Granite Construction Incorporated
(Exact name of registrant as specified in its charter)
Delaware
77-0239383
(State or other jurisdiction of incorporation or organization)
(I.R.S. Employer Identification Number)
 
 
585 West Beach Street
 
Watsonville, California
95076
(Address of principal executive offices)
(Zip Code)
 
Registrant’s telephone number, including area code: (831) 724-1011
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Name of each exchange on which registered
Common Stock, $0.01 par value
New York Stock Exchange
 
Securities registered pursuant to Section 12(g) of the Act: None
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes x No o
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes o No x
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes x No o
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes x No o
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§ 229.405 of this chapter) is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. o
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. Large accelerated filer x Accelerated filer o   Non-accelerated filer o   Smaller reporting company o
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act). Yes o No x 
The aggregate market value of voting and non-voting common equity held by non-affiliates of the registrant was approximately $908.0 million as of June 30, 2012, based upon the price at which the registrant’s Common Stock was last sold as reported on the New York Stock Exchange on such date.
At February 8, 201338,731,910 shares of Common Stock, par value $0.01, of the registrant were outstanding. 
DOCUMENTS INCORPORATED BY REFERENCE
Certain information called for by Part III is incorporated by reference to the definitive Proxy Statement for the Annual Meeting of Shareholders of Granite Construction Incorporated to be held on June 6, 2013, which will be filed with the Securities and Exchange Commission not later than 120 days after December 31, 2012.
 



Index
 PART I

PART II

PART III
 

PART IV
 
 
 
 
 
 
 
 
 
EXHIBIT 101.INS 
 
EXHIBIT 101.SCH 
 
EXHIBIT 101.CAL 
 
EXHIBIT 101.DEF 
 
EXHIBIT 101.LAB 
 
EXHIBIT 101.PRE

1
 

 
 



Table of Contents

DISCLOSURE REGARDING FORWARD-LOOKING STATEMENTS
 
From time to time, Granite makes certain comments and disclosures in reports and statements, including in this Annual Report on Form 10-K, or statements made by its officers or directors, that are not based on historical facts, including statements regarding future events, occurrences, circumstances, activities, performance, outcomes and results that may constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements are identified by words such as “future,” “outlook,” “assumes,” “believes,” “expects,” “estimates,” “anticipates,” “intends,” “plans,” “appears,” “may,” “will,” “should,” “could,” “would,” “continue,” and the negatives thereof or other comparable terminology or by the context in which they are made. In addition, other written or oral statements which constitute forward-looking statements have been made and may in the future be made by or on behalf of Granite. These forward-looking statements are estimates reflecting the best judgment of senior management and reflect our current expectations regarding future events, occurrences, circumstances, activities, performance, outcomes and results. These expectations may or may not be realized. Some of these expectations may be based on beliefs, assumptions or estimates that may prove to be incorrect. In addition, our business and operations involve numerous risks and uncertainties, many of which are beyond our control, which could result in our expectations not being realized or otherwise materially affect our business, financial condition, results of operations, cash flows and liquidity. Such risks and uncertainties include, but are not limited to, those more specifically described in this report under “Item 1A. Risk Factors.” Due to the inherent risks and uncertainties associated with our forward-looking statements, the reader is cautioned not to place undue reliance on them. The reader is also cautioned that the forward-looking statements contained herein speak only as of the date of this Annual Report on Form 10-K, and, except as required by law, we undertake no obligation to revise or update any forward-looking statements for any reason.

PART I
Item 1. BUSINESS 

Introduction
Granite Construction Company was originally incorporated in 1922. In 1990, Granite Construction Incorporated was formed as the holding company for Granite Construction Company and its wholly owned subsidiaries and was incorporated in Delaware. Unless otherwise indicated, the terms “we,”  “us,”  “our,”  “Company” and “Granite” refer to Granite Construction Incorporated and its consolidated subsidiaries.
We are one of the largest diversified heavy civil contractors and construction materials producers in the United States. We operate nationwide, serving both public and private sector clients. Within the public sector, we primarily concentrate on heavy-civil infrastructure projects, including the construction of roads, highways, mass transit facilities, airport infrastructure, bridges, dams and other infrastructure related projects. Within the private sector, we perform site preparation and infrastructure services for residential development, commercial and industrial buildings, and other facilities.
We own and lease substantial aggregate reserves and own a number of construction materials processing plants. We also have one of the largest contractor-owned heavy construction equipment fleets in the United States. We believe that the ownership of these assets enables us to compete more effectively by ensuring availability of these resources at a favorable cost.
In December 2012, we purchased 100% of the outstanding stock of Kenny Construction Company (“Kenny”), a Northbrook, Illinois-based national contractor and construction manager, for a purchase price of $141.5 million, subject to possible post-closing adjustments. Kenny is recognized as a national leader among tunneling and electrical power contractors, and has evolved into an industry-leading rehabilitation contractor utilizing cutting-edge trenchless and underground construction technologies and processes. This acquisition expands our presence in the power, tunnel and underground markets, and enables us to leverage our capabilities and geographic footprint. See Note 21 of the “Notes to the Consolidated Financial Statements” for further information.


2
 

 
 



Table of Contents

Operating Structure
Our business has been organized into four reportable business segments to reflect our lines of business. These business segments are: Construction, Large Project Construction, Construction Materials and Real Estate. See Note 20 of “Notes to the Consolidated Financial Statements” for additional information about our reportable business segments.
Our market sector information reflects four groups defined as follows: 1) California; 2) Northwest, which primarily includes our offices in Alaska, Nevada, Utah and Washington; 3) East, which primarily includes our offices in Arizona, Florida, New York and Texas; and 4) Kenny, which primarily includes our offices in Colorado, Illinois, and Pennsylvania.  Each of these groups includes operations from our Construction and Large Project Construction lines of business. Our California, Northwest and East groups include operations from our Construction Materials line of business. A project’s results are reported in the group that is responsible for the project, not necessarily the geographic area where the work is located. In some cases, the operations of a group include the results of work performed outside of that region.
Construction: Revenue from our Construction segment remained relatively unchanged at approximately $1.0 billion (approximately 47.0% of our total revenue) in 2012 and 2011. Revenue from our Construction segment is derived from both public and private sector clients. The Construction segment performs various heavy civil construction projects with a large portion of the work focused on new construction and improvement of streets, roads, highways, bridges, site work and other infrastructure projects. These are typically bid-build projects completed within two years with a contract value of less than $75 million.
Large Project Construction: Revenue from our Large Project Construction segment was $863.2 million and $725.0 million (41.4% and 36.1% of our total revenue) in 2012 and 2011, respectively. The Large Project Construction segment focuses on large, complex infrastructure projects which typically have a longer duration than our Construction segment work. These projects include major highways, mass transit facilities, bridges, tunnels, waterway locks and dams, pipelines, canals and airport infrastructure. This segment primarily includes bid-build, design-build and construction management/general contractor contracts, generally with contract values in excess of $75 million.
We participate in joint ventures with other construction companies mainly on projects in our Large Project Construction segment. Joint ventures are typically used for large, technically complex projects, including design/build projects, where it is desirable to share risk and resources. Joint venture partners typically provide independently prepared estimates, shared financing and equipment and often bring local knowledge and expertise (see “Joint Ventures; Off-Balance-Sheet Arrangements” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations”).
We also utilize the design/build and construction management/general contract methods of project delivery. Unlike traditional projects where owners first hire a design firm or design a project themselves and then put the project out to bid for construction, design/build projects provide the owner with a single point of responsibility and a single contact for both final design and construction. Although design/build projects carry additional risk as compared to traditional bid/build projects, the profit potential can also be higher. Under the construction management/general contract method of delivery, we contract with owners to manage the design phase of the contract with the understanding that we will negotiate a contract on the construction phase when the design nears completion. Revenue from design/build and construction management/general contract projects represented 74.5% and 58.1% of Large Project Construction revenue in 2012 and 2011, respectively.
Construction Materials: Revenue from our Construction Materials segment was $230.6 million and $220.6 million (11.1% and 11.0% of our total revenue) in 2012 and 2011, respectively. The Construction Materials segment mines and processes aggregates and operates plants that produce construction materials for internal use and for sale to third parties. We have significant aggregate reserves that we have acquired by ownership in fee or through long-term leases. Aggregate products used in our construction projects represented approximately 42.7% of our tons sold during 2012 and ranged from 42.2% to 50.2% over the last five years. The remainder is sold to third parties.
Real Estate: Granite Land Company (“GLC”) is an investor in a diversified portfolio of land assets and provides real estate services for other Granite operations. GLC’s current investment portfolio consists of residential as well as retail and office site development projects for sale to home and commercial property developers. The range of its involvement in an individual project may vary from passive investment to management of land use rights, development, construction, leasing and eventual sale of the project. Generally, GLC has teamed with partners who have local knowledge and expertise in the development of each property.

3
 

 
 



Table of Contents

GLC’s current investments are located in Washington, California and Texas. Revenue from GLC was $5.1 million and $20.3 million (0.2% and 1.0% of our total revenue) in 2012 and 2011, respectively. In October 2010, we announced our Enterprise Improvement Plan that includes plans to orderly divest of our real estate investment business. See Note 11 of “Notes to the Consolidated Financial Statements” and “Restructuring Charges” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” for additional information.
Business Strategy
Our fundamental objective is to increase long-term shareholder value as measured by the appreciation of the value of our common stock over a period of time as well as dividend yields. A specific measure of our financial success is the achievement of a return on net assets greater than the cost of capital, creating “Granite Value Added.” The following are key factors in our ability to achieve these objectives:
Aggregate Materials - We own and lease aggregate reserves and own processing plants that are vertically integrated into our construction operations. By ensuring availability of these resources and providing quality products, we believe we have a competitive advantage in many of our markets as well as a source of revenue and earnings from the sale of construction materials to third parties.
Controlled Growth - We intend to grow our business by working on many types of infrastructure projects as well as by expanding into new geographic areas organically and through acquisitions. In addition, we focus our efforts on larger projects wherein our financial strength and project experience provide us with a competitive advantage. 
Decentralized Profit Centers - Each of our operating groups is established as an individual profit center which encourages entrepreneurial activity while allowing the groups to benefit from centralized administrative and support functions.
Diversification - To mitigate the risks inherent in the construction business as the result of general economic factors, we pursue projects: (i) in both the public and private sectors, (ii) in federal, rail, power and renewable energy markets, (iii) for a wide range of customers within each sector (from the federal government to small municipalities and from large corporations to individual homeowners), (iv) in diverse geographic markets, (v) that are construction management/general contractor, design/build, fixed price and fixed unit price and (vi) of various sizes, durations and complexity. In addition to pursuing opportunities with traditional project funding, we continue to evaluate other sources of project funding (e.g., public private partnerships).
Employee Development - We believe that our employees are key to the successful implementation of our business strategies. Significant resources are employed to attract, develop and retain extraordinary talent and fully promote each employee’s capabilities.
Infrastructure Construction Focus - We concentrate our core competencies on this segment of the construction industry, which includes the building of roads, highways, bridges, dams, tunnels, mass transit facilities, airport and railroad infrastructure, underground utilities and site preparation. This focus allows us to most effectively utilize our specialized strengths, which include grading, paving and construction of concrete structures.
Ownership of Construction Equipment - We own a large fleet of well maintained heavy construction equipment. The ownership of construction equipment enables us to compete more effectively by ensuring availability of the equipment at a favorable cost.
Profit-based Incentives - Profit center managers are incentivized with cash compensation and restricted equity awards, payable upon the attainment of pre-established annual financial and non-financial metrics.
Selective Bidding - We focus our resources on bidding jobs that meet our selective bidding criteria, which include analyzing the risk of a potential job relative to: (i) available personnel to estimate and prepare the proposal, (ii) available personnel to effectively manage and build the project, (iii) the competitive environment, (iv) our experience with the type of work, (v) our experience with the owner, (vi) local resources and partnerships, (vii) equipment resources, (viii) the size and complexity of the job and (ix) profitability.
Our operating principles include:
Accident Prevention - We believe accident prevention is a moral obligation as well as good business. By identifying and concentrating resources to address jobsite hazards, we continually strive to reduce our incident rates and the costs associated with accidents.
Quality and High Ethical Standards - We believe in the importance of performing high quality work. Additionally, we believe in maintaining high ethical standards through an established code of conduct and an effective corporate compliance program.
Sustainability - Our focus on sustainability encompasses many aspects of how we conduct ourselves and practice our core values. We believe sustainability is important to our customers, employees, shareholders, and communities, and is also a long-term business driver. By focusing on specific initiatives that address social, environmental and economic challenges, we can minimize risk and increase our competitive advantage.

4
 

 
 



Table of Contents

Raw Materials
We purchase raw materials consisting of aggregate products, cement, diesel fuel, liquid asphalt, natural gas, propane and steel from numerous sources. Our aggregate reserves supply a portion of the raw materials needed in our construction projects. The price and availability of raw materials may vary from year to year due to market conditions and production capacities. We do not foresee the lack of availability of any raw materials in the near term.
Seasonality
Our operations are typically affected by weather conditions during the first and fourth quarters of our fiscal year which may alter our construction schedules and can create variability in our revenues, profitability and the required number of employees.
Customers
Customers in our Construction segment include certain federal agencies, state departments of transportation, county and city public works departments, school districts and developers and owners of industrial, commercial and residential sites. Customers of our Large Project Construction segment are predominantly in the public sector and currently include various state departments of transportation, local transit authorities and federal agencies. Customers of our Construction Materials segment include internal usage on our own construction, as well as third party customers including, but not limited to, contractors, landscapers, manufacturers of products requiring aggregate materials, retailers, homeowners, farmers and brokers.
During the years ended December 31, 2012 and 2011, our largest volume customer was the California Department of Transportation (“Caltrans”). Revenue recognized from contracts with Caltrans represented 13.1% of our total revenue, 27.3% of our Construction revenue and 0.5% of our Large Project Construction revenue in 2012 and 13.2% of our total revenue, 23.1% of our Construction revenue and 3.3% of our Large Project Construction revenue in 2011.  During the year ended 2010, our largest volume customer was Maryland State Highway Administration (“MD SHA”). Revenue recognized from contracts with MD SHA represented 10.3% of our total revenue and 31.0% of our Large Project Construction revenue in 2010. Public sector revenue in California represented 26.4%, 27.0% and 23.2% of our total revenue in 20122011 and 2010, respectively.
Contract Backlog
Our contract backlog is comprised of the unearned portion of revenue on awarded contracts that have not been completed, including 100% of the unearned revenue of our consolidated joint ventures and our proportionate share of unconsolidated joint venture contracts. We generally include a project in our contract backlog at the time a contract is awarded and funding is in place. Certain federal government contracts where funding is appropriated on a periodic basis are included in contract backlog at the time of the award. Substantially all of the contracts in our contract backlog may be canceled or modified at the election of the customer; however, we have not been materially adversely affected by contract cancellations or modifications in the past (see “Contract Provisions and Subcontracting”). Many projects in our Construction segment are added and completed within a year and therefore may not be reflected in our beginning or year-end contract backlog. Contract backlog by segment is presented in “Contract Backlog” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.” Our contract backlog was approximately $1.7 billion and $2.0 billion at December 31, 2012 and 2011, respectively. Approximately $1.4 billion of the December 31, 2012 contract backlog is expected to be completed during 2013

5
 

 
 



Table of Contents

Equipment
At December 31, 2012 and 2011, we owned the following number of construction equipment and vehicles:
December 31,
2012
2011
Heavy construction equipment
2,566

2,006

Trucks, truck-tractors, trailers and vehicles
3,579

4,206

 
Our portfolio of equipment includes backhoes, barges, bulldozers, cranes, excavators, loaders, motor graders, pavers, rollers, scrapers, trucks and tunnel boring machines that are used in our Construction, Large Project Construction and Construction Materials business segments. We believe that ownership of equipment is generally preferable to leasing because it ensures the equipment is available as needed and normally results in lower costs. We pool certain equipment for use by our Construction, Large Project Construction and Construction Materials segments to maximize utilization. We continually monitor and adjust our fleet size so that it is consistent with the size of our business, considering both existing backlog and expected future work. On a short-term basis, we lease or rent equipment to supplement existing equipment in response to construction activity peaks. In 2012 and 2011, we spent approximately $19.8 million and $22.3 million, respectively, on purchases of construction equipment and vehicles.
Employees
On December 31, 2012, we employed approximately 1,700 salaried employees who work in management, estimating and clerical capacities, plus approximately 2,400 hourly employees. The total number of hourly personnel is subject to the volume of construction in progress and is seasonal. During 2012, the number of hourly employees ranged from approximately 1,500 to 3,900 and averaged approximately 3,100. Three of our wholly owned subsidiaries, Granite Construction Company, Granite Construction Northeast, Inc., and Kenny Construction Company, are parties to craft collective bargaining agreements in many areas in which they work.
We believe our employees are our most valuable resource and that our workforce possesses a strong dedication to and pride in our company. Among salaried and non-union hourly employees, this dedication is reinforced by an 8.6% equity ownership at December 31, 2012 through our Employee Stock Purchase Plan, Profit Sharing and 401(k) Plan and performance-based incentive compensation arrangements. Our managerial and supervisory personnel have an average of approximately eleven years of service with us.
Competition
Competitors of our Construction segment typically come from small local construction companies as well as large regional, national and international construction companies. We compete with numerous companies in individual markets, however, there are few companies which compete in all of our market areas. Many of our Construction segment competitors have the ability to perform work in either the private or public sectors. When opportunities for work in one sector are reduced, competitors tend to look for opportunities in the other sector. This migration has the potential to reduce revenue growth and/or increase pressure on gross profit margins.
The scale and complexity of jobs in the Large Project Construction segment preclude many smaller contractors from bidding such work. Consequently, our Large Project Construction segment competition typically comes from large regional, national and global construction companies.
We own and/or have long-term leases on aggregate resources that we believe may provide a competitive advantage in certain markets for both the Construction and Large Project Construction segments.
Competitors of our Construction Materials segment range from small local materials companies to large regional, national and global materials companies. We compete with numerous companies in individual markets; however, there are few companies which compete in all of our market areas. The unprecedented demand for construction materials during 2001 through 2006 prompted many materials suppliers to increase production and sales capacities in many of the markets in which we compete. The subsequent reduction in demand, primarily driven by a reduction in residential and commercial development, has increased the level of competition to sell construction materials.
Factors influencing our competitiveness include price, estimating abilities, knowledge of local markets and conditions, project management, financial strength, reputation for quality, the availability of aggregate materials, and machinery and equipment. Historically, the construction business has not required large amounts of capital, particularly for the smaller size construction work pursued by our Construction segment, which can result in relative ease of market entry for companies possessing acceptable qualifications. Although the construction business is highly competitive, we believe we are well positioned to compete effectively in the markets in which we operate.

