel and other commodities in our construction projects that can be subject to significant price fluctuations. We pre-purchase commodities, enter into supply agreements or enter into financial contracts to secure pricing.  We have not been significantly adversely affected by price fluctuations in the past; however, there is no guarantee that we will not be in the future.
We are subject to environmental and other regulation. As more fully described in “Environmental Regulations” under “Item 1. Business,” we are subject to a number of federal, state and local laws and regulations relating to the environment, workplace safety and a variety of socioeconomic requirements. Noncompliance with such laws and regulations can result in substantial penalties, or termination or suspension of government contracts as well as civil and criminal liability. In addition, some environmental laws and regulations impose liability and responsibility on present and former owners, operators or users of facilities and sites for contamination at such facilities and sites, without regard to causation or knowledge of contamination. We occasionally evaluate various alternatives with respect to our facilities, including possible dispositions or closures. Investigations undertaken in connection with these activities may lead to discoveries of contamination that must be remediated, and closures of facilities may trigger compliance requirements that are not applicable to operating facilities. While compliance with these laws and regulations has not materially adversely affected our operations in the past, there can be no assurance that these requirements will not change and that compliance will not adversely affect our operations in the future. Furthermore, we cannot provide assurance that existing or future circumstances or developments with respect to contamination will not require us to make significant remediation or restoration expenditures.

16

Table of Contents

Weather can significantly affect our revenues and profitability. Our ability to perform work is significantly affected by weather conditions such as precipitation and temperature. Changes in weather conditions can cause delays and otherwise significantly affect our project costs. The impact of weather conditions can result in variability in our quarterly revenues and profitability, particularly in the first and fourth quarters of the year.
Increasing restrictions on securing aggregate reserves could negatively affect our future operations and results. Tighter regulations and the finite nature of property containing suitable aggregate reserves are making it increasingly challenging and costly to secure aggregate reserves. Although we have thus far been able to secure reserves to support our business, our financial position, results of operations, cash flows and liquidity may be adversely affected by an increasingly difficult permitting process.
Force majeure events, including natural disasters and terrorists’ actions, could negatively impact our business, which may affect our financial condition, results of operations or cash flows. Force majeure or extraordinary events beyond the control of the contracting parties, such as natural and man-made disasters, as well as terrorist actions, could negatively impact the economies in which we operate.  We typically negotiate contract language where we are allowed certain relief from force majeure events in private client contracts and review and attempt to mitigate force majeure events in both public and private client contracts. We remain obligated to perform our services after most extraordinary events subject to relief that may be available pursuant to a force majeure clause.  If we are not able to react quickly to force majeure events, our operations may be affected significantly, which would have a negative impact on our financial position, results of operations, cash flows and liquidity.
Changes to our outsourced software or infrastructure vendors as well as any sudden loss, breach of security, disruption or unexpected data or vendor loss associated with our information technology systems could have a material adverse effect on our business. We rely on third-party software and infrastructure to run critical accounting, project management and financial information systems.  If software or infrastructure vendors decide to discontinue further development, integration or long-term maintenance support for our information systems, or there is any system interruption, delay, breach of security, loss of data or loss of a vendor, we may need to migrate some or all of our accounting, project management and financial information to other systems. Despite business continuity plans, these disruptions could increase our operational expense as well as impact the management of our business operations, which could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
An inability to safeguard our information technology environment could result in business interruptions, remediation costs and/or legal claims. To protect confidential customer, vendor, financial and employee information, we employ information security measures that secure our information systems from cybersecurity attacks or breaches. Even with these measures, we may be subject to unauthorized access of digital data with the intent to misappropriate information, corrupt data or cause operational disruptions. If a failure of our safeguarding measures were to occur, it could have a negative impact to our business and result in business interruptions, remediation costs and/or legal claims, which could have a material adverse effect on our financial position, results of operations, cash flow and liquidity.
A change in tax laws or regulations of any federal, state or international jurisdiction in which we operate could increase our tax burden and otherwise adversely affect our financial position, results of operations, cash flows and liquidity. We continue to assess the impact of various U.S. federal, state and international legislative proposals that could result in a material increase to our U.S. federal, state and/or international taxes. We cannot predict whether any specific legislation will be enacted or the terms of any such legislation. However, if such proposals were to be enacted, or if modifications were to be made to certain existing regulations, the consequences could have a material adverse impact on us, including increasing our tax burden, increasing our cost of tax compliance or otherwise adversely affecting our financial position, results of operations, cash flows and liquidity.

17

Table of Contents

Our contract backlog is subject to unexpected adjustments and cancellations and could be an uncertain indicator of our future earnings. We cannot guarantee that the revenues projected in our contract backlog will be realized or, if realized, will be profitable. Projects reflected in our contract backlog may be affected by project cancellations, scope adjustments, time extensions or other changes. Such changes may adversely affect the revenue and profit we ultimately realize on these projects.
We may be required to contribute cash to meet our unfunded pension obligations in certain multi-employer plans. Three of our wholly-owned subsidiaries, Granite Construction Company, Granite Construction Northeast, Inc., and Kenny Construction Company, participate in various multi-employer pension plans on behalf of union employees. Union employee benefits generally are based on a fixed amount for each year of service. We are required to make contributions to the plans in amounts established under collective bargaining agreements.  Pension expense is recognized as contributions are made. Under the Employee Retirement Income Security Act, a contributor to a multi-employer plan is liable, upon termination or withdrawal from a plan, for its proportionate share of a plan’s unfunded vested liability.  While we currently have no intention of withdrawing from a plan and unfunded pension obligations have not significantly affected our operations in the past, there can be no assurance that we will not be required to make material cash contributions to one or more of these plans to satisfy certain underfunded benefit obligations in the future.
Our strategic diversification plan includes growing our international operations in Canada and U.S. Territories, which are subject to a number of special risks. As part of our strategic diversification efforts, we may enter into more construction contracts in Canada or U.S. Territories, which may subject us to a number of special risks unique to foreign countries and/or operations. Due to the special risks associated with non-U.S. operations, our exposure to such risks may not be proportionate to the percentage of our revenues attributable to such operations.
As a part of our growth strategy we have made and may make future acquisitions, and acquisitions involve many risks. These risks include difficulties integrating the operations and personnel of the acquired companies, diversion of management’s attention from ongoing operations, potential difficulties and increased costs associated with completion of any assumed construction projects, insufficient revenues to offset increased expenses associated with acquisitions and the potential loss of key employees or customers of the acquired companies. Acquisitions may also cause us to increase our liabilities, record goodwill or other non-amortizable intangible assets that will be subject to subsequent impairment testing and potential impairment charges, as well as amortization expenses related to certain other intangible assets. Failure to manage and successfully integrate acquisitions could harm our financial position, results of operations, cash flows and liquidity.
Granite Land Company is greatly affected by the strength of the real estate industry. Our real estate investment and development activities are subject to numerous factors beyond our control including local real estate market conditions; substantial existing and potential competition; general national, regional and local economic conditions; fluctuations in interest rates and mortgage availability; and changes in demographic conditions. If our outlook for a project’s forecasted profitability deteriorates, we may find it necessary to curtail our development activities and evaluate our real estate assets for possible impairment. Our evaluation includes a variety of estimates and assumptions, and future changes in these estimates and assumptions could affect future impairment analyses. If our real estate assets are determined to be impaired, the impairment would result in a write-down of the asset in the period of the impairment. See Notes 7 and 11 of “Notes to the Consolidated Financial Statements” for additional information on impairment charges.
Our decision in October 2010 to orderly divest of our real estate investment business resulted in changes to the business plans of certain of our real estate affiliates and the recognition of impairment charges primarily in the fourth quarter of 2010, with no significant impairment charges during the years ended December 31, 2011 and 2012. During the fourth quarter of 2013, management approved revised plans to sell or otherwise dispose of the majority of assets remaining in our Real Estate segment which resulted in charges of $31.1 million, of which $3.9 million was attributable to non-controlling interests. The business plans and results of operations of our real estate affiliates are affected by the ability to obtain certain development rights, the ability to obtain financing, the future condition of the real estate and financial markets, and the timing of cash flows. A decline in the residential and/or commercial real estate markets may decrease, or lengthen, the timing of expected cash flows of certain development projects to the point that we would be required to recognize additional impairments in the future.

18

Table of Contents

Our real estate investments are subject to mortgage financing and may require additional funding. Granite Land Company’s (“GLC’s”) real estate investments generally utilize short-term debt financing for their development activities. Such financing is subject to the terms of the applicable debt or credit agreement and generally is secured by mortgages on the applicable real property. GLC’s failure to comply with the covenants applicable to such financing or to pay principal, interest or other amounts when due thereunder would constitute an event of default under the applicable agreement and could have the effects described in the risk factor relating to our debt and credit agreements. Due to the tightening of the credit markets, banks have required lower loan-to-value ratios often resulting in the need to pay a portion of the debt when short-term financing is renegotiated. If our real estate investment partners are unable to make their proportional share of a required repayment, GLC may elect to provide the additional funding which could affect our financial position, cash flows and liquidity. Also, if we determine we are the primary beneficiary of real estate joint ventures, as defined by the applicable accounting guidance, we may be required to consolidate additional real estate investments in our financial statements.
Unfavorable economic conditions may have an adverse impact on our business. Volatility in the global financial system may have an adverse impact on our business, financial position, results of operations, cash flows and liquidity. In particular, low tax revenues, budget deficits, financing constraints and competing priorities may result in cutbacks in new infrastructure projects in the public sector and could have an adverse impact on collectibility of receivables from government agencies. In addition, levels of new commercial and residential construction projects could be adversely affected by oversupply of existing inventories of commercial and residential properties, low property values and a restrictive financing environment. The depressed demand for construction and construction materials in both the public and private sectors has resulted in intensified competition, which has had an adverse impact on both our revenues and profit margins and could impact growth opportunities. Although conditions are stabilizing, these factors have also had an adverse impact on the levels of activity and financial position, results of operations, cash flows and liquidity of our real estate investment and development business.
Deterioration of the United States economy could have a material adverse effect on our business, financial condition and results of operations. Congress’ inability to lower United States debt substantially could result in a decrease in government spending, which could negatively impact the ability of government agencies to fund existing or new infrastructure projects. In addition, such actions could have a material adverse effect on the financial markets and economic conditions in the United States as well as throughout the world, which may limit our ability and the ability of our customers to obtain financing and/or could impair our ability to execute our acquisition strategy. Deterioration in general economic activity and infrastructure spending or Congress’ deficit reduction measures could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
Rising inflation and/or interest rates could have an adverse effect on our business, financial condition and results of operations. Economic factors, including inflation and fluctuations in interest rates, could have a negative impact on our business. If our costs were to become subject to significant inflationary pressures, we may not be able to fully offset such higher costs through price increases. Our inability or failure to do so could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
The foregoing list is not all-inclusive. There can be no assurance that we have correctly identified and appropriately assessed all factors affecting our business or that the publicly available and other information with respect to these matters is complete and correct. Additional risks and uncertainties not presently known to us or that we currently believe to be immaterial may also adversely affect us. These developments could have material adverse effects on our business, financial condition, results of operations and liquidity. For these reasons, the reader is cautioned not to place undue reliance on our forward-looking statements.

19

Table of Contents

Item 1B. UNRESOLVED STAFF COMMENTS
None.
Item 2. PROPERTIES
Quarry Properties
As of December 31, 2013, we had 44 active and 29 inactive permitted quarry properties available for the extraction of sand and gravel and hard rock, all of which are located in the western United States. All of our quarries are open-pit and are primarily accessible by road. We process aggregates into construction materials for internal use and for sale to third parties. Our plant equipment is powered mostly by electricity provided by local utility companies. The following map shows the approximate locations of our permitted quarry properties as of December 31, 2013.
We estimate our permitted proven1 and probable2 aggregate reserves to be approximately 780.0 million tons with an average permitted life of approximately 70 years at present operating levels. Present operating levels are determined based on a three-year annual average aggregate production rate of 10.4 million tons. Reserve estimates were made by our geologists and engineers based primarily on drilling studies. Reserve estimates are based on various assumptions, and any material inaccuracies in these assumptions could have a material impact on the accuracy of our reserve estimates.
1Proven reserves are determined through the testing of samples obtained from closely spaced subsurface drilling and/or exposed pit faces. Proven reserves are sufficiently understood so that quantity, quality, and engineering conditions are known with sufficient accuracy to be mined without the need for any further subsurface work. Actual required spacing is based on geologic judgment about the predictability and continuity of each deposit.
2Probable reserves are determined through the testing of samples obtained from subsurface drilling but the sample points are too widely spaced to allow detailed prediction of quantity, quality, and engineering conditions. Additional subsurface work may be needed prior to mining the reserve.





20
 
 
 
 



Table of Contents

The following tables present information about our quarry properties as of December 31, 2013 (tons in millions):
 
Type
 
 
 
 
Quarry Properties
Sand & Gravel
Hard Rock
Permitted Aggregate Reserves (tons)
Unpermitted Aggregate Reserves (tons)
Three-Year Annual Average Production Rate (tons)
Average Reserve Life
Owned quarry properties
27
5
445.8
347.0
5.4
86
Leased quarry properties1
26
15
333.6
86.6
5.0
47
 
1 Our leases have expiration dates which range from monthly terms to 88 years, with most including an option to renew.
 
 
Permitted Reserves
for Each Product Type (tons)
Percentage of Permitted Reserves Owned and Leased
State
Number of Properties
Sand & Gravel
Hard Rock
Owned
Leased
California
38
277.9
261.0
58
%
42
%
Non-California
35
151.9
88.6
55
%
45
%
 
During December 2013, we recorded impairment charges on five permitted quarry sites which carried aggregate reserves of approximately $9.6 million tons as of December 31, 2013.  See Note 11 of “Notes to the Consolidated Financial Statements.”
Plant Properties
We operate plants at our quarry sites to process aggregates into construction materials. Some of our quarry sites may have more than one crushing, concrete or asphalt processing plant. During 2013, we sold four aggregate crushing plants in California and four asphalt concrete plants (two in Nevada, one in Texas and one in Washington) in an effort to continuously increase efficiencies based on external and internal demands. At December 31, 2013 and 2012, we owned the following plants:
December 31,
2013
2012
Aggregate crushing plants
37

41

Asphalt concrete plants
54

58

Portland cement concrete batch plants
16

18

Asphalt rubber plants
5

5

Lime slurry plants
9

9

Other Properties 
The following table provides our estimate of certain information about other properties as of December 31, 2013:
 
Land Area (acres)
Building Square Feet
Office and shop space (owned and leased)
1,600
1,200,000
Real estate held for sale and use
4,000
As of December 31, 2013, approximately 49% of our office and shop space was attributable to our Construction segment, 10% to our Large Project Construction segment and 7% to our Construction Materials segment. The remainder is primarily attributable to administration.

21
 
 
 
 



Table of Contents

Item 3. LEGAL PROCEEDINGS 
In the ordinary course of business, we and our affiliates are involved in various legal proceedings that are pending against us and our affiliates alleging, among other things, public liability issues or breach of contract or tortious conduct in connection with the performance of services and/or materials provided, the various outcomes of which cannot be predicted with certainty. We and our affiliates are also subject to government inquiries in the ordinary course of business seeking information concerning our compliance with government construction contracting requirements and related laws and regulations.
We record liabilities in our consolidated balance sheets representing our estimated liabilities relating to legal proceedings and government inquiries to the extent that we have concluded such liabilities are probable and the amounts of such liabilities are reasonably estimable. The aggregate liabilities recorded as of December 31, 2013 and 2012 related to these matters were approximately $16.3 million and $8.6 million, respectively, and were primarily included in accrued expenses and other current liabilities on our consolidated balance sheets. Some of the matters in which we or our affiliates are involved may involve compensatory, punitive, or other claims or sanctions that, if granted, could require us to pay damages or make other expenditures in amounts that are not probable to be incurred or cannot currently be reasonably estimated. In addition, in some circumstances our government contracts could be terminated, we could be suspended or debarred, or payment of our costs could be disallowed. While any of our pending legal proceedings may be subject to early resolution as a result of our ongoing efforts to settle, whether or when any legal proceeding will be resolved through settlement is neither predictable nor guaranteed. Accordingly, it is possible that future developments in such proceedings and inquiries could require us to (i) adjust existing accruals, or (ii) record new accruals that we did not originally believe to be probable or that could not be reasonably estimated. Such changes could be material to our financial condition, results of operations and cash flows in any particular reporting period. In addition to matters that are considered probable for which the loss can be reasonably estimated, we also disclose certain matters where the loss is considered reasonably possible and is reasonably estimable. Except as noted below, we believe the aggregate range of possible loss related to matters considered reasonably possible was not material as of December 31, 2013. Our view as to such matters could change in future periods.
Investigation Related to Grand Avenue Project Disadvantaged Business Enterprise (“DBE”) Issues: On March 6, 2009, the U.S. Department of Transportation, Office of Inspector General served upon our wholly-owned subsidiary, Granite Construction Northeast, Inc. (“Granite Northeast”), a United States District Court, Eastern District of New York Grand Jury subpoena to produce documents. The subpoena sought all documents pertaining to the use of a DBE firm (the “Subcontractor”), and the Subcontractor’s use of a non-DBE subcontractor/consultant, on the Grand Avenue Bus Depot and Central Maintenance Facility for the Borough of Queens Project (the “Grand Avenue Project”), a Granite Northeast project, that began in 2004 and was substantially complete in 2008. The subpoena also sought any documents regarding the use of the Subcontractor as a DBE on any other projects and any other documents related to the Subcontractor or to the subcontractor/consultant. Granite Northeast produced the requested documents, together with other requested information. Subsequently, Granite Northeast was informed by the Department of Justice (“DOJ”) that it is a subject of the investigation, along with others, and that the DOJ believes that Granite Northeast’s claim of DBE credit for the Subcontractor was improper. In addition to the documents produced in response to the Grand Jury subpoena, Granite Northeast has provided requested information to the DOJ, along with other federal and state agencies (the “Agencies”) concerning other DBE entities for which Granite Northeast has historically claimed DBE credit. The Agencies have informed Granite Northeast that they believe that the claimed DBE credit taken for some of those other DBE entities was improper. Granite Northeast has met several times since January 2013 with Assistant United States Attorneys and the Agencies’ representatives, to discuss the status of the government’s criminal investigation of the Grand Avenue Project participants, including Granite Northeast, and for Granite Northeast and the Agencies to discuss their respective positions on, and potential resolution of, the issues raised in the investigation. Granite Northeast could be subject to civil, criminal, and/or administrative penalties or sanctions as a result of this investigation. Granite believes that the incurrence of some form of penalty or sanction is probable, and has therefore recorded the most likely amount of liability it may incur in its consolidated balance sheet as of December 31, 2013. Granite believes the likelihood of liability for amounts in excess of this accrual, up to the amount of the subcontract for the DBE Subcontractor, may be possible. The resolution of the matters under investigation could have direct or indirect consequences that could have a material adverse effect on our financial position, results of operations and/or liquidity.
Item 4. MINE SAFETY DISCLOSURES
The information concerning mine safety violations or other regulatory matters required by Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and Item 104 of Regulation S-K (17CFR 229.104) is included in Exhibit 95 to this Annual Report on Form 10-K.

22
 
 
 
 



Table of Contents

PART II
Item 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
Our common stock trades on the New York Stock Exchange under the ticker symbol GVA.
As of February 18, 2014, there were 38,919,160 shares of our common stock outstanding held by 946 shareholders of record.
We have paid quarterly cash dividends since the second quarter of 1990, and we expect to continue to do so. However, declaration and payment of dividends is within the sole discretion of our Board of Directors, subject to limitations imposed by Delaware law and compliance with our credit agreements (which allow us to pay dividends so long as we have at least $150 million in unencumbered cash and equivalents and marketable securities on our consolidated balance sheet), and will depend on our earnings, capital requirements, financial condition and such other factors as the Board of Directors deems relevant. As of December 31, 2013, we had unencumbered cash, cash equivalents and marketable securities that exceeded the aforementioned limitations.
Market Price and Dividends of Common Stock
 
 
2013 Quarters Ended
December 31,
September 30,
June 30,
March 31,
High
$
35.32

$
32.46

$
32.16

$
37.74

Low
28.35

27.88

26.07

29.55

Dividends per share
0.13

0.13

0.13

0.13

2012 Quarters Ended
 December 31,
September 30,
June 30,
March 31,
High
$
34.62

$
30.88

$
29.31

$
30.49

Low
27.50

21.58

21.38

23.79

Dividends per share
0.13

0.13

0.13

0.13

During the three months ended December 31, 2013, we did not sell any of our equity securities that were not registered under the Securities Act of 1933, as amended. The following table sets forth information regarding the repurchase of shares of our common stock during the three months ended December 31, 2013:
Period
Total Number of Shares Purchased1
Average Price Paid per Share
Total Number of Shares Purchased as Part of Publicly Announced Plans or Programs
Approximate Dollar Value of Shares that May Yet be Purchased Under the Plans or Programs2
October 1 through October 31, 2013
3,474

$
33.24

$
64,065,401

November 1 through November 30, 2013
215

$
29.53

$
64,065,401

December 1 through December 31, 2013
12,707

$
30.59

$
64,065,401

Total
16,396

$
31.14

 
 
1The number of shares purchased is in connection with employee tax withholding for shares granted under our Amended and Restated 1999 Equity Incentive Plan.
2In October 2007, our Board of Directors authorized us to purchase, at management’s discretion, up to $200.0 million of our common stock. Under this purchase program, the Company may purchase shares from time to time on the open market or in private transactions. The specific timing and amount of purchases will vary based on market conditions, securities law limitations and other factors. Purchases under the share purchase program may be commenced, suspended or discontinued at any time and from time to time without prior notice.