6
 

 
 



Table of Contents

Contract Provisions and Subcontracting
Our contracts with our customers are primarily “fixed unit price” or “fixed price.” Under fixed unit price contracts, we are committed to providing materials or services at fixed unit prices (for example, dollars per cubic yard of concrete placed or cubic yard of earth excavated). While the fixed unit price contract shifts the risk of estimating the quantity of units required for a particular project to the customer, any increase in our unit cost over the expected unit cost in the bid, whether due to inflation, inefficiency, errors in our estimates or other factors, is borne by us unless otherwise provided in the contract. Fixed price contracts are priced on a lump-sum basis under which we bear the risk of performing all the work for the specified amount. The percentage of fixed price contracts (excluding fixed unit price contracts) in our contract backlog decreased to approximately 56.8% at December 31, 2012 compared with approximately 69.5% at December 31, 2011.
Our construction contracts are obtained through competitive bidding in response to solicitations by both public agencies and private parties and on a negotiated basis as a result of solicitations from private parties. Project owners use a variety of methods to make contractors aware of new projects, including posting bidding opportunities on agency websites, disclosing long-term infrastructure plans, advertising and other general solicitations. Our bidding activity is affected by such factors as the nature and volume of advertising and other solicitations, contract backlog, available personnel, current utilization of equipment and other resources, our ability to obtain necessary surety bonds and competitive considerations. Our contract review process includes identifying risks and opportunities during the bidding process and managing these risks through mitigation efforts such as contract negotiation, insurance and pricing. Contracts fitting certain criteria of size and complexity are reviewed by various levels of management and, in some cases, by the Executive Committee of our Board of Directors. Bidding activity, contract backlog and revenue resulting from the award of new contracts may vary significantly from period to period.
There are a number of factors that can create variability in contract performance and results as compared to a project’s original bid. The most significant of these include the completeness and accuracy of the original bid, cost associated with scope changes where final price negotiations are not complete, extended overhead due to owner, weather and other delays, subcontractor performance issues, changes in productivity expectations, site conditions that differ from those assumed in the original bid (to the extent contract remedies are unavailable), the availability and skill level of workers in the geographic location of the project and a change in the availability and proximity of equipment or materials. All of these factors can impose inefficiencies on contract performance, which can increase costs and lower profits. Conversely, positive variations in any of these or other factors can decrease costs and improve profitability. However, the ability to realize improvements on project profitability is often more limited than the risk of lower profitability. Design/build projects typically incur additional costs such as right-of-way and permit acquisition costs and carry additional risks such as design error risk and the risk associated with estimating quantities and prices before the project design is completed. These unknown factors may cause higher than anticipated construction costs and additional liability to the contract owner. We manage this additional risk by adding contingencies to our bid amounts, obtaining errors and omissions insurance and obtaining indemnifications from our design consultants where possible. However, there is no guarantee that these risk management strategies will always be successful.
Most of our contracts, including those with the government, provide for termination at the convenience of the contract owner, with provisions to pay us for work performed through the date of termination. We have not been materially adversely affected by these provisions in the past. Many of our contracts contain provisions that require us to pay liquidated damages if specified completion schedule requirements are not met and these amounts could be significant.
We act as prime contractor on most of our construction projects. We complete the majority of our projects with our own resources and subcontract specialized activities such as electrical and mechanical work. As prime contractor, we are responsible for the performance of the entire contract, including subcontract work. Thus, we may be subject to increased costs associated with the failure of one or more subcontractors to perform as anticipated. Based on our analysis of their construction and financial capabilities, among other criteria, we determine whether to require the subcontractor to furnish a bond or other type of security to guarantee their performance. Disadvantaged business enterprise regulations require us to use our best efforts to subcontract a specified portion of contract work done for governmental agencies to certain types of disadvantaged contractors or suppliers. As with all of our subcontractors, some may not be able to obtain surety bonds or other types of performance security.



7
 

 
 



Table of Contents

Insurance and Bonding
We maintain general and excess liability, construction equipment and workers’ compensation insurance; all in amounts consistent with industry practice.
In connection with our business, we generally are required to provide various types of surety bonds that provide an additional measure of security for our performance under certain public and private sector contracts. Our ability to obtain surety bonds depends upon our capitalization, working capital, past performance, management expertise and external factors, including the capacity of the overall surety market. Surety companies consider such factors in light of the amount of our contract backlog that we have currently bonded and their current underwriting standards, which may change from time to time. The capacity of the surety market is subject to market-based fluctuations driven primarily by the level of surety industry losses and the degree of surety market consolidation. When the surety market capacity shrinks it results in higher premiums and increased difficulty obtaining bonding, in particular for larger, more complex projects throughout the market. In order to help mitigate this risk, we employ a co-surety structure involving three sureties. Although we do not believe that fluctuations in surety market capacity have significantly affected our ability to grow our business, there is no assurance that it will not significantly affect our ability to obtain new contracts in the future (see “Item 1A. Risk Factors”).
Environmental Regulations
Our operations are subject to various federal, state and local laws and regulations relating to the environment, including those relating to discharges to air, water and land, the handling and disposal of solid and hazardous waste, the handling of underground storage tanks and the cleanup of properties affected by hazardous substances. Certain environmental laws impose substantial penalties for non-compliance and others, such as the federal Comprehensive Environmental Response, Compensation and Liability Act, impose strict, retroactive, joint and several liability upon persons responsible for releases of hazardous substances. We continually evaluate whether we must take additional steps at our locations to ensure compliance with environmental laws. While compliance with applicable regulatory requirements has not materially adversely affected our operations in the past, there can be no assurance that these requirements will not change and that compliance will not adversely affect our operations in the future. In addition, our aggregate materials operations require operating permits granted by governmental agencies. We believe that tighter regulations for the protection of the environment and other factors will make it increasingly difficult to obtain new permits and renewal of existing permits may be subject to more restrictive conditions than currently exist.
In July 2007, the California Air Resources Board (“CARB”) approved a regulation that will require California equipment owners/operators to reduce diesel particulate and nitrogen oxide emissions from in-use off-road diesel equipment and to meet progressively more restrictive emission targets from 2010 to 2020. In December 2008, CARB approved a similar regulation for in-use on-road diesel equipment that includes more restrictive emission targets from 2010 to 2022. The emission targets will require California off-road and on-road diesel equipment owners to retrofit equipment with diesel emission control devices or replace equipment with new engine technology as it becomes available, which will result in higher equipment related expenses. In December 2010, CARB amended both regulations to grant economic relief to affected fleets by extending initial compliance dates from 2020 to 2025 as well as adding additional compliance requirements. To date, costs to prepare the Company for compliance have been minimal. At this time we do not expect the full cost of compliance to be significant and we will continue to manage compliance costs; however, it is not possible to determine the future cost of compliance.
As is the case with other companies in our industry, some of our aggregate products contain varying amounts of crystalline silica, a common mineral. Also, some of our construction and material processing operations release, as dust, crystalline silica that is in the materials being handled. Excessive, prolonged inhalation of very small-sized particles of crystalline silica has allegedly been associated with respiratory disease (including silicosis). The Mine Safety and Health Administration and the Occupational Safety and Health Administration have established occupational thresholds for crystalline silica exposure as respirable dust. We have implemented dust control procedures to measure compliance with requisite thresholds and to verify that respiratory protective equipment is made available as necessary. We also communicate, through safety information sheets and other means, what we believe to be appropriate warnings and cautions to employees and customers about the risks associated with excessive, prolonged inhalation of mineral dust in general and crystalline silica in particular.
Website Access
Our website address is www.graniteconstruction.com. On our website we make available, free of charge, our Annual Report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and all amendments to those reports as soon as reasonably practicable after such material is electronically filed with or furnished to the Securities and Exchange Commission (“SEC”). The information on our website is not incorporated into, and is not part of, this report. These reports, and any amendments to them, are also available at the website of the SEC, www.sec.gov.

8
 

 
 



Table of Contents

Executive Officers of the Registrant
Our current executive officers are as follows:
Name
Age
Position
James H. Roberts
56
President and Chief Executive Officer
Laurel J. Krzeminski
58
Senior Vice President and Chief Financial Officer
Thomas S. Case
50
Senior Vice President and Operations Services Manager
Michael F. Donnino
58
Senior Vice President and Group Manager
John A. Franich 
56
Senior Vice President and Group Manager
James D. Richards
49
Senior Vice President and Group Manager
Patrick B. Kenny
62
Senior Vice President and Group Manager
 
Granite Construction Incorporated was incorporated in Delaware in January 1990 as the holding company for Granite Construction Company, which was incorporated in California in 1922. All dates of service for our executive officers include the periods in which they served for Granite Construction Company.
Mr. Roberts joined Granite in 1981 and has served in various capacities, including President and Chief Executive Officer since September 2010. He also served as Executive Vice President and Chief Operating Officer from September 2009 to August 2010, Senior Vice President from May 2004 to September 2009, Granite West Manager from February 2007 to September 2009, Branch Division Manager from May 2004 to February 2007, Vice President and Assistant Branch Division Manager from 1999 to 2004, and Regional Manager of Nevada and Utah Operations from 1995 to 1999. Mr. Roberts served as Chairman of The National Asphalt Pavement Association in 2006. He received a B.S.C.E. in 1979 and an M.S.C.E. in 1980 from the University of California, Berkeley, and an M.B.A. from the University of Southern California in 1981. He also completed the Stanford Executive Program in 2009.
Ms. Krzeminski joined Granite in 2008 and has served as Chief Financial Officer since November 2010 and Senior Vice President since January 2013. She also served as Vice President from July 2008 to December 2012, Interim Chief Financial Officer from June 2010 to October 2010 and Corporate Controller from July 2008 to May 2010. From 1993 to 2007, she served in various corporate and operational finance positions with The Gillette Company (acquired by The Procter & Gamble Company in 2005), including Finance Director for the Duracell and Braun North American business units. Ms. Krzeminski also served as the Director of Gillette’s Sarbanes-Oxley Section 404 Compliance program and as Gillette’s Director of Corporate Financial Reporting. Her experience also includes several years in public accounting with an international accounting firm. She received a B.S. degree in Business Administration - Accounting from San Diego State University in 1978.

9
 

 
 



Table of Contents

Mr. Case joined Granite in 1987 and has served as Senior Vice President and Operations Services Manager since January 2013. He also served as Vice President and Group Manager from January 2010 to December 2012, Southwest Operating Group Manager from November 2007 to December 2009, Utah Operations Branch Manager from August 2001 through November 2007, Utah Operations Construction Manager during 2001, Utah Operations Materials Manager between 1996 and 2000, and in various positions at Granite’s Nevada and Santa Barbara, California operations between 1987 and 1996. Mr. Case received a B.S. in Construction Management from California Polytechnic State University in 1986.
Mr. Donnino joined Granite in 1977 and has served as Senior Vice President and Group Manager since January 2010, Senior Vice President since January 2005, Manager of Granite East from February 2007 to December 2009, and Heavy Construction Division Manager from January 2005 to February 2007. He served as Vice President and Heavy Construction Division Assistant Manager during 2004, Texas Regional Manager from 2000 to 2003 and Dallas Estimating Office Area Manager from 1991 to 2000. Mr. Donnino received a B.S.C.E. in Structural, Water and Soils Engineering from the University of Minnesota in 1976.
Mr. Franich joined Granite in 2005 and has served as Senior Vice President and Group Manager since January 2013, Vice President and Group Manager from January 2010 to December 2012, Vice President and Granite West Manager of Construction from February 2007 to December 2009, and Vice President, Branch Division Construction Manager from January 2005 through January 2007. Prior to joining Granite in 2005, Mr. Franich has held various positions in the construction industry since 1979 and was formerly the President of Associated General Contractors of California. Mr. Franich received a B.S. in Business Administration - Finance from California State University, Chico in 1979.
Mr. Richards joined Granite in January 1992 and has served as Senior Vice President and Group Manager since January 2013. He also served as Arizona Region Manager from February 2006 through December 2012, Arizona Region Chief Estimator from January 2000 through January 2006 and in other positions at Granite’s Arizona Branch between 1992 and 2000. Prior to joining Granite, he served as a U.S. Army Officer. Mr. Richards received a B.S. in Civil Engineering from New Mexico State University in 1987.
Mr. Kenny has served as Senior Vice President and Group Manager since January 2013. Mr. Kenny previously served as Executive Vice President of Kenny Construction Company which was acquired by Granite. He was responsible for the Tunnel and Power Groups from 2005 to 2012, and he managed the Tunnel and Underground Groups from 1990 to 2005. Prior to such time, Mr. Kenny was Vice President of Engineering for Kenny Construction Company. Mr. Kenny received a B.S in Civil Engineering from Lehigh University in 1972 and an M.B.A. from Lehigh in 1973.




10
 

 
 



Table of Contents

Item 1A. RISK FACTORS
Set forth below and elsewhere in this report and in other documents we file with the SEC are various risks and uncertainties that could cause our actual results to differ materially from the results contemplated by the forward-looking statements contained in this report or otherwise adversely affect our business.
Unfavorable economic conditions have had and are expected to continue to have an adverse impact on our business. The recent turmoil in the global financial system has had and may continue to have an adverse impact on our business, financial position, results of operations, cash flows and liquidity. In particular, low tax revenues, budget deficits, financing constraints and competing priorities have resulted in, and may continue to result in, cutbacks in new infrastructure projects in the public sector and could have an adverse impact on collectibility of receivables from government agencies. In addition, levels of new commercial and residential construction projects have been adversely affected by oversupply of existing inventories of commercial and residential properties, low property values and a restrictive financing environment. The depressed demand for construction and construction materials in both the public and private sectors has resulted in intensified competition, which has had an adverse impact on both our revenues and profit margins and could impact growth opportunities. Although conditions are stabilizing, these factors have also had an adverse impact on the levels of activity and financial position, results of operations, cash flows and liquidity of our real estate investment and development business.
Deterioration of the United States economy could have a material adverse effect on our business, financial condition and results of operations. Congress’ inability to lower United States debt substantially could result in a decrease in government spending, which could negatively impact the ability of government agencies to fund existing or new infrastructure projects. In addition, such actions could have a material adverse effect on the financial markets and economic conditions in the United States as well as throughout the world, which may limit our ability and the ability of our customers to obtain financing and/or could impair our ability to execute our acquisition strategy. Deterioration in general economic activity and infrastructure spending or Congress’ deficit reduction measures could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
As a part of our growth strategy we have made and may make future acquisitions, and acquisitions involve many risks. These risks include difficulties integrating the operations and personnel of the acquired companies, diversion of management’s attention from ongoing operations, potential difficulties and increased costs associated with completion of any assumed construction projects, insufficient revenues to offset increased expenses associated with acquisitions and the potential loss of key employees or customers of the acquired companies. Acquisitions may also cause us to increase our liabilities, record goodwill or other non-amortizable intangible assets that will be subject to subsequent impairment testing and potential impairment charges, as well as amortization expenses related to certain other intangible assets. Failure to manage and successfully integrate acquisitions could harm our financial position, results of operations, cash flows and liquidity.
Our strategic diversification plan, as well as, the acquisition of Kenny Construction Company includes growing our international operations in Canada and U.S. Territories, which are subject to a number of special risks. As part of our strategic diversification efforts we plan on entering into more construction contracts in Canada or U.S. Territories, which may subject us to a number of special risks, including risks associated with:
lesser developed legal systems in which to enforce contractual rights;
greater risk of uncollectible accounts and longer collection cycles;
foreign currency exchange volatility;
uncertain and changing tax rules, regulations and rates;
logistical and communication challenges;
potentially adverse changes in laws and regulatory practices;
changes in labor conditions;
general economic, political and financial conditions in foreign markets; and
exposure to civil or criminal liability under the Foreign Corrupt Practices Act, the Canadian Corruption of Foreign Public Officials Act, anti-boycott rules, trade and export control regulations, and the Corporate Manslaughter and Corporate Homicide Act, as well as other international regulations.