23
 
 
 
 



Table of Contents

Performance Graph
The following graph compares the cumulative 5-year total return provided to shareholders on Granite Construction Incorporated’s common stock relative to the cumulative total returns of the S&P 500 index and the Dow Jones U.S. Heavy Construction index. The Dow Jones U.S. Heavy Construction index includes the following companies: AECOM Technology Corp., Chicago Bridge & Iron Co NV, EMCOR Group Inc., Fluor Corp., Foster Wheeler AG, Granite Construction Incorporated, Jacobs Engineering Group Inc., KBR Inc., and Quanta Services Inc. Certain of these companies differ from Granite in that they derive revenue and profit from non-U.S. operations and have customers in different markets. An investment of $100 (with reinvestment of all dividends) is assumed to have been made in our common stock and in each of the indexes on December 31, 2008 and its relative performance is tracked through December 31, 2013.


December 31,
2008
2009
2010
2011
2012
2013
Granite Construction Incorporated
$
100.00

$
77.78

$
64.65

$
57.18

$
82.53

$
87.29

S&P 500
100.00

126.46

145.51

148.59

172.37

228.19

Dow Jones U.S. Heavy Construction
100.00

114.31

146.77

121.00

146.93

192.89



24
 
 
 
 



Table of Contents

Item 6. SELECTED FINANCIAL DATA
Other than contract backlog, the selected consolidated financial data set forth below have been derived from our consolidated financial statements. Refer to the consolidated financial statements for further information. These historical results are not necessarily indicative of the results of operations to be expected for any future period.
Selected Consolidated Financial Data
Years Ended December 31,
2013
2012
2011
2010
2009
Operating Summary
(Dollars In Thousands, Except Per Share Data)
Revenue
$
2,266,901

$
2,083,037

$
2,009,531

$
1,762,965

$
1,963,479

Gross profit
185,263

234,759

247,963

177,784

349,509

As a percent of revenue
8.2
 %
11.3
%
12.3
%
10.1
 %
17.8
%
Selling, general and administrative expenses
199,946

185,099

162,302

191,593

228,046

As a percent of revenue
8.8
 %
8.9
%
8.1
%
10.9
 %
11.6
%
Restructuring and impairment charges (gains), net1
52,139

(3,728
)
2,181

109,279

9,453

Net (loss) income
(44,766
)
59,920

66,085

(62,448
)
100,201

Amount attributable to non-controlling interests
8,343

(14,637
)
(14,924
)
3,465

(26,701
)
Net (loss) income attributable to Granite
(36,423
)
45,283

51,161

(58,983
)
73,500

As a percent of revenue
(1.6
)%
2.2
%
2.5
%
(3.3
)%
3.7
%
Net (loss) income per share attributable to
common shareholders:
 

 

 

 

 

Basic
$
(0.94
)
$
1.17

$
1.32

$
(1.56
)
$
1.91

Diluted
$
(0.94
)
$
1.15

$
1.31

$
(1.56
)
$
1.90

Weighted average shares of common stock:
 

 

 

 

 

Basic
38,803

38,447

38,117

37,820

37,566

Diluted
38,803

39,076

38,473

37,820

37,683

Dividends per common share
$
0.52

$
0.52

$
0.52

$
0.52

$
0.52

Consolidated Balance Sheet2
 

 

 

 

 

Total assets
$
1,617,155

$
1,729,487

$
1,547,799

$
1,535,533

$
1,709,575

Cash, cash equivalents and marketable securities
346,323

433,420

406,648

395,728

458,341

Working capital
452,633

490,785

461,254

475,079

500,605

Current maturities of long-term debt
1,247

19,060

32,173

38,119

58,978

Long-term debt
276,868

271,070

218,413

242,351

244,688

Other long-term liabilities
48,580

47,124

49,221

47,996

48,998

Granite shareholders’ equity
781,940

829,953

799,197

761,031

830,651

Book value per share
20.09

21.43

20.66

19.64

21.50

Common shares outstanding
38,918

38,731

38,683

38,746

38,635

Contract backlog
$
2,526,751

$
1,708,761

$
2,022,454

$
1,899,170

$
1,401,988

1 During 2013, we recorded restructuring charges of $49.0 million related to our 2010 Enterprise Improvement Plan and $3.2 million in other impairment charges related to nonperforming quarry sites. During 2012, we recorded net restructuring gains of $3.7 million and, during 2011, we recorded net restructuring charges of $2.2 million (see Note 11 of the “Notes to the Consolidated Financial Statements” for additional information regarding the 2013, 2012 and 2011 amounts). During 2010, we recorded restructuring charges of $109.3 million related to our 2010 Enterprise Improvement Plan, and during 2009 we recorded $9.5 million of restructuring charges related to an organizational change.
2 Assets acquired and liabilities assumed resulting from the acquisition of Kenny Construction Company are included in our consolidated balance sheet commencing as of December 31, 2012 (see Note 21 of the “Notes to the Consolidated Financial Statements”).




25
 
 
 
 



Table of Contents

Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
General
We are one of the largest diversified heavy civil contractors and construction materials producers in the United States, engaged in the construction and improvement of streets, roads, highways, mass transit facilities, airport infrastructure, bridges, trenchless and underground utilities, electrical utilities, tunnels, dams and other infrastructure-related projects. We own aggregate reserves and plant facilities to produce construction materials for use in our construction business and for sale to third parties. We also operate a real estate investment business that we have been divesting of over the past three years as part of our 2010 Enterprise Improvement Plan (“EIP”). Our permanent offices are located in Alaska, Arizona, California, Colorado, Florida, Illinois, Nevada, New York, Texas, Utah and Washington. We have four reportable business segments: Construction, Large Project Construction, Construction Materials and Real Estate (see Note 20 of the “Notes to the Consolidated Financial Statements”).
Our construction contracts are obtained through competitive bidding in response to solicitations by both public agencies and private parties and on a negotiated basis as a result of solicitations from private parties. Project owners use a variety of methods to make contractors aware of new projects, including posting bidding opportunities on agency websites, disclosing long-term infrastructure plans, advertising and other general solicitations. Our bidding activity is affected by such factors as the nature and volume of advertising and other solicitations, contract backlog, available personnel, current utilization of equipment and other resources, our ability to obtain necessary surety bonds and competitive considerations. Our contract review process includes identifying risks and opportunities during the bidding process and managing these risks through mitigation efforts such as insurance and pricing. Contracts fitting certain criteria of size and complexity are reviewed by various levels of management and, in some cases, by the Executive Committee of our Board of Directors. Bidding activity, contract backlog and revenue resulting from the award of new contracts may vary significantly from period to period.
Our typical construction project begins with the preparation and submission of a bid to a customer. If selected as the successful bidder, we generally enter into a contract with the customer that provides for payment upon completion of specified work or units of work as identified in the contract. We usually invoice our customers on a monthly basis. Our contracts frequently call for retention that is a specified percentage withheld from each payment until the contract is completed and the work accepted by the customer. Additionally, we generally defer recognition of profit on projects until they reach at least 25% completion (see “Gross Profit” discussion below) and our profit recognition is based on estimates that may change over time. Our revenue, gross margin and cash flows can differ significantly from period to period due to a variety of factors, including the projects’ stage of completion, the mix of early and late stage projects, our estimates of contract costs, outstanding contract change orders and claims and the payment terms of our contracts. The timing differences between our cash inflows and outflows require us to maintain adequate levels of working capital.

26
 
 
 
 



Table of Contents

The four primary economic drivers of our business are (1) the overall health of the economy; (2) federal, state and local public funding levels; (3) population growth resulting in public and private development; and (4) the need to replace or repair aging infrastructure. A stagnant or declining economy will generally result in reduced demand for construction and construction materials in the private sector. This reduced demand increases competition for private sector projects and will ultimately also increase competition in the public sector as companies migrate from bidding on scarce private sector work to projects in the public sector. Greater competition can reduce our revenues and/or have a downward impact on our gross profit margins. In addition, a stagnant or declining economy tends to produce less tax revenue for public agencies, thereby decreasing a source of funds available for spending on public infrastructure improvements. Some funding sources that have been specifically earmarked for infrastructure spending, such as diesel and gasoline taxes, are not as directly affected by a stagnant or declining economy, unless actual consumption is reduced. However, even these can be temporarily at risk as federal, state and local governments take actions to balance their budgets. Additionally, high fuel prices can have a dampening effect on consumption, resulting in overall lower tax revenue. Conversely, increased levels of public funding as well as an expanding or robust economy will generally increase demand for our services and provide opportunities for revenue growth and margin improvement.
In addition to business segments, we review our business by operating groups and by public and private market sectors. Our operating groups are defined as follows: 1) California; 2) Northwest, which primarily includes offices in Alaska, Arizona, Nevada, Utah and Washington; 3) Heavy Civil (formerly East), which primarily includes offices in California, Florida, New York and Texas; and 4) Kenny, which primarily includes offices in Colorado and Illinois. Each of these operating groups may include financial results from our Construction and Large Project Construction segments. A project’s results are reported in the operating group that is responsible for the project, not necessarily the geographic area where the work is located. In some cases, the operations of an operating group include the results of work performed outside of that geographic region. Our California and Northwest operating groups include financial results from our Construction Materials segment.
Effective in the third quarter of 2013, we made certain changes to the organizational structure of the four operating groups. The most significant changes were to move our Arizona business from the Heavy Civil operating group to the Northwest operating group, and to reclassify the majority of the complex heavy-civil construction contracts to the Heavy Civil operating group. These changes were designed to improve operating efficiencies and better position the Company for long-term growth. Prior period amounts associated with these changes have been reclassified to conform to the current year presentation. These changes had no impact on our reportable business segments.
Critical Accounting Policies and Estimates
The financial statements included in “Item 8. Financial Statements and Supplementary Data” have been prepared in accordance with accounting principles generally accepted in the United States of America.  The preparation of these financial statements requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, revenue and expenses, and related disclosure of contingent assets and liabilities. Our estimates, judgments and assumptions are continually evaluated based on available information and experiences; however, actual amounts could differ from those estimates.
The following are accounting policies and estimates that involve significant management judgment and can have significant effects on the Company’s reported results of operations. The Audit/Compliance Committee of our Board of Directors has reviewed our disclosure of critical accounting policies and estimates.  