Due to the special risks associated with non-U.S. operations, our exposure to such risks may not be proportionate to the percentage of our revenues attributable to such operations.


11
 

 
 



Table of Contents

Changes to our outsourced software vendors as well as any sudden loss, breach of security, disruption or unexpected data or vendor loss associated with our information technology systems could have a material adverse effect on our business. We rely on third-party software to run critical accounting, project management and financial information systems.  If software vendors decide to discontinue further development, integration or long-term software maintenance support for our information systems, or there is any system interruption, delay, breach of security, loss of data or loss of a vendor, we may need to migrate some or all of our accounting, project management and financial information to other systems. Despite business continuity plans, these disruptions could increase our operational expense as well as impact the management of our business operations, which could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
An inability to safeguard our information technology environment could result in business interruptions, remediation costs and/or legal claims. To protect confidential customer, vendor, financial and employee information, we employ information security measures that secure our information systems from cybersecurity attacks or breaches. Even with these measures, we may be subject to unauthorized access of digital data with the intent to misappropriate information, corrupt data or cause operational disruptions. If a failure of our safeguarding measures were to occur, it could have a negative impact to our business and result in business interruptions, remediation costs and/or legal claims, which could have a material adverse effect on our financial position, results of operations, cash flow and liquidity.
We work in a highly competitive marketplace. We have multiple competitors in all of the areas in which we work, and some of our competitors are larger than we are and may have greater resources than we do. During economic down cycles or times of lower government funding for public works projects, competition for the fewer available public projects typically intensifies and this increased competition may result in a decrease in new awards at acceptable profit margins. In addition, downturns in residential and commercial construction activity increases the competition for available public sector work, further impacting our revenue, contract backlog and profit margins.
Our success depends on attracting and retaining qualified personnel, joint venture partners and subcontractors in a competitive environment. The success of our business is dependent on our ability to attract, develop and retain qualified personnel, joint venture partners, advisors and subcontractors. Changes in general or local economic conditions and the resulting impact on the labor market and on our joint venture partners may make it difficult to attract or retain qualified individuals in the geographic areas where we perform our work. If we are unable to provide competitive compensation packages, high-quality training programs, attractive work environments or to establish and maintain successful partnerships, our ability to profitably execute our work could be adversely impacted.
Strikes or work stoppages could have a negative impact on our operations and results. We are party to collective bargaining agreements covering a portion of our craft workforce. Although strikes or work stoppages have not had a significant impact on our operations or results in the past, such labor actions could have a significant impact on our operations and results if they occur in the future.
Failure to maintain safe work sites could result in significant losses. Construction and maintenance sites are potentially dangerous workplaces and often put our employees and others in close proximity with mechanized equipment, moving vehicles, chemical and manufacturing processes, and highly regulated materials.  On many sites, we are responsible for safety and, accordingly, must implement safety procedures.  If we fail to implement these procedures or if the procedures we implement are ineffective, we may suffer the loss of or injury to our employees, as well as expose ourselves to possible litigation.  Despite having invested significant resources in safety programs and being recognized as an industry leader, a serious accident may nonetheless occur on one of our worksites. As a result, our failure to maintain adequate safety standards could result in reduced profitability or the loss of projects or clients, and could have a material adverse impact on our financial position, results of operations, cash flows and liquidity.
Government contracts generally have strict regulatory requirements. Approximately 80.6% of our consolidated revenue in 2012 was derived from contracts funded by federal, state and local government agencies and authorities. Government contracts are subject to specific procurement regulations, contract provisions and a variety of socioeconomic requirements relating to their formation, administration, performance and accounting and often include express or implied certifications of compliance. Claims for civil or criminal fraud may be brought for violations of regulations, requirements or statutes. We may also be subject to qui tam (“Whistle Blower”) litigation brought by private individuals on behalf of the government under the Federal Civil False Claims Act, which could include claims for up to treble damages. Further, if we fail to comply with any of the regulations, requirements or statutes or if we have a substantial number of accumulated Occupational Safety and Health Administration, Mine Safety and Health Administration or other workplace safety violations, our existing government contracts could be terminated and we could be suspended from government contracting or subcontracting, including federally funded projects at the state level. Should one or more of these events occur, it could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.

12
 

 
 



Table of Contents

Government contractors are subject to suspension or debarment from government contracting. Our substantial dependence on government contracts exposes us to a variety of risks that differ from those associated with private sector contracts. Various statutes to which our operations are subject, including the Davis-Bacon Act (which regulates wages and benefits), the Walsh-Healy Act (which prescribes a minimum wage and regulates overtime and working conditions), Executive Order 11246 (which establishes equal employment opportunity and affirmative action requirements) and the Drug-Free Workplace Act, provide for mandatory suspension and/or debarment of contractors in certain circumstances involving statutory violations. In addition, the Federal Acquisition Regulation and various state statutes provide for discretionary suspension and/or debarment in certain circumstances that might call into question a contractor’s willingness or ability to act responsibly, including as a result of being convicted of, or being found civilly liable for, fraud or a criminal offense in connection with obtaining, attempting to obtain or performing a public contract or subcontract. The scope and duration of any suspension or debarment may vary depending upon the facts and the statutory or regulatory grounds for debarment and could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
We may be unable to identify qualified Disadvantaged Business Enterprise (“DBE”) contractors to perform as subcontractors. Certain of our government agency projects contain minimum DBE participation clauses. If we subsequently fail to complete these projects with the minimum DBE participation, we may be held responsible for breach of contract damages which may include restrictions on our ability to bid on future projects as well as monetary damages. To the extent we are responsible for monetary damages, the total costs of the project could exceed our original estimates, we could experience reduced profits or a loss for that project and there could be a material adverse impact to our financial position, results of operations, cash flows and liquidity.
Fixed price and fixed unit price contracts subject us to the risk of increased project cost. As more fully described in “Contract Provisions and Subcontracting” under “Item 1. Business,” the profitability of our fixed price and fixed unit price contracts can be adversely affected by a number of factors that can cause our actual costs to materially exceed the costs estimated at the time of our original bid.
Design/build contracts subject us to the risk of design errors and omissions. Design/build is increasingly being used as a method of project delivery as it provides the owner with a single point of responsibility for both design and construction. We generally subcontract design responsibility to architectural and engineering firms. However, in the event of a design error or omission causing damages, there is risk that the subcontractor or their errors and omissions insurance would not be able to absorb the liability. In this case we may be responsible, resulting in a potentially material adverse effect on our financial position, results of operations, cash flows and liquidity.
Many of our contracts have penalties for late completion. In some instances, including many of our fixed price contracts, we guarantee that we will complete a project by a certain date. If we subsequently fail to complete the project as scheduled we may be held responsible for costs resulting from the delay, generally in the form of contractually agreed-upon liquidated damages. To the extent these events occur, the total cost of the project could exceed our original estimate and we could experience reduced profits or a loss on that project.
Accounting for our revenues and costs involves significant estimates. As further described in “Critical Accounting Policies and Estimates” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations,” accounting for our contract related revenues and costs, as well as other expenses, requires management to make a variety of significant estimates and assumptions. Although we believe we have sufficient experience and processes to enable us to formulate appropriate assumptions and produce reasonably dependable estimates, these assumptions and estimates may change significantly in the future and could result in the reversal of previously recognized revenue and profit. Such changes could have a material adverse effect on our financial position and results of operations.
Failure of our subcontractors to perform as anticipated could have a negative impact on our results. As further described in “Contract Provisions and Subcontracting” under “Item 1. Business,” we subcontract portions of many of our contracts to specialty subcontractors, but we are ultimately responsible for the successful completion of their work. Although we seek to require bonding or other forms of guarantees, we are not always successful in obtaining those bonds or guarantees from our higher risk subcontractors. In this case we may be responsible for the failures on the part of our subcontractors to perform as anticipated, resulting in a potentially adverse impact on our cash flows and liquidity. In addition, the total costs of a project could exceed our original estimates and we could experience reduced profits or a loss for that project, which could have an adverse impact on our financial position, results of operations, cash flows and liquidity.

13
 

 
 



Table of Contents

We use certain commodity products that are subject to significant price fluctuations. Diesel fuel, liquid asphalt and other petroleum-based products are used to fuel and lubricate our equipment and fire our asphalt concrete processing plants.  In addition, they constitute a significant part of the asphalt paving materials that are used in many of our construction projects and are sold to third parties. Although we are partially protected by asphalt or fuel price escalation clauses in some of our contracts, many contracts provide no such protection. We also use steel and other commodities in our construction projects that can be subject to significant price fluctuations. We pre-purchase commodities, enter into supply agreements or enter into financial contracts to secure pricing.  We have not been significantly adversely affected by price fluctuations in the past; however, there is no guarantee that we will not be in the future.
We are subject to environmental and other regulation. As more fully described in “Environmental Regulations” under “Item 1. Business,” we are subject to a number of federal, state and local laws and regulations relating to the environment, workplace safety and a variety of socioeconomic requirements. Noncompliance with such laws and regulations can result in substantial penalties, or termination or suspension of government contracts as well as civil and criminal liability. In addition, some environmental laws and regulations impose liability and responsibility on present and former owners, operators or users of facilities and sites for contamination at such facilities and sites without regard to causation or knowledge of contamination. We occasionally evaluate various alternatives with respect to our facilities, including possible dispositions or closures. Investigations undertaken in connection with these activities may lead to discoveries of contamination that must be remediated, and closures of facilities may trigger compliance requirements that are not applicable to operating facilities. While compliance with these laws and regulations has not materially adversely affected our operations in the past, there can be no assurance that these requirements will not change and that compliance will not adversely affect our operations in the future. Furthermore, we cannot provide assurance that existing or future circumstances or developments with respect to contamination will not require us to make significant remediation or restoration expenditures.
Weather can significantly affect our quarterly revenues and profitability. Our ability to perform work is significantly affected by weather conditions such as precipitation and temperature. Changes in weather conditions can cause delays and otherwise significantly affect our project costs. The impact of weather conditions can result in variability in our quarterly revenues and profitability, particularly in the first and fourth quarters of the year.
Our joint venture contracts with project owners subject us to joint and several liability. As further described in “Joint Ventures; Off-Balance Sheet Arrangements” under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations,” we participate in various construction joint venture partnerships in connection with complex construction projects. If our joint venture partner fails to perform under one of these contracts, we could be liable for completion of the entire contract. If the contract were unprofitable, this could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
Increasing restrictions on securing aggregate reserves could negatively affect our future operations and results. Tighter regulations and the finite nature of property containing suitable aggregate reserves are making it increasingly challenging and costly to secure aggregate reserves. Although we have thus far been able to secure reserves to support our business, our financial position, results of operations, cash flows and liquidity may be adversely affected by an increasingly difficult permitting process.



14
 

 
 



Table of Contents

Granite Land Company is greatly affected by the strength of the real estate industry. Our real estate investment and development activities are subject to numerous factors beyond our control including local real estate market conditions; substantial existing and potential competition; general national, regional and local economic conditions; fluctuations in interest rates and mortgage availability and changes in demographic conditions. If our outlook for a project’s forecasted profitability deteriorates, we may find it necessary to curtail our development activities and evaluate our real estate assets for possible impairment. Our evaluation includes a variety of estimates and assumptions and future changes in these estimates and assumptions could affect future impairment analyses. If our real estate assets are determined to be impaired, the impairment would result in a write-down of the asset in the period of the impairment. See Notes 7 and 11 of “Notes to the Consolidated Financial Statements” for additional information on impairment charges.
Our decision in October 2010 to orderly divest of our real estate investment business resulted in changes to the business plans of certain of our real estate affiliates and the recognition of impairment charges primarily in the fourth quarter of 2010, with no significant impairment charges during the years ended December 31, 2012 and 2011. The business plans of our real estate affiliates include estimates of our ability to obtain certain development rights, our ability to obtain financing, the future condition of the real estate and financial markets, and the timing of cash flows. A continued decline in the residential and/or commercial real estate markets may decrease, or lengthen, the timing of expected cash flows of certain development projects to the point that we would be required to recognize additional valuation impairments in the future.
Our real estate investments are subject to mortgage financing and may require additional funding. Granite Land Company’s real estate investments generally utilize short-term debt financing for their development activities. Such financing is subject to the terms of the applicable debt or credit agreement and generally is secured by mortgages on the applicable real property. GLC’s failure to comply with the covenants applicable to such financing or to pay principal, interest or other amounts when due thereunder would constitute an event of default under the applicable agreement and could have the effects described in the following risk factor relating to our debt and credit agreements. Due to the tightening of the credit markets, banks have required lower loan-to-value ratios often resulting in the need to pay a portion of the debt when short-term financing is renegotiated. If our real estate investment partners are unable to make their proportional share of a required repayment, GLC may elect to provide the additional funding which could materially affect our financial position, cash flows and liquidity. Also, if we determine we are the primary beneficiary, as defined by the applicable accounting guidance, we may be required to consolidate additional real estate investments in our financial statements.
Failure to remain in compliance with covenants under our debt and credit agreements, service our indebtedness, or fund our other liquidity needs could adversely impact our business. The recent recession and credit crisis and related turmoil in the global financial system has had and is expected to continue to have an adverse impact on our business, financial position, results of operations, cash flows and liquidity. Our debt and credit agreements and related restrictive covenants are more fully described in Note 12 of “Notes to the Consolidated Financial Statements.” Our failure to comply with any of these covenants, or to pay principal, interest or other amounts when due thereunder, would constitute an event of default under the applicable agreements.  Under certain circumstances, the occurrence of an event of default under one of our debt or credit agreements (or the acceleration of the maturity of the indebtedness under one of our agreements) may constitute an event of default under one or more of our other debt or credit agreements. Default under our debt and credit agreements could result in (1) us no longer being entitled to borrow under the agreements, (2) termination of the agreements, (3) the requirement that any letters of credit under the agreements be cash collateralized, (4) acceleration of the maturity of outstanding indebtedness under the agreements and/or (5) foreclosure on any collateral securing the obligations under the agreements. If we are unable to service our debt obligations or fund our other liquidity needs, we could be forced to curtail our operations, reorganize our capital structure (including through bankruptcy proceedings) or liquidate some or all of our assets in a manner that could cause holders of our securities to experience a partial or total loss of their investment in us.
Force majeure events, including natural disasters and terrorists’ actions, could negatively impact our business, which may affect our financial condition, results of operations or cash flows. Force majeure or extraordinary events beyond the control of the contracting parties, such as natural and man-made disasters, as well as terrorist actions, could negatively impact the economies in which we operate.  We typically remain obligated to perform our services after such extraordinary events unless the contract contains a force majeure clause relieving us of our contractual obligations in such an extraordinary event.  If we are not able to react quickly to force majeure events, our operations may be affected significantly, which would have a negative impact on our financial position, results of operations, cash flows and liquidity.