27
 
 
 
 



Table of Contents

Revenue and Earnings Recognition for Construction Contracts
Revenue and earnings on construction contracts, including construction joint ventures, are recognized under the percentage of completion method using the ratio of costs incurred to estimated total costs. For the majority of our contracts, revenue in an amount equal to cost incurred is recognized prior to contracts reaching at least 25% completion, thus deferring the related profit. Based on historical experience, it is our judgment that until a project reaches at least 25% completion, there may be insufficient information to determine the estimated profit other than to be reasonably certain that a contract will not incur a loss. In the case of large, complex projects we may defer profit recognition beyond the point of 25% completion based on an evaluation of specific project risks. The factors considered in this evaluation include the stage of design completion, the stage of construction completion, status of outstanding purchase orders and subcontracts, certainty of quantities of labor and materials, certainty of schedule and the relationship with the owner. In the case of construction management, time and materials and cost-plus arrangements, we are generally able to estimate profit as services are performed based on contractual rates and estimable volumes. Therefore, we recognize profit for these types of contracts on an input basis, as services are performed.
Revenue from affirmative contract claims is recognized when we have a signed agreement and payment is assured. Revenue from contract change orders, which occur in most large projects, is recognized when the owner has agreed to the change order in writing. Provisions are recognized in the consolidated statements of operations for the full amount of estimated losses on uncompleted contracts whenever evidence indicates that the estimated total cost of a contract exceeds its estimated total revenue. All contract costs, including those associated with affirmative claims and change orders, are recorded as incurred and revisions to estimated total costs are reflected as soon as the obligation to perform is determined. Contract costs consist of direct costs on contracts, including labor and materials, amounts payable to subcontractors, direct overhead costs and equipment expense (primarily depreciation, fuel, maintenance and repairs). All state and federal government contracts and many of our other contracts provide for termination of the contract at the convenience of the party contracting with us, with provisions to pay us for work performed through the date of termination.
The accuracy of our revenue and profit recognition in a given period is dependent on the accuracy of our estimates of the cost to complete each project. Cost estimates for all of our significant projects use a detailed “bottom up” approach and we believe our experience allows us to provide materially reliable estimates generally upon incurring 25% of expected costs. There are a number of factors that can contribute to changes in estimates of contract cost and profitability. The most significant of these include:
the completeness and accuracy of the original bid;
costs associated with scope changes where final price negotiations are not complete;
costs of labor and/or materials;
extended overhead due to owner, weather and other delays;
subcontractor performance issues;
changes in productivity expectations;
site conditions that differ from those assumed in the original bid (to the extent contract remedies are unavailable);
continuing changes from original design on design/build projects;
the availability and skill level of workers in the geographic location of the project;
a change in the availability and proximity of equipment and materials; and
our ability to fully and promptly recover on claims for additional contract costs.
The foregoing factors as well as the stage of completion of contracts in process and the mix of contracts at different margins may cause fluctuations in gross profit between periods. Significant changes in cost estimates, particularly in our larger, more complex projects, have had, and can in future periods have, a significant effect on our profitability.
Our contracts with our customers are primarily either “fixed unit price” or “fixed price.” Under fixed unit price contracts, we are committed to provide materials or services required by a project at fixed unit prices (for example, dollars per cubic yard of concrete placed or cubic yards of earth excavated). While the fixed unit price contract shifts the risk of estimating the quantity of units required for a particular project to the customer, any increase in our unit cost over the expected unit cost in the bid, whether due to inflation, inefficiency, faulty estimates or other factors, is borne by us unless otherwise provided in the contract. Fixed price contracts are priced on a lump-sum basis under which we bear the risk that we may not be able to perform all the work profitably for the specified contract amount. The percentage of fixed price contracts in our contract backlog increased from 56.8% at December 31, 2012 to 63.5% at December 31, 2013. The percentage of fixed unit price contracts in our contract backlog was 26.0% and 39.6% at December 31, 2013 and 2012, respectively. All other types of contracts represented 10.5% and 3.6% of our contract backlog at December 31, 2013 and 2012, respectively.

28
 
 
 
 



Table of Contents

Valuation of Real Estate Held for Development and Sale
The carrying amount of each consolidated real estate development project is reviewed on a quarterly basis in accordance with Accounting Standards Codification (“ASC”) Topic 360, Property, Plant, and Equipment, and each real estate development project accounted for under the equity method of accounting is reviewed in accordance with ASC Topic 323, Investments - Equity Method and Joint Ventures, to determine if impairment charges should be recognized. The review of each consolidated project includes an evaluation to determine if events or changes in circumstances indicate that a consolidated project’s carrying amount may not be recoverable. If events or changes in circumstances indicate that a consolidated project’s carrying amount may not be recoverable, the future undiscounted cash flows are estimated and compared to the project’s carrying amount. In the event that the project’s estimated future undiscounted cash flows are not sufficient to recover the carrying amounts, it is written down to its estimated fair value. The projects accounted for under the equity method are evaluated for impairment using the other-than-temporary impairment model, which requires an impairment charge to be recognized if our investment’s carrying amount exceeds its fair value, and the decline in fair value is deemed to be other than temporary.
Events or changes in circumstances, which would cause us to review for impairment include, but are not limited to: 
significant decreases in the market price of the asset;
significant adverse changes in legal factors or the business climate;
significant changes to the development or business plans of a project;
accumulation of costs significantly in excess of the amount originally expected for the acquisition, development or construction of the asset; and
current period cash flow or operating losses combined with a history of losses, or a forecast of continuing losses associated with the use of the asset.
Future undiscounted cash flows and fair value assessments are estimated based on entitlement status, market conditions, cost of construction, debt load, development schedules, status of joint venture partners and other factors applicable to the specific project. Fair value is estimated based on the expected future cash flows attributable to the asset or group of assets and on other assumptions that market participants would use in determining fair value, such as market discount rates, transaction prices for other comparable assets, and other market data. Our estimates of cash flows may differ from actual cash flows due to, among other things, fluctuations in interest rates, decisions made by jurisdictional agencies, economic conditions, or changes to our business operations.
During the fourth quarter of 2013, management approved the plan to sell or otherwise dispose of all of the remaining consolidated real estate investments that were included in our EIP. As a result, during the year ended December 31, 2013, we recorded restructuring charges of $31.1 million, of which $3.9 million was attributable to non-controlling interests, which consisted of non-cash impairment charges on consolidated real estate assets. During the years ended December 31, 2012 and 2011, we recorded no significant restructuring charges related to our real estate development projects or investments. See “Restructuring and Impairment Charges (Gains), Net” below and Note 11 of “Notes to the Consolidated Financial Statements” for further information.
An evaluation of the entitlement status, market conditions, existing offers to purchase, cost of construction, debt load, development schedule, status of joint venture partners and other factors specific to the remainder of our unconsolidated real estate projects resulted in no significant impairment charges during the year ended December 31, 2013.
Given the current economic environment surrounding real estate, we regularly evaluate the recoverability of our real estate held for development and sale.

29
 
 
 
 



Table of Contents

Goodwill
As of December 31, 2013, we had five reporting units in which goodwill was recorded as follows:
California Group Construction
Kenny Group Construction
Kenny Group Large Project Construction
Northwest Group Construction
Northwest Group Construction Materials
The most significant goodwill balances reside in the reporting units associated with the Kenny Group.
We perform impairment tests annually as of December 31 and more frequently when events and circumstances occur that indicate a possible impairment of goodwill. In addition, we evaluate goodwill for impairment if events or circumstances change between annual tests indicating a possible impairment.  Examples of such events or circumstances include the following: 
a significant adverse change in legal factors or in the business climate; 
an adverse action or assessment by a regulator; 
a more likely than not expectation that a segment or a significant portion thereof will be sold; or 
the testing for recoverability of a significant asset group within the segment. 
In performing step one of the goodwill impairment tests, we calculate the estimated fair value of the reporting unit in which the goodwill is recorded using the discounted cash flows and market multiple methods.  Judgments inherent in these methods include the determination of appropriate discount rates, the amount and timing of expected future cash flows and growth rates, and appropriate benchmark companies. The cash flows used in our 2013 discounted cash flow model were based on five-year financial forecasts, which in turn were based on the 2014-2016 operating plan developed internally by management adjusted for market participant based assumptions. Our discount rate assumptions are based on an assessment of equity cost of capital and appropriate capital structure for our reporting units. In assessing the reasonableness of our determined fair values of our reporting units, we evaluate our results against our current market capitalization. 
After calculating the estimated fair value, we compare the resulting fair value to the net book value of the reporting unit, including goodwill. If the net book value of a reporting unit exceeds its fair value, we measure and record the amount of the impairment loss by comparing the implied fair value of the reporting unit’s goodwill with the carrying amount of that goodwill.
The results of our annual goodwill impairment tests indicated that the estimated fair values of our reporting units exceeded their net book values (i.e., cushion) by at least 50% for three of the five reporting units. The Northwest Construction Materials and Kenny Large Project Construction reporting units had goodwill balances of $1.9 million and $22.4 million, respectively, as of December 31, 2013 and fair value of equity exceeded the net book value by 48% and 42%, respectively.
The Northwest Construction Materials business is susceptible to state and local spending as well as private spending on residential and commercial construction. While the current cushion is sufficient, any significant margin degradation caused by low volumes or increased production costs could result in a future impairment. The Kenny Large Project Construction business is susceptible to fluctuations in results depending on awarded work given the size and frequency of awards. While we believe the current cushion is adequate to absorb these fluctuations, a significant decline in job win rates could have a significant impact to this reporting unit’s estimated fair value.



30
 
 
 
 



Table of Contents

Long-lived Assets
We review property and equipment and amortizable intangible assets for impairment whenever events or changes in circumstances indicate the net book value of an asset may not be recoverable. Recoverability of these assets is measured by comparison of their net book values to the future undiscounted cash flows the assets are expected to generate. If the assets are considered to be impaired, an impairment charge will be recognized equal to the amount by which the net book value of the asset exceeds its fair value. We group plant equipment assets at a regional level, which represents the lowest level for which identifiable cash flows are largely independent of the cash flows of other groups of assets. When an individual asset or group of assets are determined to no longer contribute to the vertically integrated asset group, it is assessed for impairment independently.
During 2013 and in connection with our EIP, we recorded $14.7 million in restructuring charges and, separate from the EIP, recorded $3.2 million in non-cash impairment charges, related to the Construction Materials segment. The restructuring and impairment charges consisted of non-cash impairment charges to non-performing quarry sites which had an aggregate carrying value of $21.3 million prior to the impairment. Separate from these quarry sites, but in connection with the impairment of these assets, we recorded lease termination charges of $3.2 million. See Note 11 of “Notes to the Consolidated Financial Statements” and “Restructuring and Impairment Charges (Gains), Net” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” for additional information.
Insurance Estimates
We carry insurance policies to cover various risks, primarily general liability, automobile liability and workers compensation, under which we are liable to reimburse the insurance company for a portion of each claim paid. Payment for general liability and workers compensation claim amounts generally range from the first $0.5 million to $1.0 million per occurrence. We accrue for probable losses, both reported and unreported, that are reasonably estimable using actuarial methods based on historic trends, modified, if necessary, by recent events. Changes in our loss assumptions caused by changes in actual experience would affect our assessment of the ultimate liability and could have an effect on our operating results and financial position up to $1.0 million per occurrence.
Asset Retirement and Reclamation Obligations
We account for the costs related to legal obligations to reclaim aggregate mining sites and other facilities by recording our estimated reclamation liability at fair value, capitalizing the estimated liability as part of the related asset’s carrying amount and allocating it to expense over the asset’s useful life. To determine the fair value of the obligation, we estimate the cost for a third-party to perform the legally required reclamation including a reasonable profit margin. This cost is then increased for future estimated inflation based on the estimated years to complete and discounted to fair value using present value techniques with a credit-adjusted, risk-free rate. In estimating the settlement date, we evaluate the current facts and conditions to determine the most likely settlement date.
We review reclamation obligations at least annually for a revision to the cost or a change in the estimated settlement date. Additionally, reclamation obligations are reviewed in the period that a triggering event occurs that would result in either a revision to the cost or a change in the estimated settlement date.
Contingencies
We are currently involved in various claims and legal proceedings. Loss contingency provisions are recorded if the potential loss from any claim, asserted or unasserted, or legal proceeding is considered probable and the amount can be reasonably estimated. If a potential loss is considered probable but only a range of loss can be determined, the low-end of the range is recorded. These accruals represent management’s best estimate of probable loss. Disclosure also is provided when it is reasonably possible that a loss will be incurred or when it is reasonably possible that the amount of a loss will exceed the amount recorded. Significant judgment is required in both the determination of probability of loss and the determination as to whether an exposure is reasonably estimable. Because of uncertainties related to these matters, accruals are based only on the best information available at the time. As additional information becomes available, we reassess the potential liability related to claims and litigation and may revise our estimates.