15
 

 
 



Table of Contents

Unavailability of insurance coverage could have a negative effect on our operations and results. We maintain insurance coverage as part of our overall risk management strategy and pursuant to requirements to maintain specific coverage that are contained in our financing agreements and in most of our construction contracts. Although we have been able to obtain reasonably priced insurance coverage to meet our requirements in the past, there is no assurance that we will be able to do so in the future, and our inability to obtain such coverage could have an adverse impact on our ability to procure new work, which could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
An inability to obtain bonding could have a negative impact on our operations and results. As more fully described in “Insurance and Bonding” under “Item 1. Business,” we generally are required to provide surety bonds securing our performance under the majority of our public and private sector contracts. Our inability to obtain reasonably priced surety bonds in the future could significantly affect our ability to be awarded new contracts, which could have a material adverse effect on our financial position, results of operations, cash flows and liquidity.
A change in tax laws or regulations of any federal, state or international jurisdiction in which we operate could increase our tax burden and otherwise adversely affect our financial position, results of operations, cash flows and liquidity. We continue to assess the impact of various U.S. federal, state and international legislative proposals that could result in a material increase to our U.S. federal, state and/or international taxes. We cannot predict whether any specific legislation will be enacted or the terms of any such legislation. However, if such proposals were to be enacted, or if modifications were to be made to certain existing regulations, the consequences could have a material adverse impact on us, including increasing our tax burden, increasing our cost of tax compliance or otherwise adversely affecting our financial position, results of operations, cash flows and liquidity.
We may be required to contribute cash to meet our unfunded pension obligations in certain multi-employer plans. Three of our wholly owned subsidiaries, Granite Construction Company, Granite Construction Northeast, Inc. and Kenny Construction Company participate in various multi-employer pension plans on behalf of union employees. Union employee benefits generally are based on a fixed amount for each year of service. We are required to make contributions to the plans in amounts established under collective bargaining agreements.  Pension expense is recognized as contributions are made. Under the Employee Retirement Income Security Act, a contributor to a multi-employer plan is liable, upon termination or withdrawal from a plan, for its proportionate share of a plan’s unfunded vested liability.  While we currently have no intention of withdrawing from a plan and unfunded pension obligations have not significantly affected our operations in the past, there can be no assurance that we will not be required to make material cash contributions to one or more of these plans to satisfy certain underfunded benefit obligations in the future.
Our contract backlog is subject to unexpected adjustments and cancellations and could be an uncertain indicator of our future earnings. We cannot guarantee that the revenues projected in our contract backlog will be realized or, if realized, will be profitable. Projects reflected in our contract backlog may be affected by project cancellations, scope adjustments, time extensions or other changes. Such changes may adversely affect the revenue and profit we ultimately realize on these projects.
The foregoing list is not all-inclusive. There can be no assurance that we have correctly identified and appropriately assessed all factors affecting our business or that the publicly available and other information with respect to these matters is complete and correct. Additional risks and uncertainties not presently known to us or that we currently believe to be immaterial may also adversely affect us. These developments could have material adverse effects on our business, financial condition, results of operations and liquidity. For these reasons, the reader is cautioned not to place undue reliance on our forward-looking statements.

16
 

 
 



Table of Contents

Item 1B. UNRESOLVED STAFF COMMENTS
None.
Item 2. PROPERTIES
Quarry Properties
As of December 31, 2012, we had 49 active and 28 inactive permitted quarry properties available for the extraction of sand and gravel and hard rock, all of which are located in the western United States. All of our quarries are open-pit and are primarily accessible by road. We process aggregates into construction materials for internal use and for sale to third parties. The following map shows the approximate locations of our permitted quarry properties as of December 31, 2012.
We estimate our permitted proven1 and probable2 aggregate reserves to be approximately 828.0 million tons with an average permitted life of approximately 85 years at present operating levels which vary from site to site. Present operating levels are determined based on a three-year annual average aggregate production rate of 11.4 million tons. Reserve estimates were made by our geologists and engineers based primarily on drilling studies. Reserve estimates are based on various assumptions, and any material inaccuracies in these assumptions could have a material impact on the accuracy of our reserve estimates. Our plant equipment is powered mostly by electricity provided by local utility companies.
1Proven reserves are determined through the testing of samples obtained from closely spaced subsurface drilling and/or exposed pit faces. Proven reserves are sufficiently understood so that quantity, quality, and engineering conditions are known with sufficient accuracy to be mined without the need for any further subsurface work. Actual required spacing is based on geologic judgment about the predictability and continuity of each deposit.
2Probable reserves are determined through the testing of samples obtained from subsurface drilling but the sample points are too widely spaced to allow detailed prediction of quantity, quality, and engineering conditions. Additional subsurface work may be needed prior to mining the reserve.





17
 

 
 



Table of Contents

The following tables present information about our quarry properties as of December 31, 2012 (tons in millions):
 
Type
 
 
 
 
Quarry Properties
Sand & Gravel
Hard Rock
Permitted Aggregate Reserves (tons)
Unpermitted Aggregate Reserves (tons)
Three-Year Annual Average Production Rate (tons)
Average Reserve Life
Owned quarry properties
30
5
493.7
347.0
6.0
102
Leased quarry properties1
26
16
334.3
86.6
5.4
59
 
1 Our leases have expiration dates which range from monthly terms to 88 years, with most including an option to renew.
 
 
Permitted Reserves
for Each Product Type (tons)
Percentage of Permitted Reserves Owned and Leased
State
Number of Properties
Sand & Gravel
Hard Rock
Owned
Leased
California
40
325.4
261.8
61
%
39
%
Non-California
37
147.4
93.4
56
%
45
%
 
Plant Properties
We operate plants at our quarry sites to process aggregates into construction materials. Some of our quarry sites may have more than one crushing, concrete or asphalt processing plant. At December 31, 2012 and 2011, we owned the following plants:
December 31,
2012
2011
Aggregate crushing plants
44

48

Asphalt concrete plants
58

62

Portland cement concrete batch plants
18

20

Asphalt rubber plants
5

5

Lime slurry plants
9

9

Other Properties 
The following table provides our estimate of certain information about other properties as of December 31, 2012:
 
Land Area (acres)
Building Square Feet
Office and shop space (owned and leased)
1,700
1,300,000
Real estate held for development and sale and use
1,400
As of December 31, 2012, approximately 61% of our office and shop space was attributable to our Construction segment, 8% to our Large Project Construction segment and 5% to our Construction Materials segment. The remainder is primarily attributable to administration.

18
 

 
 



Table of Contents

Item 3. LEGAL PROCEEDINGS 
In the ordinary course of business, we are involved in various legal proceedings that are pending against us and our affiliates alleging, among other things, breach of contract or tort in connection with the performance of professional services, the various outcomes of which cannot be predicted with certainty. The most significant of these proceedings are as follows:
US Highway 20 Project: Our wholly owned subsidiaries, Granite Construction Company (“GCCO”) and Granite Northwest, Inc., are members of a joint venture known as Yaquina River Constructors (“YRC”) which was contracted by the Oregon Department of Transportation (“ODOT”) to construct a new road alignment of US Highway 20 near Eddyville, Oregon. During the fall and winter of 2006, extraordinary rain events produced runoff that overwhelmed installed erosion control measures and resulted in discharges to surface water and alleged violations of YRC’s stormwater permit. During 2012, ODOT and YRC reached a settlement agreement that ended YRC’s responsibility to construct the project. Also during 2012, YRC, GCCO, the United States Environmental Protection Agency and the U.S. Department of Justice (“DOJ”) entered into a consent decree, which provides for a civil penalty payment after entry of the decree by the court and environmental monitoring by GCCO of certain Oregon projects. This matter has not and is not expected to have a material adverse effect on our financial position, results of operations, cash flow and/or liquidity.
Investigation Related to Grand Avenue Project Disadvantaged Business Enterprise (“DBE”) Issues: On March 6, 2009, the U.S. Department of Transportation, Office of Inspector General served upon our wholly-owned subsidiary, Granite Construction Northeast, Inc. (“Granite Northeast”), a United States District Court Eastern District of New York Grand Jury subpoena to produce documents. The subpoena sought all documents pertaining to the use of a DBE firm (the “Subcontractor”), and the Subcontractor’s use of a non-DBE lower tier subcontractor/consultant, on the Grand Avenue Bus Depot and Central Maintenance Facility for the Borough of Queens Project (the “Grand Avenue Project”), a Granite Northeast project.  The subpoena sought any documents regarding the use of the Subcontractor as a DBE on any other projects and any other documents related to the Subcontractor or to the lower-tier subcontractor/consultant. Granite Northeast produced the requested documents, together with other requested information. Subsequently, Granite Northeast was informed by the DOJ that it is a subject of the investigation, along with others. In January 2013, Granite Northeast met with Assistant United States Attorneys from the DOJ, along with other federal and state agents (the “Agencies”), to discuss the status of the government’s criminal investigation of the Grand Avenue Project participants, including Granite Northeast. In addition to the documents produced in response to the Grand Jury subpoena, Granite Northeast is in the process of providing information to the DOJ concerning other projects for which Granite Northeast has claimed DBE credit. Granite Northeast is fully cooperating with the Agencies’ investigation. We cannot, however, rule out the possibility of actions being brought against Granite Northeast which could result in civil, criminal, and/or administrative penalties or sanctions. Beyond the amount accrued for this matter, Granite is unable to estimate at this time any additional losses that may be reasonably probable. However, under certain circumstances the resolution of the matters under investigation could have direct or indirect consequences that could have a material adverse effect on our financial position, results of operations and/or liquidity.
Other Legal Proceedings/Government Inquiries: We are a party to a number of other legal proceedings arising in the normal course of business. From time to time, we also receive inquiries from public agencies seeking information concerning our compliance with government construction contracting requirements and related laws and regulations. We believe that the nature and number of these proceedings and compliance inquiries are typical for a construction firm of our size and scope. Our litigation typically involves claims regarding public liability or contract related issues. While management currently believes, after consultation with counsel, that the ultimate outcome of pending proceedings and compliance inquiries, individually and in the aggregate, will not have a material adverse affect on our financial position, results of operations or cash flows, litigation is subject to inherent uncertainties. Were one or more unfavorable rulings to occur, there exists the possibility of a material adverse effect on our financial position, results of operations, cash flows and/or liquidity for the period in which the ruling occurs. In addition, our government contracts could be terminated, we could be suspended or debarred, or payment of our costs disallowed. While any one of our pending legal proceedings is subject to early resolution as a result of our ongoing efforts to settle, whether or when any legal proceeding will be resolved through settlement is neither predictable nor guaranteed.
We record amounts in our consolidated balance sheets representing our estimated liability relating to legal proceedings and government inquiries. During the years ended December 31, 2012 and 2011, there were no significant additions or revisions to the estimated liability that were recorded in our consolidated statements of operations, or significant changes to our accrual for such litigation loss contingencies on our consolidated balance sheets.

Item 4. MINE SAFETY DISCLOSURES
The information concerning mine safety violations or other regulatory matters required by Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and Item 104 of Regulation S-K (17CFR 229.104) is included in Exhibit 95 to this Annual Report on Form 10-K.

19
 

 
 



Table of Contents

PART II
Item 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
Our common stock trades on the New York Stock Exchange under the ticker symbol GVA.
As of February 8, 2013, there were 38,731,910 shares of our common stock outstanding held by 1,347 shareholders of record.
We have paid quarterly cash dividends since the second quarter of 1990, and we expect to continue to do so. However, declaration and payment of dividends is within the sole discretion of our Board of Directors, subject to limitations imposed by Delaware law and compliance with our credit agreements (which allow us to pay dividends so long as we have at least $150 million in unencumbered cash and equivalents and marketable securities on our consolidated balance sheet), and will depend on our earnings, capital requirements, financial condition and such other factors as the Board of Directors deems relevant.
Market Price and Dividends of Common Stock
 
 
2012 Quarters Ended
December 31,
September 30,
June 30,
March 31,
High
$
34.62

$
30.88

$
29.31

$
30.49

Low
$
27.50

$
21.58

$
21.38

$
23.79

Dividends per share
$
0.13

$
0.13

$
0.13

$
0.13

2011 Quarters Ended
 December 31,
September 30,
June 30,
March 31,
High
$
26.78

$
26.08

$
28.75

$
29.68

Low
$
17.52

$
16.92

$
23.58

$
24.33

Dividends per share
$
0.13

$
0.13

$
0.13

$
0.13

During the three months ended December 31, 2012, we did not sell any of our equity securities that were not registered under the Securities Act of 1933, as amended. The following table sets forth information regarding the repurchase of shares of our common stock during the three months ended December 31, 2012:
Period
Total Number of Shares Purchased1
Average Price Paid per Share
Total Number of Shares Purchased as Part of Publicly Announced Plans or Programs
Approximate Dollar Value of Shares that May Yet be Purchased Under the Plans or Programs2
October 1 through October 31, 2012
2,063

$
29.09

$
64,065,401

November 1 through November 30, 2012
2,255

$
30.60

$
64,065,401

December 1 through December 31, 2012
2,386

$
31.27

$
64,065,401

Total
6,704

$
30.37

 
 
1The number of shares purchased is in connection with employee tax withholding for shares granted under our Amended and Restated 1999 Equity Incentive Plan.
2In October 2007, our Board of Directors authorized us to purchase, at management’s discretion, up to $200.0 million of our common stock. Under this purchase program, the Company may purchase shares from time to time on the open market or in private transactions. The specific timing and amount of purchases will vary based on market conditions, securities law limitations and other factors. Purchases under the share purchase program may be commenced, suspended or discontinued at any time and from time to time without prior notice.

20
 

 
 



Table of Contents

Performance Graph
The following graph compares the cumulative 5-year total return provided to shareholders on Granite Construction Incorporated’s common stock relative to the cumulative total returns of the S&P 500 index and the Dow Jones U.S. Heavy Construction index. The Dow Jones U.S. Heavy Construction index includes the following companies: AECOM Technology Corp., Aegion Corp, EMCOR Group Inc., Fluor Corp., Foster Wheeler AG, Granite Construction Inc., Jacobs Engineering Group Inc., KBR Inc., Quanta Services Inc. and Shaw Group Inc. Certain of these companies differ from Granite in that they derive revenue and profit from non-U.S. operations and have customers in different markets. An investment of $100 (with reinvestment of all dividends) is assumed to have been made in our common stock and in each of the indexes on December 31, 2007 and its relative performance is tracked through December 31, 2012.


December 31,
2007
2008
2009
2010
2011
2012
Granite Construction Incorporated
$
100.00

$
123.23

$
95.85

$
79.67

$
70.46

$
101.70

S&P 500
100.00

63.00

79.67

91.67

93.61

108.59

Dow Jones U.S. Heavy Construction
100.00

44.88

51.30

65.87

54.30

65.94



21
 

 
 



Table of Contents

Item 6. SELECTED FINANCIAL DATA
Other than contract backlog, the selected consolidated financial data set forth below have been derived from our consolidated financial statements. Refer to the consolidated financial statements for further reference. These historical results are not necessarily indicative of the results of operations to be expected for any future period.
Selected Consolidated Financial Data
Years Ended December 31,
2012
2011
2010
2009
2008
Operating Summary
(Dollars In Thousands, Except Per Share Data)
Revenue
$
2,083,037

$
2,009,531

$
1,762,965

$
1,963,479

$
2,674,244

Gross profit
234,759

247,963

177,784

349,509

471,949

As a percent of revenue
11.3
%
12.3
%
10.1
 %
17.8
%
17.6
%
Selling, general and administrative expenses
185,099

162,302

191,593

228,046

260,761

As a percent of revenue
8.9
%
8.1
%
10.9
 %
11.6
%
9.8
%
Restructuring (gains) charges, net1
(3,728
)
2,181

109,279

9,453


Net income (loss)
59,920

66,085

(62,448
)
100,201

165,738

Amount attributable to noncontrolling interests2
(14,637
)
(14,924
)
3,465

(26,701
)
(43,334
)
Net income (loss) attributable to Granite
45,283

51,161

(58,983
)
73,500

122,404

As a percent of revenue
2.2
%
2.5
%
(3.3
)%
3.7
%
4.6
%
Net income (loss) per share attributable to
common shareholders:
 

 

 

 

 

Basic
$
1.17

$
1.32

$
(1.56
)
$
1.91

$
3.19

Diluted
$
1.15

$
1.31

$
(1.56
)
$
1.90

$
3.18

Weighted average shares of common stock:
 

 

 

 

 

Basic
38,447

38,117

37,820

37,566

37,606

Diluted
39,076

38,473

37,820

37,683

37,709

Dividends per common share
$
0.52

$
0.52

$
0.52

$
0.52

$
0.52

Consolidated Balance Sheet3
 

 

 

 

 

Total assets
$
1,729,487

$
1,547,799

$
1,535,533

$
1,709,575

$
1,743,455

Cash, cash equivalents and marketable securities
433,420

406,648

395,728

458,341

520,402

Working capital
490,785

461,254

475,079

500,605

475,942

Current maturities of long-term debt
19,060

32,173

38,119

58,978

39,692

Long-term debt
271,070

218,413

242,351

244,688

250,687

Other long-term liabilities
47,124

49,221

47,996

48,998

43,604

Granite shareholders’ equity
829,953

799,197

761,031

830,651

767,509

Book value per share
21.43

20.66

19.64

21.50

20.06

Common shares outstanding
38,731

38,683

38,746

38,635

38,267

Contract backlog
$
1,707,315

$
2,022,454

$
1,899,170

$
1,401,988

$
1,699,396

 
1 During 2012, we recorded a net gain on restructuring of approximately $3.7 million and during 2011 and 2010, we recorded restructuring charges of approximately $2.2 million and $109.3 million, respectively, related to our Enterprise Improvement Plan. The $9.5 million in restructuring charges in 2009 related to an organizational change.
2 Effective January 1, 2009, we adopted a new accounting standard requiring net income attributable to both the parent and noncontrolling interests to be disclosed separately as well as the components of equity attributable to the parent and noncontrolling interests. Prior years have been adjusted to conform to this new standard.
3 Assets acquired and liabilities assumed resulting from the acquisition of Kenny Construction Company are included in our consolidated balance sheet as of December 31, 2012 (see Note 21 of the “Notes to the Consolidated Financial Statements”).