31
 
 
 
 



Table of Contents

Current Economic Environment and Outlook for 2014
Company backlog, more than $2.5 billion at the end of 2013, continues to trend positively against a backdrop of stable, but short-term, public funding, and improved execution of the Transportation Infrastructure Financing and Innovation Act (“TIFIA”). These factors have contributed to continued significant bidding opportunities for our Large Project Construction segment. We also are benefiting from revenue synergies in our diversification markets, especially in power, tunnel and underground. We continue to operate in a highly competitive bidding environment in many of our traditional Western markets, as the unusually long and deep cyclical downturn has made it difficult to estimate the timing or strength of the recovery. While we are encouraged by continued signs of recovery in the private sector, the improvement to date primarily has impacted specific regions of residential construction. Our Construction segment is expected to perform better in 2014, in line with the modest improvement in the economic and public funding environment in the Western state and local communities we serve.
Our Large Project Construction segment is operating well, as we execute on a healthy portfolio of diverse projects ranging from start-up to near completion. We look to grow our portfolio of new work in 2014. In 2014, we expect to bid on more than $13 billion of large projects with about half of that value representing potential Granite future revenue. Looking past 2014, we are tracking an additional $20 billion in large projects.
Despite the current healthy large projects bidding environment, long-term, dedicated federal funding remains a concern. The two-year federal highway bill, Moving Ahead for Progress in the 21st Century, signed in 2012, importantly increased TIFIA financing. This bill expires in September of 2014, and it requires strong attention from Congress to provide the long-term stability of a new highway bill. Funding and financing stability ultimately remains critical to driving progress on important infrastructure investment, at federal, state and local levels.
During the fourth quarter of 2013, We concluded the majority of our 2010 EIP. As the impaired assets are sold, we may recognize additional restructuring charges or gains; however, we do not expect these charges or gains to be material. Additionally, as we complete our EIP and further divest of the real estate investment business, we will sell or otherwise dispose of the remaining $33.9 million of assets representing 10 consolidated and unconsolidated properties.

Results of Operations
Comparative Financial Summary
 
 
 
 
 
 
Years Ended December 31,
 
2013
 
2012
 
2011
(in thousands)
 
 
 
 
 
 
Total revenue
 
$
2,266,901

 
$
2,083,037

 
$
2,009,531

Gross profit
 
185,263

 
234,759

 
247,963

Restructuring and impairment charges (gains), net
 
52,139

 
(3,728
)
 
2,181

Operating (loss) income
 
(54,692
)
 
80,835

 
99,269

Total other (expense) income
 
(9,337
)
 
194

 
(9,836
)
Amount attributable to non-controlling interests
 
8,343

 
(14,637
)
 
(14,924
)
Net (loss) income attributable to Granite Construction Incorporated
 
(36,423
)
 
45,283

 
51,161



32
 
 
 
 



Table of Contents

Revenue
Total Revenue by Segment
 
 
 
 
 
 
 
 
 
 
Years Ended December 31,
2013
2012
 
2011
(dollars in thousands)
 
 
 
 
 
 
 
 
 
 
Construction
$
1,251,197

 
55.2
%
$
984,106

 
47.2
%
 
$
1,043,614

 
51.9
%
Large Project Construction
777,811

 
34.3

863,217

 
41.5

 
725,043

 
36.1

Construction Materials
237,752

 
10.5

230,642

 
11.1

 
220,583

 
11.0

Real Estate
141

 

5,072

 
0.2

 
20,291

 
1.0

Total
$
2,266,901

 
100.0
%
$
2,083,037

 
100.0
%
 
$
2,009,531

 
100.0
%
Construction Revenue
 
 
 
 
 
 
 
 
 
 
Years Ended December 31,
2013
2012
 
2011
(dollars in thousands)
 
 
 
 
 
 
 
 
 
 
California:
 
 
 
 
 
 
 
 
 
 
Public sector
$
386,050

 
31.0
%
$
434,570

 
44.1
%
 
$
464,288

 
44.5
%
Private sector
85,219

 
6.8

53,886

 
5.5

 
46,694

 
4.5

Northwest:
 
 
 
 
 
 

 
 
 
 
Public sector
442,089

 
35.3

371,917

 
37.8

 
480,015

 
46.0

Private sector
132,907

 
10.6

114,851

 
11.7

 
37,698

 
3.6

Heavy Civil:
 
 
 
 
 
 

 
 
 
 
Public sector
4,093

 
0.3

8,798

 
0.9

 
14,919

 
1.4

Private sector
528

 

84

 

 

 

Kenny:
 
 
 
 
 
 
 
 
 
 
Public sector
77,953

 
6.2


 

 

 

Private sector
122,358

 
9.8


 

 

 

Total
$
1,251,197

 
100.0
%
$
984,106

 
100.0
%
 
$
1,043,614

 
100.0
%
Construction revenue for the year ended December 31, 2013 increased by $267.1 million, or 27.1%, compared to the year ended December 31, 2012 primarily due to the acquisition of Kenny in December 2012. The remaining increase resulted from increases in Northwest public and private sectors as well as in California private sector revenues, offset by decreases in California public sector revenue due to fluctuations in bidding success and resulting awards.

33
 
 
 
 



Table of Contents

Large Project Construction Revenue
 
 
 
 
 
 
 
 
 
 
 
 
Years Ended December 31,
 
2013
 
2012
 
2011
(dollars in thousands)
 
 
 
 
 
 
 
 
 
 
 
 
California1
 
$
73,486

 
9.5
%
 
$
73,359


8.5
%
 
$
67,948

 
9.4
%
Northwest1
 
24,085

 
3.1

 
175,595

 
20.3

 
134,217

 
18.5

Heavy Civil1
 
623,166

 
80.1

 
614,263

 
71.2

 
522,878

 
72.1

Kenny:
 
 
 

 
 
 

 
 
 

Public sector
 
55,174

 
7.1

 

 

 

 

Private sector
 
1,900

 
0.2

 

 

 

 

Total
 
$
777,811

 
100.0
%
 
$
863,217

 
100.0
%
 
$
725,043

 
100.0
%
1For the periods presented, all Large Project Construction revenue was earned from the public sector.
Large Project Construction revenue for the year ended December 31, 2013 decreased by $85.4 million, or 9.9%, compared to the year ended December 31, 2012. The decrease was primarily due to ongoing projects nearing completion, a lack of Large Project Construction awards during 2012 and new projects in the early stage of completion. These decreases were partially offset by increases from the acquisition of Kenny in December 2012. Despite the decrease in revenue since 2012, Large Project Construction contract backlog as of December 31, 2013 increased by $769.0 million, or 71.4%, when compared to December 31, 2012.  See “Contract Backlog” section below.
Construction Materials Revenue1
 
 
 
 
 
 
 
 
 
 
 
 
Years Ended December 31,
 
2013
 
2012
 
2011
(dollars in thousands)
 
 
 
 
 
 
 
 
 
 
 
 
California
 
$
134,556

 
56.6
%
 
$
140,315

 
60.8
%
 
$
140,468

 
63.7
%
Northwest
 
103,196

 
43.4

 
90,327

 
39.2

 
80,115

 
36.3

Total
 
$
237,752

 
100.0
%
 
$
230,642

 
100.0
%
 
$
220,583

 
100.0
%
 
1For the periods presented, all Construction Materials revenue was earned from the California and Northwest groups.
Construction Materials revenue for the year ended December 31, 2013 increased $7.1 million, or 3.1%, when compared to the year ended December 31, 2012 primarily due to increased sales volumes to meet demand for new projects within the Northwest group. The Northwest group increases were partially offset by a decrease in the California group due to continued weakness in the commercial and residential development markets.
Real Estate Revenue
Real Estate revenue for the year ended December 31, 2013 decreased by $4.9 million, or 97.2%, compared to the year ended December 31, 2012. The decrease was primarily attributable to the sale of commercial properties in California during 2012 with no corresponding sales in 2013. Factors that contribute to fluctuations in revenue include national and local market conditions, entitlement status of properties and buyers access to capital.

34
 
 
 
 



Table of Contents

Contract Backlog
Our contract backlog consists of the remaining unearned revenue on awarded contracts, including 100% of our consolidated joint venture contracts and our proportionate share of unconsolidated joint venture contracts. We generally include a project in our contract backlog at the time it is awarded and funding is in place. Certain federal government contracts where funding is appropriated on a periodic basis are included in contract backlog at the time of the award. Existing contracts that include unexercised contract options and unissued task orders under existing contracts are included in contract backlog as task orders are issued or options are exercised as further described in “Contract Backlog” under “Item 1. Business”. Substantially all of the contracts in our contract backlog may be canceled or modified at the election of the customer; however, we have not been materially adversely affected by contract cancellations or modifications in the past. 
The following tables illustrate our contract backlog as of the respective dates:
Total Contract Backlog by Segment
 
  
December 31,
 
2013
 
2012
(dollars in thousands)
 
 
 
 
 
 
 
 
Construction
 
$
681,415

 
27.0
%
 
$
632,420

 
37.0
%
Large Project Construction
 
1,845,336

 
73.0

 
1,076,341

 
63.0

Total
 
$
2,526,751

 
100.0
%
 
$
1,708,761

 
100.0
%
Construction Contract Backlog
 
 
 
 
December 31,
 
2013
 
2012
(dollars in thousands)
 
 
 
 
 
 
 
 
California:
 
 
 
 
 
 
 
 
Public sector
 
$
387,251

 
56.9
%
 
$
249,966

 
39.5
%
Private sector
 
33,365

 
4.9

 
42,622

 
6.7

Northwest:
 
 
 
 

 
 

 
 

Public sector
 
118,123

 
17.3

 
167,728

 
26.5

Private sector
 
21,418

 
3.1

 
27,437

 
4.3

Heavy Civil:
 
 
 
 

 
 

 
 

Public sector
 
46,972

 
6.9

 
2,245

 
0.4

Private sector
 

 

 
528

 
0.1

Kenny:
 
 
 
 
 
 
 
 
Public sector
 
46,956

 
6.9

 
39,675

 
6.3

Private sector
 
27,330

 
4.0

 
102,219

 
16.2

Total
 
$
681,415

 
100.0
%
 
$
632,420

 
100.0
%
Construction contract backlog of $681.4 million at December 31, 2013 was $49.0 million, or 7.7%, higher than at December 31, 2012. The increase was primarily due to an improved success rate on bidding activity in the California and Heavy Civil operating groups, partially offset by progress on existing projects in the Northwest and Kenny operating groups. Not included in Construction contract backlog as of December 31, 2013 is $131.3 million associated with Kenny underground contracts, the majority of which is expected to be booked into contract backlog as additional task orders are issued by the owners, the majority of which is expected to occur in 2014.