22
 

 
 



Table of Contents

Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
General
We are one of the largest diversified heavy civil contractors and construction materials producers in the United States, engaged in the construction and improvement of streets, roads, highways, mass transit facilities, airport infrastructure, bridges, trenchless and underground utilities, electrical utilities, tunnels, dams and other infrastructure-related projects. We own aggregate reserves and plant facilities to produce construction materials for use in our construction business and for sale to third parties. We also operate a real estate investment and development company. Our permanent offices are located in Alaska, Arizona, California, Colorado, Florida, Illinois, Nevada, New York, Pennsylvania, Texas, Utah and Washington.
Our construction contracts are obtained through competitive bidding in response to solicitations by both public agencies and private parties and on a negotiated basis as a result of solicitations from private parties. Project owners use a variety of methods to make contractors aware of new projects, including posting bidding opportunities on agency websites, disclosing long-term infrastructure plans, advertising and other general solicitations. Our bidding activity is affected by such factors as the nature and volume of advertising and other solicitations, contract backlog, available personnel, current utilization of equipment and other resources, our ability to obtain necessary surety bonds and competitive considerations. Our contract review process includes identifying risks and opportunities during the bidding process and managing these risks through mitigation efforts such as insurance and pricing. Contracts fitting certain criteria of size and complexity are reviewed by various levels of management and, in some cases, by the Executive Committee of our Board of Directors. Bidding activity, contract backlog and revenue resulting from the award of new contracts may vary significantly from period to period.
Our typical construction project begins with the preparation and submission of a bid to a customer. If selected as the successful bidder, we generally enter into a contract with the customer that provides for payment upon completion of specified work or units of work as identified in the contract. We usually invoice our customers on a monthly basis. Our contracts frequently call for retention that is a specified percentage withheld from each payment until the contract is completed and the work accepted by the customer. Additionally, we defer recognition of profit on projects until they reach at least 25% completion (see “Revenue and Earnings Recognition for Construction Contracts” under “Critical Accounting Policies and Estimates”) and our profit recognition is based on estimates that change over time. Our revenue, gross margin and cash flows can differ significantly from period to period due to a variety of factors including the projects’ stage of completion, the mix of early and late stage projects, our estimates of contract costs and the payment terms of our contracts. The timing differences between our cash inflows and outflows require us to maintain adequate levels of working capital.
The four primary economic drivers of our business are (1) the overall health of the economy, (2) federal, state and local public funding levels, (3) population growth resulting in public and private development, and (4) the need to replace or repair aging infrastructure. A stagnant or declining economy will generally result in reduced demand for construction and construction materials in the private sector. This reduced demand increases competition for private sector projects and will ultimately also increase competition in the public sector as companies migrate from bidding on scarce private sector work to projects in the public sector. Greater competition can reduce our revenues and/or have a downward impact on our gross profit margins. In addition, a stagnant or declining economy tends to produce less tax revenue for public agencies, thereby decreasing a source of funds available for spending on public infrastructure improvements. Some funding sources that have been specifically earmarked for infrastructure spending, such as diesel and gasoline taxes, are not as directly affected by a stagnant or declining economy, unless actual consumption is reduced. However, even these can be temporarily at risk as state and local governments take actions to balance their budgets. Additionally, high fuel prices can have a dampening effect on consumption, resulting in overall lower tax revenue. Conversely, increased levels of public funding as well as an expanding or robust economy will generally increase demand for our services and provide opportunities for revenue growth and margin improvement.

23
 

 
 



Table of Contents

In December 2012, we purchased 100% of the outstanding stock of Kenny Construction Company, a Northbrook, Illinois-based national contractor and construction manager, for a purchase price of $141.5 million, subject to possible post-closing adjustments. This acquisition expands our presence in the power, tunnel and underground markets, and enables us to leverage our capabilities and geographic footprint. See Note 21 of the “Notes to the Consolidated Financial Statements” for further information.

In October 2010, we announced our Enterprise Improvement Plan which includes continued actions to reduce our cost structure, enhance operating efficiencies and strengthen our business to achieve long-term profitable growth. The Enterprise Improvement Plan includes new business plans to orderly divest of our real estate investment business and certain fixed assets consistent with our business strategy to focus on our core business. As a result of the Enterprise Improvement Plan, we incurred restructuring charges related to workforce reductions as well as real estate and fixed asset impairments. The majority of restructuring charges associated with the Enterprise Improvement Plan were recorded in the fourth quarter of 2010. See Note 11 of “Notes to the Consolidated Financial Statements” and “Restructuring Charges” below for further information.

Our market sector information reflects four groups defined as follows: 1) California; 2) Northwest, which primarily includes our offices in Alaska, Nevada, Utah and Washington; 3) East, which primarily includes our offices in Arizona, Florida, New York and Texas; and 4) Kenny, which primarily includes our offices in Colorado, Illinois and Pennsylvania.  Each of these groups includes operations from our Construction and Large Project Construction lines of business. Our California, Northwest and East groups include operations from our Construction Materials line of business. A project’s results are reported in the group that is responsible for the project, not necessarily the geographic area where the work is located. In some cases, the operations of a group include the results of work performed outside of that region.

Critical Accounting Policies and Estimates
The financial statements included in “Item 8. Financial Statements and Supplementary Data” have been prepared in accordance with accounting principles generally accepted in the United States of America.  The preparation of these financial statements requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, revenue and expenses, and related disclosure of contingent assets and liabilities. Our estimates, judgments and assumptions are continually evaluated based on available information and experiences; however, actual amounts could differ from those estimates.
Certain of our accounting policies and estimates require higher degrees of judgment in their application. These include revenue and earnings recognition for construction contracts, the valuation of real estate held for development and sale and insurance estimates. The Audit/Compliance Committee of our Board of Directors has reviewed our disclosure of critical accounting estimates.  

24
 

 
 



Table of Contents

Revenue and Earnings Recognition for Construction Contracts
Revenue and earnings on construction contracts, including construction joint ventures, are recognized under the percentage of completion method using the ratio of costs incurred to estimated total costs. Revenue in an amount equal to cost incurred is recognized prior to contracts reaching at least 25% completion, thus deferring the related profit. It is our judgment that until a project reaches at least 25% completion, there is insufficient information to determine the estimated profit on the project with a reasonable level of certainty. In the case of large, complex design/build projects we may defer profit recognition beyond the point of 25% completion based on an evaluation of specific project risks. The factors considered in this evaluation include the stage of design completion, the stage of construction completion, status of outstanding purchase orders and subcontracts, certainty of quantities of labor and materials, certainty of schedule and the relationship with the owner.
Revenue from contract claims is recognized when we have a signed agreement and payment is assured. Revenue from contract change orders, which occur in most large projects, is recognized when the owner has agreed to the change order in writing. Provisions are recognized in the consolidated statements of operations for the full amount of estimated losses on uncompleted contracts whenever evidence indicates that the estimated total cost of a contract exceeds its estimated total revenue. All contract costs, including those associated with claims and change orders, are recorded as incurred and revisions to estimated total costs are reflected as soon as the obligation to perform is determined. Contract costs consist of direct costs on contracts, including labor and materials, amounts payable to subcontractors, direct overhead costs and equipment expense (primarily depreciation, fuel, maintenance and repairs). All state and federal government contracts and many of our other contracts provide for termination of the contract at the convenience of the party contracting with us, with provisions to pay us for work performed through the date of termination.
The accuracy of our revenue and profit recognition in a given period is dependent on the accuracy of our estimates of the cost to complete each project. Cost estimates for all of our significant projects use a detailed “bottom up” approach and we believe our experience allows us to provide materially reliable estimates. There are a number of factors that can contribute to changes in estimates of contract cost and profitability. The most significant of these include:
the completeness and accuracy of the original bid;
costs associated with scope changes where final price negotiations are not complete;
costs of labor and/or materials;
extended overhead due to owner, weather and other delays;
subcontractor performance issues;
changes in productivity expectations;
site conditions that differ from those assumed in the original bid (to the extent contract remedies are unavailable);
continuing changes from original design on design/build projects;
the availability and skill level of workers in the geographic location of the project; and
a change in the availability and proximity of equipment and materials.
The foregoing factors as well as the stage of completion of contracts in process and the mix of contracts at different margins may cause fluctuations in gross profit between periods. Substantial changes in cost estimates, particularly in our larger, more complex projects have had, and can in future periods have, a significant effect on our profitability.
Our contracts with our customers are primarily either “fixed unit price” or “fixed price.” Under fixed unit price contracts, we are committed to provide materials or services required by a project at fixed unit prices (for example, dollars per cubic yard of concrete placed or cubic yards of earth excavated). While the fixed unit price contract shifts the risk of estimating the quantity of units required for a particular project to the customer, any increase in our unit cost over the expected unit cost in the bid, whether due to inflation, inefficiency, faulty estimates or other factors, is borne by us unless otherwise provided in the contract. Fixed price contracts are priced on a lump-sum basis under which we bear the risk that we may not be able to perform all the work profitably for the specified contract amount. The percentage of fixed price contracts in our contract backlog decreased from approximately 69.5% at December 31, 2011 to approximately 56.8% at December 31, 2012.

25
 

 
 



Table of Contents

Valuation of Real Estate Held for Development and Sale
The carrying amount of each consolidated real estate development project is reviewed on a quarterly basis in accordance with Accounting Standards Codification (“ASC”) Topic 360, Property, Plant, and Equipment, and each real estate development project accounted for under the equity method of accounting is reviewed in accordance with ASC Topic 323, Investments - Equity Method and Joint Ventures, to determine if impairment charges should be recognized. The review of each consolidated project includes an evaluation to determine if events or changes in circumstances indicate that a consolidated project’s carrying amount may not be recoverable. If events or changes in circumstances indicate that a consolidated project’s carrying amount may not be recoverable, the future undiscounted cash flows are estimated and compared to the project’s carrying amount. In the event that the project’s estimated future undiscounted cash flows or investment’s fair value are not sufficient to recover the carrying amounts, it is written down to its estimated fair value. The projects accounted for under the equity method are evaluated for impairment using the other-than-temporary impairment model, which requires an impairment charge to be recognized if our investment’s carrying amount exceeds its fair value, and the decline in fair value is deemed to be other than temporary.
Events or changes in circumstances, which would cause us to review for impairment include, but are not limited to: 
significant decreases in the market price of the asset;
significant adverse changes in legal factors or the business climate;
significant changes to the development or business plans of a project;
accumulation of costs significantly in excess of the amount originally expected for the acquisition, development or construction of the asset; and
current period cash flow or operating losses combined with a history of losses, or a forecast of continuing losses associated with the use of the asset.
Future undiscounted cash flows and fair value assessments are estimated based on entitlement status, market conditions, cost of construction, debt load, development schedules, status of joint venture partners and other factors applicable to the specific project. Fair value is estimated based on the expected future cash flows attributable to the asset or group of assets and on other assumptions that market participants would use in determining fair value, such as market discount rates, transaction prices for other comparable assets, and other market data. Our estimates of cash flows may differ from actual cash flows due to, among other things, fluctuations in interest rates, decisions made by jurisdictional agencies, economic conditions, or changes to our business operations.
During the year ended December 31, 2010, the Enterprise Improvement Plan required changes in the business plans of certain real estate projects to reduce capital expenditures, shorten development timelines, and revise marketing plans for the projects, thus reducing their estimated future cash flows. Consequently, during the year ended December 31, 2010, we recorded impairment charges of $86.3 million, of which approximately $20.0 million was attributable to noncontrolling interests, on approximately one-third of our real estate investments related to the Enterprise Improvement Plan. See Note 11 of “Notes to the Consolidated Financial Statements” and “Restructuring Charges” below for further information. Additionally, an evaluation of entitlement status, market conditions, existing offers to purchase, cost of construction, debt load, development schedule, status of joint venture partners and other factors specific to the remainder of our real estate projects, resulted in no significant impairment charges during the year ended December 31, 2010. During the years ended December 31, 2012 and 2011, we recorded no significant impairment charges related to our real estate development projects or investments.
Given the current economic environment surrounding real estate, we regularly evaluate the recoverability of our real estate held for development and sale and have determined that no further impairment charges were required at December 31, 2012. A continued decline in the residential and/or commercial real estate markets may decrease the expected cash flow for certain development activities to the point we would be required to recognize additional impairments in the future.
Insurance Estimates
We carry insurance policies to cover various risks, primarily general liability, automobile liability and workers compensation, under which we are liable to reimburse the insurance company for a portion of each claim paid. Payment for general liability and workers compensation claim amounts generally range from the first $0.5 million to $1.0 million per occurrence. We accrue for probable losses, both reported and unreported, that are reasonably estimable using actuarial methods based on historic trends, modified, if necessary, by recent events. Changes in our loss assumptions caused by changes in actual experience would affect our assessment of the ultimate liability and could have an effect on our operating results and financial position up to $1.0 million per occurrence.


26
 

 
 



Table of Contents

Current Economic Environment and Outlook for 2013
Overall, we are pleased with the quality of our backlog and the significant amount of projects, particularly large projects, out to bid across the country. Despite these opportunities, we continue to operate in a highly competitive bidding environment. Competition coupled with funding issues for public sector infrastructure projects and weak demand for commercial and residential development in many of our markets may impact our ability to grow backlog and increase profitability. While we expect these challenging conditions to persist through 2013, we are encouraged by recent progress on the federal funding level. In addition, we are proactively seeking opportunities through our acquisition of Kenny and in our traditional markets while leveraging our capabilities and further diversifying into the rail, power, tunnel, water, industrial and federal government markets.
After numerous short-term extensions, the President signed into law a 27-month reauthorization of the federal surface transportation program, Moving Ahead for Progress in the 21st Century (“MAP-21”) in 2012. MAP-21 authorizes spending for the transportation program at fiscal 2012 levels with a slight adjustment for inflation in fiscal 2013 and 2014. MAP-21 also reauthorized the Transportation Infrastructure Financing and Innovation Act (“TIFIA”) that provides for $1.7 billion in calculated capital over the next two years and includes financing options in connection with public-private partnership (“P3”) arrangements for infrastructure financing. We are optimistic that the TIFIA program will help facilitate and accelerate many projects that would not have moved forward otherwise.
As part of our diversification efforts, we acquired 100% of the outstanding shares of Kenny Construction Company (“Kenny”) on December 31, 2012. The addition of Kenny’s expertise in the power, tunnel and underground markets will significantly expand our presence in these key areas as well as enable us to leverage our capabilities and geographic footprint. Including integration costs and the impact of intangible amortization, the transaction is expected to be break-even relative to Granite’s 2013 earnings per share.
In addition, in December of 2012, Granite’s joint venture teams were selected to build the $3.1 billion Tappan Zee Bridge project in New York and the $849.0 million design-build IH-35E project in Texas. The Tappan Zee project was awarded in January 2013 and Granite’s 23.3% share will be booked into Large Project Construction contract backlog in the first quarter of 2013. The IH-35E project is expected to be awarded in the second quarter of 2013, and Granite’s 35% share of the IH-35E project is expected to be booked into Large Project Construction contract backlog in the second quarter of 2013.
During 2013, we may record up to $8.0 million of restructuring charges, primarily related to previously planned consolidation efforts and assets to be held-for-sale as part of our Enterprise Improvement Plan. The majority of restructuring charges associated with the Enterprise Improvement Plan were recorded in 2010. The ultimate amount and timing of future restructuring charges is subject to our ability to negotiate sales of certain assets at prices acceptable to us.
Results of Operations
Comparative Financial Summary
 
 
 
 
 
 
Years Ended December 31,
 
2012
 
2011
 
2010
(in thousands)
 
 
 
 
 
 
Total revenue
 
$
2,083,037

 
$
2,009,531

 
$
1,762,965

Gross profit
 
234,759

 
247,963

 
177,784

Restructuring (gains) charges, net
 
(3,728
)
 
2,181

 
109,279

Operating income (loss)
 
80,835

 
99,269

 
(109,340
)
Total other income (expense)
 
194

 
(9,836
)
 
2,964

Amount attributable to noncontrolling interests
 
(14,637
)
 
(14,924
)
 
3,465

Net income (loss) attributable to Granite Construction Incorporated
 
45,283

 
51,161

 
(58,983
)


27
 

 
 



Table of Contents

Revenue
Total Revenue by Segment
 
 
 
 
 
 
 
 
 
 
Years Ended December 31,
2012
2011
 
2010
(dollars in thousands)
Amount

 
Percent
Amount

 
Percent
 
Amount

 
Percent
Construction
$
984,106

 
47.2
$
1,043,614

 
51.9
 
$
943,245

 
53.5
Large Project Construction
863,217

 
41.5
725,043

 
36.1
 
584,406

 
33.1
Construction Materials
230,642

 
11.1
220,583

 
11.0
 
222,058

 
12.6
Real Estate
5,072

 
0.2
20,291

 
1.0
 
13,256

 
0.8
Total
$
2,083,037

 
100.0
$
2,009,531

 
100.0
 
$
1,762,965

 
100.0
Construction Revenue
 
 
 
 
 
 
 
 
 
 
Years Ended December 31,
2012
2011
 
2010
(dollars in thousands)
Amount
 
Percent
Amount
 
Percent
 
Amount
 
Percent
California:
 
 
 
 
 
 
 
 
 
 
Public sector
$
438,113

 
44.5
$
464,789

 
44.4
 
$
358,723

 
38.0
Private sector
53,723

 
5.5
46,694

 
4.5
 
32,139

 
3.4
Northwest:
 
 
 
 
 
 
 
 
 
 
Public sector
326,281

 
33.2
386,783

 
37.1
 
421,397

 
44.7
Private sector
101,563

 
10.3
36,072

 
3.5
 
24,334

 
2.6
East:
 
 
 
 
 
 
 
 
 
 
Public sector
51,457

 
5.2
107,693

 
10.3
 
103,398

 
11.0
Private sector
12,969

 
1.3
1,583

 
0.2
 
3,254

 
0.3
Total
$
984,106

 
100.0
$
1,043,614

 
100.0
 
$
943,245

 
100.0
Construction revenue for the year ended December 31, 2012 decreased by $59.5 million, or 5.7%, compared to the year ended December 31, 2011. The decrease was primarily due to less public sector revenue related to entering the year with lower backlog in the Northwest and East, as well as a decline in bid success in our California group. The decreases in public sector revenue were partially offset by increases in private sector revenue in the Northwest associated with work in the power and industrial markets.
Large Project Construction Revenue1
 
 
 
 
 
 
 
 
 
 
 
 
Years Ended December 31,
 
2012
 
2011
 
2010
(dollars in thousands)
 
Amount

 
Percent
 
Amount

 
Percent
 
Amount

 
Percent
California
 
$
111,692

 
12.9
 
$
78,464

 
10.8
 
$
49,408

 
8.5
Northwest
 
278,449

 
32.3
 
201,240

 
27.8
 
52,510

 
9.0
East
 
473,076

 
54.8
 
445,339

 
61.4
 
482,488

 
82.5
Total
 
$
863,217

 
100.0
 
$
725,043

 
100.0
 
$
584,406

 
100.0
1For the periods presented, all Large Project Construction revenue was earned from the public sector.
Large Project Construction revenue for the year ended December 31, 2012 increased by $138.2 million, or 19.1%, compared to the year ended December 31, 2011. The increase was primarily due to progress on jobs in California and the Northwest that were awarded in late 2010 and early 2011 as well as progress on several other projects in the Northwest.

28
 

 
 



Table of Contents

Construction Materials Revenue
 
 
 
 
 
 
 
 
 
 
 
 
Years Ended December 31,
 
2012
 
2011
 
2010
(dollars in thousands)
 
Amount

 
Percent
 
Amount

 
Percent
 
Amount

 
Percent
California
 
$
140,315

 
60.8
 
$
140,468

 
63.7
 
$
136,314

 
61.4
Northwest
 
69,834

 
30.3
 
62,406

 
28.3
 
64,966

 
29.2
East
 
20,493

 
8.9
 
17,709

 
8.0
 
20,778

 
9.4
Total
 
$
230,642

 
100.0
 
$
220,583

 
100.0
 
$
222,058

 
100.0
 
Construction Materials revenue for the year ended December 31, 2012 increased $10.1 million, or 4.6%, when compared to the year ended December 31, 2011. The construction materials business continues to be impacted by the weakness in the commercial and residential development markets.
Real Estate Revenue
Real Estate revenue for the year ended December 31, 2012 decreased by $15.2 million, or 75.0% compared to the year ended December 31, 2011. The decrease was primarily attributable to the sale of commercial properties in California during 2011. Factors that contribute to fluctuations in revenue include national and local market conditions, entitlement status of properties and buyers access to capital. Additionally, as we execute on our Enterprise Improvement Plan, we have less real estate for sale.
Contract Backlog
Our contract backlog consists of the remaining unearned revenue on awarded contracts, including 100% of our consolidated joint venture contracts and our proportionate share of unconsolidated joint venture contracts. We generally include a project in our contract backlog at the time it is awarded and funding is in place. Certain federal government contracts where funding is appropriated on a periodic basis are included in contract backlog at the time of the award. Substantially all of the contracts in our contract backlog may be canceled or modified at the election of the customer; however, we have not been materially adversely affected by contract cancellations or modifications in the past. 
The following tables illustrate our contract backlog as of the respective dates:
Total Contract Backlog by Segment
 
  
December 31,
 
2012
 
2011
(dollars in thousands)
 
Amount
 
Percent
 
Amount
 
Percent
Construction
 
$
629,898

 
36.9
 
$
513,624

 
25.4
Large Project Construction
 
1,077,417

 
63.1
 
1,508,830

 
74.6
Total
 
$
1,707,315

 
100.0
 
$
2,022,454

 
100.0

29
 

 
 



Table of Contents

Construction Contract Backlog
 
 
 
 
December 31,
 
2012
 
2011
(dollars in thousands)
 
Amount
 
Percent
 
Amount
 
Percent
California:
 
 
 
 
 
 
 
 
Public sector
 
$
252,070

 
40.1
 
$
311,975

 
60.7
Private sector
 
42,622

 
6.8
 
10,899

 
2.1
Northwest:
 
 
 
 
 
 

 
 
Public sector
 
153,146

 
24.3
 
148,030

 
28.8
Private sector
 
24,085

 
3.8
 
26,543

 
5.2
East:
 
 
 
 
 
 

 
 
Public sector
 
14,723

 
2.3
 
13,163

 
2.6
Private sector
 
3,880

 
0.6
 
3,014

 
0.6
Kenny:
 
 
 
 
 
 
 
 
Public sector
 
37,153

 
5.9
 

 
Private sector
 
102,219

 
16.2
 

 
Total
 
$
629,898

 
100.0
 
$
513,624

 
100.0
Construction contract backlog of $629.9 million at December 31, 2012 was $116.3 million, or 22.6%, higher than at December 31, 2011. The increase was primarily due to the acquisition of Kenny contract backlog, as well as an increase in California private sector backlog due to improved success rate on private sector bidding activity and diversification into the power market. The increases were offset by decreases in the California public sector due to progress on existing projects and lower success rate with continued intense competition.
Large Project Construction Contract Backlog1
 
  
 
   
December 31,
 
2012
 
2011
(dollars in thousands)
 
Amount
 
Percent
 
Amount
 
Percent
California1
 
$
140,685

 
13.1
 
$
214,698

 
14.2
Northwest1
 
192,285

 
17.8
 
397,957

 
26.4
East1
 
526,854

 
48.9
 
896,175

 
59.4
Kenny:
 
 
 
 
 
 
 
 
Public sector
 
144,344

 
13.4
 

 
Private sector
 
73,249

 
6.8
 

 
Total
 
$
1,077,417

 
100.0
 
$
1,508,830

 
100.0
1California, Northwest and East Large Project Construction contract backlog is from contracts with public agencies.
Large Project Construction contract backlog of $1.1 billion at December 31, 2012 was $431.4 million, or 28.6%, lower than at December 31, 2011. The decrease primarily reflects work completed during the period, partially offset by new awards and the acquisition of Kenny contract backlog. Noncontrolling interests included in Large Project Construction contract backlog as of December 31, 2012 and 2011 were $112.8 million and $154.6 million, respectively.
In January 2013, Granite’s joint venture team was awarded a $3.1 billion contract to build the Tappan Zee Bridge in New York. Granite’s 23.3%, or $733.0 million, share will be booked into contract backlog in the first quarter of 2013. In addition, in December 2012 Granite’s joint venture team was selected for the IH-35E design-build project in Texas. The proposed price for the IH-35E design-build project is $849.0 million for the base contract, plus options which, if exercised by TxDOT, may increase the total contract price to approximately $1.2 billion. Granite’s 35% share will be booked into contract backlog when a final contract is approved and a notice to proceed is issued, which is expected to be in the second quarter of 2013.
Large Project Construction contracts with forecasted losses represented $172.6 million, or 16.0%, and $91.4 million, or 6.1%, respectively, of Large Project Construction contract backlog at December 31, 2012 and 2011. Provisions are recognized in the consolidated statements of operations for the full amount of estimated losses on uncompleted contracts whenever evidence indicates that the estimated total cost of a contract exceeds its estimated total revenue.

30
 

 
 



Table of Contents

Gross Profit
The following table presents gross profit by business segment for the respective periods:
Years Ended December 31,
 
2012
 
2011
 
2010
(dollars in thousands)
 
 
 
 
 
 
Construction
 
$
77,963

 
$
124,506

 
$
95,709

Percent of segment revenue
 
7.9
%
 
11.9
%
 
10.1
%
Large Project Construction
 
148,418

 
104,108

 
67,307

Percent of segment revenue
 
17.2
%
 
14.4
%
 
11.5
%
Construction Materials
 
7,572

 
16,641

 
12,018

Percent of segment revenue
 
3.3
%
 
7.5
%
 
5.4
%
Real Estate
 
806

 
2,708

 
2,750

Percent of segment revenue
 
15.9
%
 
13.3
%
 
20.7
%
Total gross profit
 
$
234,759

 
$
247,963

 
$
177,784

Percent of total revenue
 
11.3
%
 
12.3
%
 
10.1
%
We defer profit recognition until a project reaches at least 25% completion. In the case of large, complex design/build projects, we may defer profit recognition beyond the point of 25% completion until such time as we believe we have enough information to make a reasonably dependable estimate of contract revenue and cost. Because we have a large number of smaller projects at various stages of completion in our Construction segment, this policy generally does not impact gross profit significantly on a quarterly or annual basis. However, our Large Project Construction segment has fewer projects at any given time; therefore, gross profit can vary significantly in periods where one or more projects reach our percentage of completion threshold and the deferred profit is recognized or, conversely, in periods where contract backlog is growing rapidly and a higher percentage of projects are in their early stages with no associated gross profit recognition.
The following table presents revenue from projects that have not yet reached our profit recognition threshold:
Years Ended December 31,
 
2012
 
2011
 
2010
(in thousands)
 
 
 
 
 
 
Construction
 
$
22,110

 
$
10,363

 
$
13,697

Large Project Construction
 
16,982

 
38,542

 
142,965

Total revenue from contracts with deferred profit
 
$
39,092

 
$
48,905

 
$
156,662

We do not recognize revenue from contract claims until we have a signed agreement and payment is assured, nor do we recognize revenue from contract change orders until the owner has agreed to the change order in writing. However, we do recognize the costs related to any contract claims or pending change orders in our forecasts when costs are incurred, and revisions to estimated total costs are reflected as soon as the obligation to perform is determined. As a result, our gross profit as a percent of revenue can vary depending on the magnitude and timing of settlement claims and change orders.
When we experience significant contract forecast changes, we review the nature of the changes to ensure that there are no material amounts that should have been recorded in a prior period rather than as a change in estimate for the current period. In our review of these changes for the years ended December 31, 2012, 2011 and 2010 we did not identify any material amounts that should have been recorded in a prior period.

31
 

 
 



Table of Contents

Construction gross profit in 2012 decreased $46.5 million compared to 2011. Construction gross profit as a percent of segment revenue for 2012 decreased to 7.9% from 11.9% in 2011. The decreases were due to increased competition and challenging market conditions primarily in California. In addition, the decreases during 2012 included a net decrease of $18.1 million from revisions in estimates compared to a net increase of $6.2 million for 2011, due to lower productivity than originally anticipated (see Note 2 of “Notes to the Consolidated Financial Statements”).
Large Project Construction gross profit in 2012 increased $44.3 million compared to 2011. Large Project Construction gross profit as a percent of segment revenue for 2012 increased to 17.2% from 14.4% in 2011. The increase was primarily due to a net increase of $64.6 million from revisions in estimates in 2012 due to lower than anticipated construction costs and owner directed scope changes compared to a net increase of $8.9 million in 2011 (see Note 2 of “Notes to the Consolidated Financial Statements”).
Construction Materials gross profit in 2012 decreased $9.1 million compared to 2011. Construction Materials gross profit as a percent of segment revenue for 2012 decreased to 3.3% from 7.5% in 2011. The decreases are primarily due to poor economic conditions at certain California locations.
Real Estate gross profit decreased $1.9 million during 2012 when compared to 2011. The decrease was primarily due to the execution of our Enterprise Improvement Plan which reduced our real estate available for sale.
Selling, General and Administrative Expenses
The following table presents the components of selling, general and administrative expenses for the respective periods:
Years Ended December 31,
 
2012
 
2011
 
2010
(dollars in thousands)
 
 
 
 
 
 
Selling
 
 

 
 

 
 

Salaries and related expenses
 
$
35,051

 
$
33,342

 
$
40,332

Other selling expenses
 
13,321

 
9,066

 
12,944

Total selling
 
48,372

 
42,408

 
53,276

General and administrative
 
 

 
 

 
 

Salaries and related expenses
 
57,583

 
51,041

 
65,127

Restricted stock amortization and incentive compensation
 
22,452

 
23,925

 
21,664

Other general and administrative expenses
 
56,692

 
44,928

 
51,526

Total general and administrative
 
136,727

 
119,894

 
138,317

Total selling, general and administrative
 
$
185,099

 
$
162,302

 
$
191,593

Percent of revenue
 
8.9
%
 
8.1
%
 
10.9
%
Selling, general and administrative expenses for 2012 increased $22.8 million, or 14.0%, compared to 2011.
Selling Expenses
Selling expenses include the costs for aggregate permits, business development, estimating and bidding. Selling expenses can vary depending on the volume of projects in process and the number of employees assigned to estimating and bidding activities. As projects are completed or the volume of work slows down, we temporarily redeploy project employees to bid on new projects, moving their salaries and related costs from cost of revenue to selling expenses. Selling expenses for 2012 increased $6.0 million or 14.1% compared to 2011. The increase was primarily related to increased costs associated with large projects pursuits.
General and Administrative Expenses
General and administrative expenses include costs related to our operational offices that are not allocated to direct contract costs and expenses related to our corporate functions. These costs include variable cash and restricted stock performance-based incentives for select management personnel on which our compensation strategy heavily relies. The cash portion of these incentives is expensed when earned while the restricted stock portion is expensed over the vesting period of the restricted stock award (generally three years). Other general and administrative expenses include changes in the fair market value of our Non-Qualified Deferred Compensation (“NQDC”) plan liability, information technology, occupancy, office supplies, depreciation, travel and entertainment, outside services, training and other miscellaneous expenses none of which individually exceeded 10% of total general and administrative expenses.
Total general and administrative expenses for 2012 increased $16.8 million or 14.0% compared to 2011 primarily due to an increase of $11.8 million or 26.2% in other general and administrative expenses. The increase in other general and administrative expenses during the year ended December 31, 2012 was primarily due to acquisition-related costs of $4.4 million and an increase of $2.0 million in the fair market value of our NQDC plan liability.