35
 
 
 
 



Table of Contents

Large Project Construction Contract Backlog
 
  
 
   
December 31,
 
2013
 
2012
(dollars in thousands)
 
 
 
 
 
 
 
 
California1
 
$
55,593

 
3.0
%
 
$
94,901

 
8.8
%
Northwest1
 
6,860

 
0.4

 
28,703

 
2.7

Heavy Civil1
 
1,445,849

 
78.4

 
737,665

 
68.5

Kenny:
 
 
 
 
 
 
 
 
Public sector2
 
161,361

 
8.7

 
215,072

 
20.0

Private sector
 
175,673

 
9.5

 

 

Total
 
$
1,845,336

 
100.0
%
 
$
1,076,341

 
100.0
%
1For the periods presented, all Large Project Construction contract backlog is related to contracts with public agencies.
2As of December 31, 2013 and 2012, $58.4 million and $69.5 million, respectively, of Kenny public sector contract backlog was translated from Canadian dollars to U.S. dollars at the spot rate in effect at the date of reporting.
Large Project Construction contract backlog of $1.8 billion at December 31, 2013 was $769.0 million, or 71.4%, higher than at December 31, 2012. The increase from December 31, 2012 included the award of a $177.2 million material management contract in the Kenny operating group and new awards in the Heavy Civil operating group, offset by jobs completing or nearing completion in the California and Northwest operating groups. New awards in the Heavy Civil operating group included $733.0 million for our share of the Tappan Zee Bridge project in New York, a $296.0 million highway rebuild project in Texas and a $131.3 million highway reconstruction project in North Carolina. Not included in Large Project Construction contract backlog as of December 31, 2013 is $29.4 million associated with one highway rebuild project in Texas that will be booked into contract backlog as contract options are exercised by the owner, the majority of which is expected to occur in 2016.
Non-controlling partners’ share of Large Project Construction contract backlog as of December 31, 2013 and 2012 was $59.2 million and $112.8 million, respectively.
Large Project Construction contracts with forecasted losses represented $127.8 million, or 6.9%, and $172.6 million, or 16.0%, respectively, of Large Project Construction contract backlog at December 31, 2013 and 2012. Provisions are recognized in the consolidated statements of operations for the full amount of estimated losses on uncompleted contracts whenever evidence indicates that the estimated total cost of a contract exceeds its estimated total revenue. Future revisions to these estimated losses will be recorded in the period in which the revisions are made. Similarly, recoveries related to unresolved contract modifications and claims, if any, will be recorded in future periods.

36
 
 
 
 



Table of Contents

Gross Profit
The following table presents gross profit by business segment for the respective periods:
Years Ended December 31,
 
2013
 
2012
 
2011
(dollars in thousands)
 
 
 
 
 
 
Construction
 
$
106,374

 
$
77,963

 
$
124,506

Percent of segment revenue
 
8.5
%
 
7.9
%
 
11.9
%
Large Project Construction
 
71,808

 
148,418

 
104,108

Percent of segment revenue
 
9.2

 
17.2

 
14.4

Construction Materials
 
6,953

 
7,572

 
16,641

Percent of segment revenue
 
2.9

 
3.3

 
7.5

Real Estate
 
128

 
806

 
2,708

Percent of segment revenue
 
90.8

 
15.9

 
13.3

Total gross profit
 
$
185,263

 
$
234,759

 
$
247,963

Percent of total revenue
 
8.2
%
 
11.3
%
 
12.3
%
For the majority of our contracts, revenue in an amount equal to cost incurred is recognized prior to contracts reaching at least 25% completion, thus deferring the related profit. In the case of large, complex projects, we may defer profit recognition beyond the point of 25% completion until such time as we believe we have enough information to make a reasonably dependable estimate of contract cost. In the case of construction management, time and materials and cost-plus arrangements, we are generally able to estimate profit as services are performed based on contractual rates and estimable volumes. Therefore, we recognize profit for these types of contracts on an input basis, as services are performed. Gross profit can vary significantly in periods where one or more projects reach our percentage of completion threshold and the deferred profit is recognized or, conversely, in periods where contract backlog is growing rapidly and a higher percentage of projects are in their early stages with no associated gross profit recognition.
The following table presents revenue from projects that have not yet reached our profit recognition threshold:
Years Ended December 31,
 
2013
 
2012
 
2011
(in thousands)
 
 
 
 
 
 
Construction
 
$
16,761

 
$
22,110

 
$
10,363

Large Project Construction
 
145,038

 
16,982

 
38,542

Total revenue from contracts with deferred profit
 
$
161,799

 
$
39,092

 
$
48,905


37
 
 
 
 



Table of Contents

We do not recognize revenue from affirmative contract claims until we have a signed agreement and payment is assured, nor do we recognize revenue from contract change orders until the owner has agreed to the change order in writing. However, we do recognize the costs related to any contract claims or pending change orders when such costs are incurred, and we revise estimated total costs as soon as the obligation to perform is determined. As a result, our gross profit as a percentage of revenue can vary depending on the magnitude and timing of the settlement of claims and change orders.
When we experience significant changes in our estimates of costs to complete, we undergo a process that includes reviewing the nature of the changes to ensure that there are no material amounts that should have been recorded in a prior period rather than as revisions in estimates for the current period. In our review of these changes for the years ended December 31, 2013, 2012 and 2011, we did not identify any material amounts that should have been recorded in a prior period.
Unresolved contract modifications and claims to recover additional compensation for unanticipated additional costs that the Company believes it is entitled to under the terms of the projects’ contracts are pending or have been submitted on certain projects. The projects’ owners or their authorized representatives may be in partial or full agreement with the request or proposed modification, or may have rejected or disagree entirely as to such entitlement. The potential amount of total recoveries for contract modifications and claims for which (1) the Company believes the likelihood of recovery is probable or reasonably possible; (2) the amount of potential recovery on such contract modifications and claims can be reasonably estimated; and (3) the amount of the contract modification or claim individually exceeds $0.5 million, is between $85.0 million and $120.0 million as of December 31, 2013. These amounts are estimated recoveries and do not include costs that may be incurred to pursue and obtain such potential recoveries. Also, the Company may have to pay portions of any such recoveries to subcontractors or suppliers whose additional costs are included in the contract modifications or claims. These estimates are forward-looking statements that reflect the best judgment of management and reflect current expectations regarding future events. However, the actual amounts that will be recovered and the timing of any such recoveries cannot be guaranteed, and this total amount of estimated recoveries may not be realized.
Construction gross profit in 2013 increased $28.4 million compared to 2012. Construction gross margin as a percentage of segment revenue for 2013 increased to 8.5% from 7.9% in 2012. The increase was due to improved project execution, increase in project volumes and the addition of gross profit from Kenny operations. Gross profit and gross margin from Kenny operations in 2013 was $25.4 million and 12.7%, respectively.
Large Project Construction gross profit in 2013 decreased $76.6 million compared to 2012. Large Project Construction gross margin as a percentage of segment revenue for 2013 decreased to 9.2% from 17.2% in 2012. The decreases were due to several projects that have completed or are nearing completion as well as projects which have not yet reached the profit recognition threshold, primarily in the Heavy Civil operating group. The decreases during 2013 were also attributable to a net increase of $25.5 million from revisions in estimates in 2013, down from a net increase of $64.6 million in 2012 (see Note 2 of “Notes to the Consolidated Financial Statements”).
Construction Materials gross profit in 2013 decreased $0.6 million compared to 2012. Construction Materials gross margin as a percentage of segment revenue for 2013 decreased to 2.9% from 3.3% in 2012. The decreases were primarily due to the continued competitive environment in the commercial and public markets in general.
Real Estate gross profit decreased $0.7 million during 2013 compared to 2012 as we continue to reduce the number of real estate assets in keeping with our EIP.

38
 
 
 
 



Table of Contents

Selling, General and Administrative Expenses
The following table presents the components of selling, general and administrative expenses for the respective periods:
Years Ended December 31,
 
2013
 
2012
 
2011
(dollars in thousands)
 
 
 
 
 
 
Selling
 
 

 
 

 
 

Salaries and related expenses
 
$
38,410

 
$
35,051

 
$
33,342

Other selling expenses
 
6,901

 
13,321

 
9,066

Total selling
 
45,311

 
48,372

 
42,408

General and administrative
 
 

 
 

 
 

Salaries and related expenses
 
65,482

 
57,583

 
51,041

Restricted stock amortization
 
14,770

 
10,909

 
11,447

Incentive compensation
 
9,376

 
11,543

 
12,478

Other general and administrative expenses
 
65,007

 
56,692

 
44,928

Total general and administrative
 
154,635

 
136,727

 
119,894

Total selling, general and administrative
 
$
199,946

 
$
185,099

 
$
162,302

Percent of revenue
 
8.8
%
 
8.9
%
 
8.1
%
Selling, general and administrative expenses for 2013 increased $14.8 million, or 8.0%, compared to 2012.
Selling Expenses
Selling expenses include the costs for materials facility permits, business development, estimating and bidding. Selling expenses can vary depending on the volume of projects in process and the number of employees assigned to estimating and bidding activities. As projects are completed or the volume of work slows down, we temporarily redeploy project employees to bid on new projects, moving their salaries and related costs from cost of revenue to selling expenses. Selling expenses for 2013 decreased $3.1 million, or 6.3%, compared to 2012. The decrease was primarily due to lower pre-bid costs within the Heavy Civil operating group partially offset by additional salary and related expenses associated with Kenny of $4.2 million.
General and Administrative Expenses
General and administrative expenses include costs related to our operational offices that are not allocated to direct contract costs and expenses related to our corporate functions. These costs include variable cash and restricted stock performance-based incentives for select management personnel on which our compensation strategy heavily relies. The cash portion of these incentives is expensed when earned while the restricted stock portion is expensed as earned over the vesting period of the restricted stock award (generally three years). Other general and administrative expenses include travel and entertainment, outside services, information technology, depreciation, occupancy, training, office supplies, changes in the fair market value of our Non-Qualified Deferred Compensation plan liability and other miscellaneous expenses none of which individually exceeded 10% of total general and administrative expenses.
Total general and administrative expenses for 2013 increased $17.9 million, or 13.1%, compared to 2012. The increase during 2013 was primarily due to the addition of expenses associated with Kenny of $23.1 million. This includes $9.7 million of salaries and related expenses, $3.7 million of restricted stock amortization and incentive compensation, $6.6 million of other general and administrative expenses and $3.1 million in integration costs. These increases were partially offset by a decrease in salaries and related expenses as part of our ongoing efforts to reduce our cost structure, as well as a decrease in incentive compensation expense due to our net loss during 2013.

39
 
 
 
 



Table of Contents

Restructuring and Impairment Charges (Gains), Net
The following table presents the components of restructuring and impairment charges, net during the respective periods (in thousands):
Years ended December 31,
2013
2012
2011
Impairment losses (gains) associated with our real estate investments, net
$
31,090

$
(3,093
)
$
1,452

Severance costs


471

Impairment charges on assets
14,651


226

Lease termination costs (gains), net of estimated sublease income
3,234

(635
)
32

Total restructuring charges (gains)
48,975

(3,728
)
2,181

Other impairment charges
3,164



Total restructuring and impairment charges (gains), net
$
52,139

$
(3,728
)
$
2,181

In October 2010, we announced our EIP, which included actions to reduce our cost structure, enhance operating efficiencies and strengthen our business to achieve long-term profitable growth. The majority of restructuring charges associated with the EIP was recorded in 2010 and amounted to $109.3 million, including amounts attributable to non-controlling interests of $20.0 million. Of the $109.3 million, $86.3 million and $10.3 million was related to our Real Estate and Construction Materials segments, respectively. In 2011, development activities were curtailed for the majority of our real estate development projects as divestiture efforts increased and we recorded $1.5 million associated with the sale or other disposition of three separate projects located in California related to our Real Estate segment. During 2012, we recorded a restructuring gain of $3.1 million associated with the sale or other disposition of one project in California, one project in Oregon, and one project in Washington.
During the fourth quarter of 2013, management approved a plan to sell or otherwise dispose of all of the remaining consolidated real estate investments in our Real Estate segment, as well as certain assets in our Construction Materials segment. These actions were taken pursuant to the EIP, and resulted in restructuring charges of $49.0 million in the fourth quarter of 2013, including amounts attributable to non-controlling interests of $3.9 million. These restructuring charges consisted of the non-cash impairment of certain assets and the accrual of lease termination costs. The carrying values of the impaired assets were adjusted to their expected fair values, which were estimated by a variety of factors including, but not limited to, comparative market data, historical sales prices, broker quotes and third-party valuations.
The restructuring charges associated with the Company’s Real Estate segment resulted in $31.1 million of non-cash impairment charges related to all of the remaining consolidated real estate assets, including amounts attributable to non-controlling interests of $3.9 million. The impaired assets consist primarily of our consolidated residential and retail development projects which had a carrying value of $44.6 million prior to the impairment.
The restructuring charges associated with the Company’s Construction Materials segment resulted in $14.7 million of non-cash impairment charges related to non-performing quarry sites which had an aggregate carrying value of $17.1 million prior to the impairment. Separate from these quarry sites, but in connection with the impairment of these assets, we recorded lease termination charges of $3.2 million.
We concluded the majority of our 2010 EIP during 2013. As the impaired assets are sold, we may recognize additional restructuring charges or gains; however, we do not expect these charges or gains to be material.
Separate from the EIP but related to our process of continually optimizing our assets, we identified a quarry asset within our Construction Materials segment that no longer had strategic value to our vertically integrated business. Therefore, during the fourth quarter of 2013, management approved a plan to sell or otherwise dispose of this asset. We determined that the asset’s carrying value was not recoverable and recorded a $3.2 million non-cash impairment charge.
Gain on Sales of Property and Equipment
The following table presents the gain on sales of property and equipment for the respective periods:
Years Ended December 31,
 
2013
 
2012
 
2011
(in thousands)
 
 
 
 
 
 
Gain on sales of property and equipment
 
12,130

 
27,447

 
15,789

Gain on sales of property and equipment for 2013 decreased $15.3 million, or 55.8%, compared to 2012, primarily due to an $18.0 million gain from the sale of an underutilized quarry asset during 2012 with no corresponding sale in 2013.
 

40
 
 
 
 



Table of Contents

Other (Expense) Income
The following table presents the components of other (expense) income for the respective periods:
Years Ended December 31,
 
2013
 
2012
 
2011
(in thousands)
 
 
 
 
 
 
Interest income
 
$
1,785

 
$
2,626

 
$
2,878

Interest expense
 
(14,386
)
 
(10,603
)
 
(10,362
)
Equity in income of affiliates
 
1,304

 
1,988

 
2,193

Other income (expense), net
 
1,960

 
6,183

 
(4,545
)
Total other (expense) income 
 
$
(9,337
)
 
$
194

 
$
(9,836
)
Interest expense during 2013 increased $3.8 million compared to 2012 primarily due to increased borrowings under Granite’s existing revolving credit facility related to the acquisition of Kenny in 2012. Other income, net in 2012 included a $7.4 million gain from the sale of gold, a by-product of aggregate production, partially offset by a $2.8 million non-cash impairment charge from the write-off of our cost method investment in the preferred stock of a corporation that designs and manufactures solar power generation equipment.
Income Taxes
The following table presents the (benefit from) provision for income taxes for the respective periods:
Years Ended December 31,
 
2013

2012

2011
(dollars in thousands)
 
 
 
 
 
 
(Benefit from) provision for income taxes
 
$
(19,263
)
 
$
21,109

 
$
23,348

Effective tax rate
 
30.1
%
 
26.1
%
 
26.1
%
Our effective tax rate increased to 30.1% in 2013 from 26.1% in 2012. The most significant change was due to the effect of non-controlling interests as a percentage of net (loss) income, as non-controlling interests are not subject to income taxes on a standalone basis. Additionally, included in the tax rate for the year ended December 31, 2012, is the release of a state valuation allowance. Our tax rate is affected by discrete items that may occur in any given year, but are not consistent from year to year.
Amount Attributable to Non-controlling Interests
The following table presents the amount attributable to non-controlling interests in consolidated subsidiaries for the respective periods:
Years Ended December 31,
 
2013
 
2012
 
2011
(in thousands)
 
 
 
 
 
 
Amount attributable to non-controlling interests
 
$
8,343

 
$
(14,637
)
 
$
(14,924
)
The amount attributable to non-controlling interests represents the non-controlling owners’ share of the income or loss of our consolidated construction joint ventures and real estate entities. The change in non-controlling interests during 2013 was primarily due to a consolidated construction joint venture project nearing completion thereby realizing less income when compared to 2012. Additionally, the change was from losses incurred due to a project write down from revisions in profitability estimates on a highway project in Washington State and from the 2013 Real Estate segment restructuring charges.

41
 
 
 
 



Table of Contents

Prior Years
Revenue: Construction revenue for the year ended December 31, 2012 decreased by $59.5 million, or 5.7%, compared to the year ended December 31, 2011. The decrease was primarily due to less public sector revenue related to entering the year with lower backlog in the Northwest and East, as well as a decline in bid success in our California operating group. The decreases in public sector revenue were partially offset by increases in private sector revenue in the Northwest associated with work in the power and industrial markets.
Large Project Construction revenue for the year ended December 31, 2012 increased by $138.2 million, or 19.1%, compared to the year ended December 31, 2011. The increase was primarily due to progress on jobs in California and the Northwest that were awarded in late 2010 and early 2011 as well as progress on several other projects in the Northwest.
Construction Materials revenue for the year ended December 31, 2012 increased $10.1 million, or 4.6%, when compared to the year ended December 31, 2011. The construction materials business continued to be impacted by the weakness in the commercial and residential development markets.
Real Estate revenue for the year ended December 31, 2012 decreased by $15.2 million, or 75.0%, compared to the year ended December 31, 2011. The decrease was primarily attributable to the sale of commercial properties in California during 2011. Factors that contribute to fluctuations in revenue include national and local market conditions, entitlement status of properties and buyers access to capital. Additionally, as we execute on our EIP, we have less real estate for sale.
Contract Backlog: Construction contract backlog of $632.4 million at December 31, 2012 was $118.8 million, or 23.1%, higher than at December 31, 2011. The increase was primarily due to the acquisition of Kenny contract backlog, as well as an increase in California private sector backlog due to improved success rate on private sector bidding activity and diversification into the power market. The increases were offset by decreases in the California public sector due to progress on existing projects and lower success rate with continued intense competition.
Large Project Construction contract backlog of $1.1 billion at December 31, 2012 was $432.5 million, or 28.7%, lower than at December 31, 2011. The decrease primarily reflects work completed during the period, partially offset by new awards and the acquisition of Kenny contract backlog.
Gross Profit: Construction gross profit in 2012 decreased to $78.0 million, or 7.9% of segment revenue, from $124.5 million, or 11.9% of segment revenue, in 2011. The decreases were due to increased competition and challenging market conditions, primarily in California. In addition, the decreases during 2012 included a net decrease of $18.1 million from revisions in estimates compared to a net increase of $6.2 million for 2011, due to lower productivity that originally anticipated.
Large Project Construction gross profit in 2012 increased $44.3 million compared to 2011. Large Project Construction gross profit as a percent of segment revenue for 2012 increased to 17.2% from 14.4% in 2011. The increase was primarily due to a net increase of $64.6 million from revisions in estimates in 2012 due to lower than anticipated construction costs and owner directed scope changes compared to a net increase of $8.9 million in 2011.
Construction Materials gross profit in 2012 decreased $9.1 million compared to 2011. Construction Materials gross profit as a percent of segment revenue for 2012 decreased to 3.3% from 7.5% in 2011. The decreases were primarily due to poor economic conditions at certain California locations.
Real Estate gross profit decreased $1.9 million during 2012 compared to 2011. The decrease was primarily due to the execution of our EIP which reduced our real estate available for sale.