32
 

 
 



Table of Contents

Restructuring (Gains) Charges, Net
The following table presents the components of restructuring (gains) charges, net during the respective periods:
Years ended December 31,
2012
2011
2010
(in thousands)
 
 
 
(Gains) impairment associated with our real estate investments, net
$
(3,093
)
$
1,452

$
86,341

Severance costs

471

12,635

Impairment charges on assets held-for-sale or abandoned 

226

7,521

Lease termination (gains) costs, net of estimated sublease income
(635
)
32

2,782

Total
$
(3,728
)
$
2,181

$
109,279

In October 2010, we announced our Enterprise Improvement Plan that included continued actions to reduce our cost structure, enhance operating efficiencies and strengthen our business to achieve long-term profitable growth. The majority of restructuring charges associated with the Enterprise Improvement Plan were recorded in 2010. The restructuring gains and charges recorded in 2012 and 2011 were the result of executing our Enterprise Improvement Plan.
During 2013, we may record up to $8.0 million of restructuring charges, primarily related to previously planned additional consolidation efforts and assets to be held-for-sale as part of our Enterprise Improvement Plan. The ultimate amount and timing of future restructuring charges is subject to market conditions and our ability to negotiate sales of certain assets at prices acceptable to us.
Gain on Sales of Property and Equipment
The following table presents the gain on sales of property and equipment for the respective periods:
Years Ended December 31,
 
2012
 
2011
 
2010
(in thousands)
 
 
 
 
 
 
Gain on sales of property and equipment
 
27,447

 
15,789

 
13,748

Gain on sales of property and equipment for 2012 increased $11.7 million, or 73.8%, compared to 2011, primarily due to an $18.0 million gain from the sale of an underutilized quarry asset in the fourth quarter of 2012. This sale was related to our process of continually optimizing our assets separate from the Enterprise Improvement Plan.
 

33
 

 
 



Table of Contents

Other Income (Expense)
The following table presents the components of other income (expense) for the respective periods:
Years Ended December 31,
 
2012
 
2011
 
2010
(in thousands)
 
 
 
 
 
 
Interest income
 
$
2,626

 
$
2,878

 
$
4,980

Interest expense
 
(10,603
)
 
(10,362
)
 
(9,740
)
Equity in income of affiliates
 
1,988

 
2,193

 
756

Other income (expense), net
 
6,183

 
(4,545
)
 
6,968

Total other income (expense)
 
$
194

 
$
(9,836
)
 
$
2,964

Other income (expense), net in 2012 included a $7.4 million gain from the sale of gold, a by-product of aggregate production, partially offset by a $2.8 million non-cash impairment charge from the write-off of our cost method investment in the preferred stock of a corporation that designs and manufactures power generation equipment.
Income Taxes
The following table presents the provision for (benefit from) income taxes for the respective periods:
Years Ended December 31,
 
2012

2011

2010
(dollars in thousands)
 
 
 
 
 
 
Provision for (benefit from) income taxes
 
$
21,109

 
$
23,348

 
$
(43,928
)
Effective tax rate
 
26.1
%
 
26.1
%
 
41.3
%
Our effective tax rate was essentially flat in 2012 from 2011 at 26.1%. The tax rate for the year ended December 31, 2012 included a $5.8 million release of a state valuation allowance. The tax rate for the year ended December 31, 2011 included the recognition and measurement of previously unrecognized tax benefits. The recognition and measurement of these tax benefits were the result of a favorable settlement of an income tax examination conducted by the Internal Revenue Service. Our tax rate is affected by discrete items that may occur in any given year, but are not consistent from year to year.
Amount Attributable to Noncontrolling Interests
The following table presents the amount attributable to noncontrolling interests in consolidated subsidiaries for the respective periods:
Years Ended December 31,
 
2012
 
2011
 
2010
(in thousands)
 
 
 
 
 
 
Amount attributable to noncontrolling interests
 
$
(14,637
)
 
$
(14,924
)
 
$
3,465

The amount attributable to noncontrolling interests represents the noncontrolling owners’ share of the income or loss of our consolidated construction joint ventures and real estate development entities.

34
 

 
 



Table of Contents

Prior Years
Revenue: Construction revenue for the year ended December 31, 2011 increased by $100.4 million, or 10.6%, compared to the year ended December 31, 2010. The increase was primarily due to our California group entering the year with greater contract backlog and improved success rate on bidding activity, as well as more favorable weather conditions late in 2011 when compared to 2010. The increase in California was partially offset by a decrease in the Northwest primarily due to an unusually wet spring and runoff from a heavy snowpack during the first half of 2011.
Large Project Construction revenue for the year ended December 31, 2011 increased by $140.6 million, or 24.1%, compared to the year ended December 31, 2010. The increase was primarily due to increases in revenue of our Northwest sector partially offset by decreases in our East sector. Revenue in the Northwest was significantly higher in 2011 as a result of work completed on two projects that were awarded in 2010. Revenue decreased in the East in 2011 when compared to 2010 primarily due to projects nearing completion.
Construction Materials revenue for the year ended December 31, 2011 was flat compared to the year ended December 31, 2010. The construction materials business continued to be impacted by the weakness in the commercial and residential development markets.
Real Estate revenue for the year ended December 31, 2011 increased by $7.0 million, or 53.1%, compared to the year ended December 31, 2010. The increase was primarily attributable to the sale of commercial properties in California during 2011. Factors that contribute to fluctuations in revenue include national and local market conditions, entitlement status of properties and buyers access to capital.
Contract Backlog: Construction contract backlog of $513.6 million at December 31, 2011 was $48.4 million, or 10.4%, higher than at December 31, 2010. The increase was due to improved success rate on bidding activity in California offset by progress on existing projects in the Northwest and the East. New awards during the year ended December 31, 2011 included two highway rehabilitation projects of $50.8 million and $58.6 million and a rail relocation project of $41.5 million, all in California.
Large Project Construction contract backlog of $1.5 billion at December 31, 2011 was $74.9 million, or 5.2%, higher than at December 31, 2010. The increase was primarily due to an improved success rate on bidding activity in California as well as new awards and additions to existing contracts in the East. The increase was partially offset by progress on existing projects in the Northwest. New awards included a $167.8 million design-build highway project in Texas. Additionally, backlog increased on our 34% portion of a light rail project in Texas by $242.2 million due to receiving full notice to proceed.
Gross Profit (Loss): Construction gross profit in 2011 increased to $124.5 million, or 11.9% of segment revenue, from $95.7 million, or 10.1% of segment revenue, in 2010. The increases were due to increased revenues, primarily in our California sector, successful execution of overlay and highway rebuild projects in Arizona and improved cost management of our equipment fleet.
Large Project Construction gross profit in 2011 increased to $104.1 million, or 14.4% of segment revenue, from $67.3 million, or 11.5% of segment revenue, in 2010. The increase was primarily due to recognition of profit on two transit projects in New York, a transit project in Houston and a new freeway, transit and trail system in Utah, all of which reached the profit recognition threshold in 2011.
Construction Materials gross profit increased to $16.6 million, or 7.5% of segment revenue, from $12.0 million, or 5.4% of segment revenue, in 2010. The increase was primarily due to increased production efficiencies of certain plants to meet growing Construction revenue.
Real Estate gross profit remained relatively unchanged during 2011 when compared to 2010 as the residential, commercial and private markets remained depressed.

35
 

 
 



Table of Contents

Selling, General and Administrative Expenses: Selling, general and administrative expenses decreased by $29.3 million, or 15.3%, to $162.3 million in 2011 from $191.6 million in 2010. Total selling expenses for 2011 decreased $10.9 million, or 20.4%, compared to 2010, primarily due to workforce reductions associated with our Enterprise Improvement Plan. Total general and administrative expenses for 2011 decreased $18.4 million, or 13.3%, compared to 2010. Salaries and related expenses for 2011 decreased $14.1 million compared to 2010 primarily due to the reduction in workforce associated with our Enterprise Improvement Plan as well as temporary benefit reductions and other ongoing efforts to reduce our cost structure. Other general and administrative expenses for 2011 decreased $6.6 million, or 12.8%, compared to 2010 due to our efforts to reduce our cost structure and discretionary spending, including a decrease of approximately $5.5 million in travel expenses, consulting fees and occupancy.
Restructuring Charges: During 2011 and 2010, we recorded restructuring charges of approximately $2.2 million and $109.3 million, respectively. The charges were primarily related to impairment charges on certain real estate investments of our Real Estate segment associated with our plans to orderly divest our real estate investment business subject to market conditions and our ability to negotiate sales of certain assets at prices acceptable to us. Restructuring charges during 2010 were also related to planned reductions in salaried positions that affected approximately 17% of our salaried workforce.
Other (Expense) Income: Interest income decreased $2.1 million for 2011, compared to 2010, primarily related to changes in federal and state look back interest income. Look back interest is the interest due or receivable on income tax related to revisions in estimated profitability on long-term contracts. Other (expense) income, net during 2011 consisted primarily of $3.7 million in impairment charges associated with our cost method investment in the preferred stock of a corporation that designs and manufactures power generation equipment. Other (expense) income, net during 2010 consisted primarily of $2.9 million of previously deferred income related to the sale of an investment in an affiliate in 2008.
Provision for Income Taxes: Our effective tax rate decreased to 26.1% in 2011 from 41.3% in 2010. The change was primarily due to the effect of noncontrolling interests as a percentage of net income (loss), as noncontrolling interests are not subject to income taxes on a stand-alone basis. Additionally, included in the tax rate for the year ended December 31, 2011 is the recognition and measurement of previously unrecognized tax benefits. The recognition and measurement of these tax benefits were the result of a favorable settlement of an income tax examination conducted by the Internal Revenue Service.
Amount Attributable to Noncontrolling Interests: The balance for 2011 changed compared to 2010 primarily due to $20.0 million associated with the impairment charges on our real estate held for development and sale from our plans to orderly divest of our real estate investment business. In addition, the balance changed as activity on consolidated joint venture projects neared completion.

36
 

 
 



Table of Contents

Liquidity and Capital Resources
We believe our cash and cash equivalents, short-term investments and cash generated from operations will be sufficient to meet our expected working capital needs, capital expenditures, financial commitments, cash dividend payments, and other liquidity requirements associated with our existing operations through the next twelve months. We maintain a secured revolving credit facility of $215.0 million primarily to provide capital needs to fund growth opportunities, either internally or generated through acquisition (see “Credit Agreement” section for further discussion). We do not anticipate that this credit facility will be required to fund future working capital needs. If we experience a prolonged change in our business operating results or make a significant acquisition, we may need to acquire additional sources of financing, which, if available, may be limited by the terms of our existing debt covenants, or may require the amendment of our existing debt agreements.
The following table presents our cash, cash equivalents and marketable securities, including amounts from our consolidated joint ventures, as of the respective dates:
December 31,
 
2012
 
2011
(in thousands)
 
 
 
 
Cash and cash equivalents excluding consolidated joint ventures
 
$
216,125

 
$
181,868

Consolidated construction joint venture cash and cash equivalents1
 
105,865

 
75,122

Total consolidated cash and cash equivalents
 
321,990

 
256,990

Short-term and long-term marketable securities2
 
111,430

 
149,658

Total cash, cash equivalents and marketable securities
 
$
433,420

 
$
406,648

 
1The volume and stage of completion of contracts from our consolidated construction joint ventures may cause fluctuations in joint venture cash and cash equivalents between periods. These funds generally are not available for the working capital or other liquidity needs of Granite.
2See Note 3 of “Notes to the Consolidated Financial Statements” for the composition of our marketable securities.
Our primary sources of liquidity are cash and cash equivalents and marketable securities. We may also from time to time issue and sell equity, debt or hybrid securities or engage in other capital market transactions.
Our cash and cash equivalents consisted of commercial paper, deposits and money market funds held with established national financial institutions. Marketable securities consist of U.S. government and agency obligations, commercial paper, municipal bonds and corporate bonds. Cash and cash equivalents held by our consolidated joint ventures represent the working capital needs of each joint venture’s project. The decision to distribute joint venture cash must generally be made jointly by all of the partners and, accordingly, these funds generally are not available for the working capital or other liquidity needs of Granite.
Our principal uses of liquidity are paying the costs and expenses associated with our operations, servicing outstanding indebtedness, making capital expenditures and paying dividends on our capital stock. We may also from time to time prepay or repurchase outstanding indebtedness and acquire assets or businesses that are complementary to our operations, such as with the acquisition of Kenny during 2012.
Cash Flows
Years Ended December 31,
 
2012
 
2011
 
2010
(in thousands)
 
 
 
 
 
 
Net cash provided by (used in):
 
 
 
 
 
 
Operating activities
 
$
91,790

 
$
92,345

 
$
29,318

Investing activities
 
(42,554
)
 
(27,728
)
 
(60,435
)
Financing activities
 
15,764

 
(59,649
)
 
(55,817
)
Cash provided by operating activities decreased $0.6 million in 2012 when compared to 2011. This decrease was primarily driven by a decrease in net income partially offset by a favorable change in working capital items in 2012 compared to 2011.
Cash used in investing activities was $14.8 million higher in 2012 than in 2011 primarily due to $79.6 million associated with the acquisition of Kenny during 2012 partially offset by a $51.5 million decrease in net purchases of marketable securities.
Cash provided by financing activities increased $75.4 million in 2012 compared to 2011. The primary reason for this change was a $70.0 million increase in proceeds from long-term debt due to borrowings from our revolving credit facility associated with the acquisition of Kenny.

37
 

 
 



Table of Contents

Capital Expenditures
During the year ended December 31, 2012, we had capital expenditures of $37.6 million compared to $45.0 million in 2011. Major capital expenditures are typically for aggregate and asphalt production facilities, aggregate reserves, construction equipment, buildings and leasehold improvements and investments in our information technology systems. The timing and amount of such expenditures can vary based on the progress of planned capital projects, the type and size of construction projects, changes in business outlook and other factors. We currently anticipate investing between $40.0 million and $60.0 million in capital expenditures during 2013.
Debt and Contractual Obligations 
The following table summarizes our significant obligations outstanding as of December 31, 2012:
 
Payments Due by Period
(in thousands)
Total
Less than 1 year
1-3 years
3-5 years
More than 5 years
Long-term debt - principal
$
290,130

$
19,059

$
40,966

$
150,049

$
80,056

Long-term debt - interest1
68,475

13,731

28,047

19,360

7,337

Operating leases2
36,288

6,983

10,466

6,960

11,879

Other purchase obligations3
4,854

3,417

1,437



Deferred compensation obligations4
24,148

3,814

6,830

4,185

9,319

Total
$
423,895

$
47,004

$
87,746

$
180,554

$
108,591

 

1 Included in the total is $0.2 million related to mortgages, the terms of which include variable interest rates that range from 4.5% to 5.75%. Also included in this balance is $6.9 million in interest related to borrowings under our Credit Agreement, the terms of which include a variable interest rate that was 2.56% as of December 31, 2012. The future payments were calculated using rates in effect as of December 31, 2012 and may differ from actual results.
2 These obligations represent the minimum rental commitments and minimum royalty requirements under all noncancellable operating leases. See Note 18 of “Notes to the Consolidated Financial Statements.”
These obligations represent firm purchase commitments for equipment and other goods and services not connected with our construction contract backlog which are individually greater than $10,000 and have an expected fulfillment date after February 28, 2013.
The timing of expected payment of deferred compensation is based on estimated dates of retirement. Actual dates of retirement could be different and would cause the timing of payments to change.
 
In addition to the significant obligations described above, as of December 31, 2012, we had the following obligations, which were excluded from the foregoing table:
approximately $3.2 million associated with uncertain tax positions filed on our tax returns were excluded because we cannot make a reasonably reliable estimate of the timing of potential payments relative to such reserves; and
asset retirement obligations of $26.6 million associated with our owned and leased quarry properties were excluded because the majority of them have an estimated settlement date beyond five years (see Note 8 of “Notes to the Consolidated Financial Statements”).