42
 
 
 
 



Table of Contents

Selling, General and Administrative Expenses: Selling, general and administrative expenses increased by $22.8 million, or 14.0%, to $185.1 million in 2012 from $162.3 million in 2011. Total selling expenses for 2012 increased $6.0 million, or 14.1%, compared to 2011, primarily related to increased costs associated with large projects pursuits. Total general and administrative expenses for 2012 increased $16.8 million, or 14.0%, compared to 2011 primarily due to an increase of $11.8 million or 26.2% in other general and administrative expenses. The increase in other general and administrative expenses during the year ended December 31, 2012 was primarily due to Kenny acquisition-related costs of $4.4 million and an increase of $2.0 million in the fair market value of our NQDC plan liability.
Restructuring and Impairment Charges (Gains), Net: During 2012, we recorded a net restructuring gain of $3.7 million and in 2011, we recorded net restructuring charges of $2.2 million. The restructuring gains and charges recorded in 2012 and 2011 were the result of executing our EIP.
Gain on Sales of Property and Equipment: Gain on sales of property and equipment for 2012 increased $11.7 million, or 73.8%, compared to 2011, primarily due to an $18.0 million gain from the sale of an underutilized quarry asset in the fourth quarter of 2012. This sale was related to our process of continually optimizing our assets separate from the EIP.
Other Income (Expense): Other income (expense), net in 2012 included a $7.4 million gain from the sale of gold, a by-product of aggregate production, partially offset by a $2.8 million non-cash impairment charge from the write-off of our cost method investment in the preferred stock of a corporation that designs and manufactures power generation equipment. Other (expense) income, net in 2011 consisted primarily of $3.7 million in non-cash impairment charges associated with the same cost method investment.
Provision for Income Taxes: Our effective tax rate was essentially flat in 2012 from 2011 at 26.1%. The tax rate for the year ended December 31, 2012 included a $5.8 million release of a state valuation allowance. The tax rate for the year ended December 31, 2011 included the recognition and measurement of previously unrecognized tax benefits. The recognition and measurement of these tax benefits were the result of a favorable settlement of an income tax examination conducted by the Internal Revenue Service.
Amount Attributable to Non-controlling Interests: The balance for 2012 was essentially flat compared to 2011 due to similar levels of activity on consolidated joint venture projects.

43
 
 
 
 



Table of Contents

Liquidity and Capital Resources
We believe our cash and cash equivalents, short-term investments and cash expected to be generated from operations will be sufficient to meet our expected working capital needs, capital expenditures, financial commitments, cash dividend payments, and other liquidity requirements associated with our existing operations through the next twelve months. We maintain a collateralized revolving credit facility of $215.0 million, of which $134.9 million was available at December 31, 2013, primarily to provide capital needs to fund growth opportunities, either internal or generated through acquisitions (see “Credit Agreement” discussion below for further information). We do not anticipate that this credit facility will be required to fund future working capital needs associated with our existing operations. If we experience a prolonged change in our business operating results or make a significant acquisition, we may need to acquire additional sources of financing, which, if available, may be limited by the terms of our existing debt covenants, or may require the amendment of our existing debt agreements. There can be no assurance that sufficient capital will continue to be available in the future or that it will be available on terms acceptable to us.
The following table presents our cash, cash equivalents and marketable securities, including amounts from our consolidated joint ventures, as of the respective dates:
December 31,
 
2013
 
2012
(in thousands)
 
 
 
 
Cash and cash equivalents excluding consolidated joint ventures
 
$
190,321

 
$
216,125

Consolidated construction joint venture cash and cash equivalents1
 
38,800

 
105,865

Total consolidated cash and cash equivalents
 
229,121

 
321,990

Short-term and long-term marketable securities2
 
117,202

 
111,430

Total cash, cash equivalents and marketable securities
 
$
346,323

 
$
433,420

 
1The volume and stage of completion of contracts from our consolidated construction joint ventures may cause fluctuations in joint venture cash and cash equivalents between periods. These funds generally are not available for the working capital or other liquidity needs of Granite until distributed.
2See Note 3 of “Notes to the Consolidated Financial Statements” for the composition of our marketable securities.
Our primary sources of liquidity are cash and cash equivalents and marketable securities. We may also from time to time issue and sell equity, debt or hybrid securities or engage in other capital markets transactions.
Our cash and cash equivalents consisted of commercial paper, deposits and money market funds held with established national financial institutions. Marketable securities consist of U.S. Government and agency obligations and commercial paper. Cash and cash equivalents held by our consolidated joint ventures are primarily used to fulfill the working capital needs of each joint venture’s project. The decision to distribute joint venture cash must generally be made jointly by all of the partners and, accordingly, these funds generally are not available for the working capital or other liquidity needs of Granite until distributed. Consolidated joint ventures contributed 72.2% or $67.1 million of the $92.9 million decrease in cash and cash equivalents during 2013.
Our principal uses of liquidity are paying the costs and expenses associated with our operations, servicing outstanding indebtedness, making capital expenditures and paying dividends on our capital stock. We may also from time to time prepay or repurchase outstanding indebtedness and acquire assets or businesses that are complementary to our operations, such as with the acquisition of Kenny in December 2012.

44
 
 
 
 



Table of Contents

Cash Flows
Years Ended December 31,
 
2013
 
2012
 
2011
(in thousands)
 
 
 
 
 
 
Net cash provided by (used in):
 
 
 
 
 
 
Operating activities
 
$
5,380

 
$
91,790

 
$
92,345

Investing activities
 
(31,648
)
 
(42,554
)
 
(27,728
)
Financing activities
 
(66,601
)
 
15,764

 
(59,649
)
Cash flows from operating activities result primarily from our earnings or losses, and are also impacted by changes in operating assets and liabilities which consist primarily of working capital balances. As a large heavy civil contractor and construction materials producer, our operating cash flows are subject to the cycles associated with winning, performing and closing projects, including the timing related to funding construction joint ventures and the resolution of uncertainties inherent in the complex nature of the work that we perform.
Cash provided by operating activities of $5.4 million in 2013 represents an $86.4 million decrease from the amount of cash provided by operating activities when compared to 2012. The decrease was mainly attributable to a $17.9 million decrease in net distributions from unconsolidated joint ventures, a $45.9 million decrease in cash from working capital and a $22.6 million decrease in net income after adjusting for non-cash items. Decreases in working capital were primarily attributable to a $45.9 million increase in the net use of cash related to accounts payable and accrued expenses and other current liabilities, primarily due to payments made in the normal course of business associated with contracts in our Large Project Construction segment.
Cash used in investing activities of $31.6 million for 2013 represents a $10.9 million decrease compared to the same period in 2012. The decrease was primarily due to the payments made to acquire Kenny in 2012. This was partially offset by a decrease in net proceeds and maturities of marketable securities during 2013 when compared to 2012. These changes were a result of our cash management activities that are generally based on the Company’s cash flow requirements and/or investments maturities. The decrease was also offset by a decrease in net additions to and proceeds from property and equipment. There were no unusual investing activities related to our cash management practices during the year ended December 31, 2013.
Cash used in financing activities of $66.6 million for 2013 represents an $82.4 million change from the amount of cash provided by financing activities in 2012. The change was due to a decrease in proceeds from long-term debt of $70.5 million related to the Kenny acquisition in 2012. Additionally, there was a $13.5 million increase in net distributions to non-controlling partners primarily related to two projects nearing completion in our Large Project Construction segment.
Capital Expenditures
During the year ended December 31, 2013, we had capital expenditures of $43.7 million compared to $37.6 million in 2012. Major capital expenditures are typically for aggregate and asphalt production facilities, aggregate reserves, construction equipment, buildings and leasehold improvements and investments in our information technology systems. The timing and amount of such expenditures can vary based on the progress of planned capital projects, the type and size of construction projects, changes in business outlook and other factors. We currently anticipate investing between $40.0 million and $60.0 million in capital expenditures during 2014.

45
 
 
 
 



Table of Contents

Debt and Contractual Obligations 
The following table summarizes our significant obligations outstanding as of December 31, 2013:
 
Payments Due by Period
(in thousands)
Total
Less than 1 year
1-3 years
3-5 years
More than 5 years
Long-term debt - principal
$
278,115

$
1,247

$
156,787

$
80,052

$
40,029

Long-term debt - interest1
57,252

14,167

28,410

12,229

2,446

Operating leases2
38,269

8,231

12,759

7,130

10,149

Other purchase obligations3
10,002

9,973

29



Deferred compensation obligations4
23,630

4,521

5,187

3,682

10,240

Asset retirement obligations5
29,138

9,817

2,473

1,037

15,811

Total
$
436,406

$
47,956

$
205,645

$
104,130

$
78,675

 

1 Included in the total is $0.9 million related to mortgages, the terms of which include a 4.50% variable interest rate at December 31, 2013. Also included in this balance is $7.5 million interest related to borrowing under our Credit Agreement, the terms of which include a variable interest rate that was 2.75% at December 31, 2013 using LIBOR. In addition, included in the total is $48.9 million in interest related to borrowings under our senior notes, respectively, the terms of which include a 6.11% per annum interest rate. The future payments were calculated using rates in effect as of December 31, 2013 and may differ from actual results. See Note 12 of “Notes to the Consolidated Financial Statements.”
2 These obligations represent the minimum rental commitments and minimum royalty requirements under all noncancellable operating leases. See Note 18 of “Notes to the Consolidated Financial Statements.”
These obligations represent firm purchase commitments for equipment and other goods and services not connected with our construction contract backlog which are individually greater than $10,000 and have an expected fulfillment date after December 31, 2013.
The timing of expected payment of deferred compensation is based on estimated dates of retirement. Actual dates of retirement could be different and could cause the timing of payments to change.
5Asset retirement obligations represent reclamation and other related costs associated with our owned and leased quarry properties, the majority of which have an estimated settlement date beyond five years (see Note 8 of “Notes to the Consolidated Financial Statements”).
 
In addition to the significant obligations described above, as of December 31, 2013, we had approximately $3.2 million associated with uncertain tax positions filed on our tax returns which were excluded because we cannot make a reasonably reliable estimate of the timing of potential payments relative to such reserves.



46
 
 
 
 



Table of Contents

Credit Agreement
We have a $215.0 million committed revolving credit facility, with a sublimit for letters of credit of $100.0 million (the “Credit Agreement”), which expires on October 11, 2016, of which $134.9 million was available at December 31, 2013. At December 31, 2013 and 2012, there was a revolving loan of $70.0 million outstanding under the Credit Agreement related to financing the Kenny acquisition, the balance of which is included in long-term debt on our consolidated balance sheets. In addition, as of December 31, 2013, there were standby letters of credit totaling $10.1 million. The letters of credit will expire between August 2014 and October 2014.
Borrowings under the Credit Agreement bear interest at LIBOR or a base rate (at our option), plus an applicable margin based on certain financial ratios calculated quarterly. LIBOR varies based on the applicable loan term, market conditions and other external factors. The applicable margin was 2.50% for loans bearing interest based on LIBOR and 1.50% for loans bearing interest at the base rate at December 31, 2013. Accordingly, the effective interest rate was between 2.75% and 4.75% at December 31, 2013. Borrowings at the base rate have no designated term and may be repaid without penalty any time prior to the Credit Agreement’s maturity date. Borrowings at a LIBOR rate have a term no less than one month and no greater than one year. Typically, at the end of such term, such borrowings may be paid off or rolled over at our discretion into either a borrowing at the base rate or a borrowing at a LIBOR rate with similar terms, not to exceed the maturity date of the Credit Agreement. On a periodic basis, we assess the timing of payment depending on facts and circumstances that exist at the time of our assessment. Our obligations under the Credit Agreement are guaranteed by certain of our subsidiaries and are collateralized on an equivalent basis with the obligations under the 2019 Notes (defined below) by first priority liens (subject only to other liens permitted under the Credit Agreement) on substantially all of the assets of the Company and our subsidiaries that are guarantors or borrowers under the Credit Agreement.