38
 

 
 



Table of Contents

Credit Agreement
We have a $215.0 million committed revolving credit facility, with a sublimit for letters of credit of $100.0 million (the “Credit Agreement”), which expires on October 11, 2016. Borrowings under the Credit Agreement bear interest at LIBOR or a base rate (at our option), plus an applicable margin based on certain financial ratios calculated quarterly. LIBOR varies based on the applicable loan term, market conditions and other external factors. The applicable margin was 2.25% for loans bearing interest based on LIBOR and 1.25%for loans bearing interest at the base rate at December 31, 2012. Accordingly, the effective interest rate was between 2.56% and 4.50% at December 31, 2012. Borrowings at the base rate have no designated term and may be repaid without penalty any time prior to the Credit Agreement’s maturity date. Borrowings at a Eurodollar rate have a term no less than one month and no greater than one year. Typically, at the end of such term, such borrowings may be rolled over at our discretion into either a borrowing at the base rate or a borrowing at a Eurodollar rate with similar terms, not to exceed the maturity date of the Credit Agreement. Our obligations under the Credit Agreement are guaranteed by certain of our subsidiaries and are collateralized on an equivalent basis with the obligations under the 2013 Notes and the 2019 Notes (each defined below) by first priority liens (subject only to other liens permitted under the Credit Agreement) on substantially all of the assets of the Company and our subsidiaries that are guarantors or borrowers under the Credit Agreement. At December 31, 2012, there was a revolving loan of $70.0 million outstanding under the Credit Agreement related to financing the Kenny acquisition, the balance of which is included in long-term debt on our consolidated balance sheet. In addition, there were standby letters of credit totaling approximately $10.9 million as of December 31, 2012. The letters of credit will expire between March and October 2013.
The Credit Agreement provides for the release of the liens securing the obligations, at our option and expense, after June 30, 2013, so long as certain conditions as defined by the terms in the Credit Agreement are satisfied (“Collateral Release Period”). If, subsequently, our Consolidated Fixed Charge Coverage Ratio is less than 1.25 or our Consolidated Leverage Ratio is greater than 2.50, then we will be required to promptly re-pledge substantially all of the assets of the Company and our subsidiaries that are guarantors or borrowers under the Credit Agreement.
Senior Notes Payable
As of December 31, 2012, senior notes payable in the amount of $8.3 million were due to a group of institutional holders in 2013 and bear interest at 6.96% per annum (“2013 Notes”). In addition, senior notes payable in the amount of $200.0 million were due to a second group of institutional holders in five equal annual installments beginning in 2015 and bear interest at 6.11% per annum (“2019 Notes”).
Our obligations under the note purchase agreements governing the 2013 Notes and 2019 Notes (the “2013 NPA” and the “2019 NPA,” respectively) are guaranteed by certain of our subsidiaries and are collateralized on an equivalent basis with the Credit Agreement by liens on substantially all of the assets of the Company and subsidiaries that are guarantors or borrowers under the Credit Agreement. The 2013 NPA and 2019 NPA provide for the release of liens and re-pledge of collateral on substantially the same terms and conditions as those set forth in the Credit Agreement.
Surety Bonds and Real Estate Mortgages
We are generally required to provide various types of surety bonds that provide an additional measure of security under certain public and private sector contracts. At December 31, 2012, approximately $1.6 billion of our contract backlog was bonded. Performance bonds do not have stated expiration dates; rather, we are generally released from the bonds after the owner accepts the work performed under contract. The ability to maintain bonding capacity to support our current and future level of contracting requires that we maintain cash and working capital balances satisfactory to our sureties.
A significant portion of our real estate held for development and sale is subject to mortgage indebtedness. All of this indebtedness is non-recourse to Granite but is recourse to the real estate entities that incurred the indebtedness. The terms of this indebtedness are typically renegotiated to reflect the evolving nature of the real estate projects as they progress through acquisition, entitlement and development. Modification of these terms may include changes in loan-to-value ratios requiring the real estate entities to pay down portions of the debt. As of December 31, 2012, the principal amount of debt of our consolidated real estate entities secured by mortgages was $11.6 million, of which $10.7 million was included in current liabilities and $0.9 million was included in long-term liabilities on our consolidated balance sheet.

39
 

 
 



Table of Contents

Covenants and Events of Default
The most significant restrictive covenants under the terms of our 2013 NPA, 2019 NPA and Credit Agreement require the maintenance of a minimum Consolidated Tangible Net Worth, a minimum Consolidated Interest Coverage Ratio and a maximum Consolidated Leverage Ratio. The calculations and terms of such financial covenants are defined in the Credit Agreement filed as Exhibit 10.1 to our Form 10-Q filed November 7, 2012 and in the applicable 2013 NPA and 2019 NPA agreements filed as Exhibit 10.6 and Exhibit 10.7 to our Form 10-Q filed November 7, 2012. As of December 31, 2012 and pursuant to the definitions in the agreements, our Consolidated Tangible Net Worth was $753.1 million, which exceeded the minimum of $665.7 million, the Consolidated Interest Coverage Ratio was 9.52, which exceeded the minimum of 4.00 and the Consolidated Leverage Ratio was 2.39, which did not exceed the maximum of 3.25 for the Credit Agreement and the maximum of 3.50 for the 2013 NPA and 2019 NPA. The maximum Consolidated Leverage Ratio for the Credit Agreement and 2013 NPA and 2019 NPA decreases to 3.00 and 3.25, respectively, for the quarter ending December 31, 2013, and each quarter ending thereafter. During any Collateral Release Period, the maximum Consolidated Leverage Ratio decreases to 2.50.
Our debt and credit agreements require us to comply with various affirmative, restrictive and financial covenants, including the financial covenants described above. Our failure to comply with any of these covenants, or to pay principal, interest or other amounts when due thereunder, would constitute an event of default under the applicable agreements. Under certain circumstances, the occurrence of an event of default under one of our debt or credit agreements (or the acceleration of the maturity of the indebtedness under one of our agreements) may constitute an event of default under one or more of our other debt or credit agreements. Default under our debt and credit agreements could result in (1) us no longer being entitled to borrow under the agreements, (2) termination of the agreements, (3) the requirement that any letters of credit under the agreements be cash collateralized, (4) acceleration of the maturity of outstanding indebtedness under the agreements and/or (5) foreclosure on any collateral securing the obligations under the agreements.
As of December 31, 2012, we were in compliance with the covenants contained in our senior note agreements, Credit Agreement, and debt agreements related to our consolidated real estate entities. We are not aware of any non-compliance by any of our unconsolidated entities with the covenants contained in their debt agreements. Subsequent to December 31, 2012, one of our consolidated real estate entities was in default under a debt agreement as a result of its failure to make a timely payment. The affected loan is non-recourse to Granite and the default does not result in cross-defaults under other debt agreements under which Granite is the obligor; however, there is recourse to the real estate entity that incurred the debt. The real estate entity in default is currently in discussions with the lender to revise the terms of the defaulted debt agreement.
Share Purchase Program
In 2007, our Board of Directors authorized us to purchase up to $200.0 million of our common stock at management’s discretion. As of December 31, 2012, $64.1 million was available for purchase. We did not purchase shares under the share purchase program in any of the periods presented.

40
 

 
 



Table of Contents

Joint Ventures; Off-Balance-Sheet Arrangements
We participate in various construction joint venture partnerships in order to share expertise, risk and resources for certain highly complex projects. Generally, each construction joint venture is formed to accomplish a specific project and is jointly controlled by the joint venture partners. We select our joint venture partners based on our analysis of their construction and financial capabilities, expertise in the type of work to be performed and past working relationships, among other criteria. The joint venture agreements typically provide that our interests in any profits and assets, and our respective share in any losses and liabilities, that may result from the performance of the contract are limited to our stated percentage interest in the project.
Under each joint venture agreement, one partner is designated as the sponsor. The sponsoring partner typically provides all administrative, accounting and most of the project management support for the project and generally receives a fee from the joint venture for these services. We have been designated as the sponsoring partner in certain of our current joint venture projects and are a non-sponsoring partner in others.
We also participate in various “line item” joint venture agreements under which each partner is responsible for performing certain discrete items of the total scope of contracted work. The revenue for these discrete items is defined in the contract with the project owner and each venture partner bears the profitability risk associated with its own work. There is not a single set of books and records for a line item joint venture. Each partner accounts for its items of work individually as it would for any self-performed contract. We account for our portion of these contracts as project revenues and costs in our accounting system and include receivables and payables associated with our work in our consolidated financial statements.
A venture’s contract with the project owner typically requires joint and several liability among the joint venture partners. Although our agreements with our joint venture partners for both construction joint ventures and line item joint ventures provide that each party will assume and fund its share of any losses resulting from a project, if one of our partners is unable to pay its share we would be fully liable under our contract with the project owner. Circumstances that could lead to a loss under these guarantee arrangements include a partner’s inability to contribute additional funds to the venture in the event that the project incurred a loss or additional costs that we could incur should the partner fail to provide the services and resources toward project completion that had been committed to in the joint venture agreement.
At December 31, 2012, we had approximately $1.6 billion of construction revenue to be recognized on unconsolidated and line item construction joint venture contracts, of which $553.8 million represented our share and the remaining $1.1 billion represented our partners’ share. We are not able to estimate other amounts that may be required beyond the remaining cost of the work to be performed. These costs could be offset by billings to the customer or by proceeds from our partners’ corporate and/or other guarantees.
Recently Issued Accounting Pronouncements
In December 2011, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Updated (“ASU”) No. 2011-11, Balance Sheet (Topic 210): Disclosures about Offsetting Assets and Liabilities. This ASU requires companies to disclose both gross and net information about financial instruments that have been offset on the consolidated balance sheet. This ASU will be effective commencing with our quarter ending March 31, 2013. We do not expect the adoption of this ASU to have an impact on our consolidated financial statements.
In July 2012, the FASB issued ASU No. 2012-02, Intangibles - Goodwill and Other (Topic 350): Testing Indefinite-Lived Intangible Assets for Impairment. This ASU gives companies the option to first assess qualitative factors to determine whether it is more likely than not that the indefinite-lived intangible asset is impaired. If it is determined that it is more likely than not the indefinite-lived intangible asset is impaired, a quantitative impairment test is required. However, if it is concluded otherwise, the quantitative test is not necessary. This ASU will be effective commencing with our quarter ending March 31, 2013. We do not expect the adoption of this ASU to have an impact on our consolidated financial statements.

41
 

 
 



Table of Contents

Item 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
We maintain an investment portfolio of various holdings, types and maturities. We place our cash investments in instruments that meet high credit quality standards, as specified in our investment policy. This policy prohibits investments in auction rate and asset-backed securities. It also limits the amount of credit exposure to any one issue, issuer or type of instrument. The portfolio is limited to an average maturity of no more than one year from date of purchase. On an ongoing basis we monitor credit ratings, financial condition and other factors that could affect the carrying amount of our investment portfolio.  
Marketable securities, consisting of U.S. government and agency obligations, commercial paper, corporate bonds and municipal bonds, are generally classified as held-to-maturity and are stated at cost, adjusted for amortization of premiums and discounts to maturity.
We are exposed to financial market risks due largely to changes in interest rates, which we have managed primarily by managing the maturities in our investment portfolio. We do not have any material business transactions in foreign currencies.
We are exposed to various commodity price risks, including, but not limited to, diesel fuel, natural gas, propane, steel, cement and liquid asphalt arising from transactions that are entered into in the normal course of business. In order to manage or reduce commodity price risk, we monitor the costs of these commodities at the time of bid and price them into our contracts accordingly. Additionally, some of our contracts include commodity price escalation clauses which partially protect us from increasing prices. At times we enter into supply agreements or pre-purchase commodities to secure pricing and use financial contracts to further manage price risk. As of December 31, 2012 and 2011, we had no material financial contracts in place.
The fair value of our short-term held-to-maturity investment portfolio and related income would not be significantly affected by changes in interest rates since the investment maturities are short and the interest rates are primarily fixed. The fair value of our long-term held-to-maturity investment portfolio may be affected by changes in interest rates.
Given the short-term nature of certain investments, our investment income is subject to the general level of interest rates in the United States at the time of maturity and reinvestment.
We had outstanding senior notes payable, which carry a fixed interest rate per annum, as follows (in millions):
December 31,
2012
Principal payments due in nine equal installments that began in 2005, 6.96% 
$
8.3

Principal payments due in five equal installments beginning in 2015, 6.11% 
200.0

Total
$
208.3

At December 31, 2012, there was $70.0 million in revolving loans outstanding under the Credit Agreement related to financing the Kenny acquisition, which is included in long-term debt on our consolidated balance sheet. These borrowings bear interest at LIBOR or a base rate (at our option), plus an applicable margin based on certain financial ratios calculated quarterly. The applicable margin was 2.25% for loans bearing interest based on LIBOR and 1.25% for loans bearing interest at the base rate at December 31, 2012. Accordingly, the effective interest rate was between 2.56% and 4.50% at December 31, 2012.

42
 

 
 



Table of Contents

The table below presents principal amounts due by year and related weighted average interest rates for our cash and cash equivalents, held-to-maturity investments and other significant debt obligations as of December 31, 2012 (dollars in thousands):
 
2013
2014
2015
2016
2017
Thereafter
Total
Assets
 
 
 
 
 
 
 
Cash, cash equivalents, held-to-maturity investments
$
378,078

$
10,000

$
14,439

$
15,903

$
15,000

$

$
433,420

Weighted average interest rate
0.48
%
0.27
%
0.44
%
0.70
%
1.07
%
%
0.50
%
Liabilities
 
 
 
 
 
 
 
Fixed rate debt
 
 
 
 
 
 
 
Senior notes payable
$
8,333

$

$
40,000

$
40,000

$
40,000

$
80,000

$
208,333

Weighted average interest rate
6.96
%
%
6.11
%
6.11
%
6.11
%
6.11
%
6.00
%
Variable rate debt
 
 
 
 
 
 
 
Credit Agreement loan
$

$

$

$
70,000

$

$

$
70,000

Weighted average interest rate1
%
%
%
2.56
%
%
%
2.56
%
1The weighted average interest rate was calculated using rates in effect as of December 31, 2012 and may differ from actual results.

The estimated fair value of our cash, cash equivalents and short-term held-to-maturity investments approximates the principal amounts reflected above based on the generally short maturities of these financial instruments. The estimated fair value of our long-term held-to-maturity investments approximates the principal amounts above due to the relatively minor difference between the effective yields of these investments and rates currently available on similar instruments. Rates currently available to us for debt with similar terms and remaining maturities are used to estimate fair value of existing debt. Based on the fixed borrowing rates currently available to us for bank loans with similar terms and average maturities, the fair value of the senior notes payable was approximately $243.1 million as of December 31, 2012 and $250.5 million as of December 31, 2011 and the fair value of the Credit Agreement loan was approximately $70.4 million as of December 31, 2012.
Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
The following consolidated financial statements of Granite, the supplementary data and the independent registered public accounting firm’s report are incorporated by reference from Part IV, Item 15(1) and (2):
Report of Independent Registered Public Accounting Firm
Consolidated Balance Sheets - At December 31, 2012 and 2011
Consolidated Statements of Operations - Years Ended December 31, 2012, 2011 and 2010
Consolidated Statements of Shareholders’ Equity - Years Ended December 31, 2012, 2011 and 2010
Consolidated Statements of Cash Flows - Years Ended December 31, 2012, 2011 and 2010
Notes to the Consolidated Financial Statements
Quarterly Financial Data (unaudited)
Schedule II - Schedule of Valuation and Qualifying Accounts


43
 

 
 



Table of Contents

Item 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
Not applicable.

Item 9A. CONTROLS AND PROCEDURES
Evaluation of Disclosure Controls and Procedures: Our management carried out, as of December 31, 2012, with the participation of our Chief Executive Officer and our Chief Financial Officer, an evaluation of the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)). Based on that evaluation, our Chief Executive Officer and Chief Financial Officer concluded that, as of December 31, 2012, our disclosure controls and procedures were effective to provide reasonable assurance that material information required to be disclosed by us in reports we file under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC rules and forms and that information required to be disclosed by us in the reports we file or submit under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
Changes in Internal Control Over Financial Reporting: There were changes in our internal controls over financial reporting that occurred during the fourth quarter of 2012 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting. In particular, as was disclosed in our Quarterly Report on Form 10-Q for the three months ended September 30, 2012, we implemented new enterprise resource planning software during the first quarter of 2012. In the third and fourth quarters of 2012 we modified existing internal controls as part of the ongoing integration of such enterprise resource planning software.
Management’s Report on Internal Control Over Financial Reporting: Our management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rules 13a-15(f) and 15d -15(f). Under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, we conducted an evaluation of the effectiveness of our internal control over financial reporting based on the framework in “Internal Control—Integrated Framework” issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on that evaluation our management concluded that our internal control over financial reporting was effective as of December 31, 2012.
We acquired Kenny Construction Company (“Kenny”) effective December 31, 2012. Kenny had total assets that were 15.5% of consolidated assets as of December 31, 2012, and we did not record any revenues for Kenny. As the acquisition occurred during the last twelve months, the scope of our assessment of the effectiveness of internal control over financial reporting does not include Kenny. This exclusion is in accordance with the Securities Exchange Commission’s general guidance that an assessment of a recently acquired business may be omitted from our scope in the year of acquisition.
Independent Registered Public Accounting Firm Report: PricewaterhouseCoopers LLP, the independent registered public accounting firm that audited our consolidated financial statements included in this Annual Report on Form 10-K, has issued a report on the Company’s internal control over financial reporting as of December 31, 2012. The report, which expresses an unqualified opinion on the effectiveness of the Company’s internal control over financial reporting as of December 31, 2012, is included in “Item 15. Exhibits and Financial Statement Schedules” under the heading “Report of Independent Registered Public Accounting Firm.”
Item 9B. OTHER INFORMATION
Not Applicable.

44
 

 
 



Table of Contents

PART III
Certain information required by Part III is omitted from this report. We will file our definitive proxy statement for our Annual Meeting of Shareholders to be held on June 6, 2013 (the “Proxy Statement”) pursuant to Regulation 14A not later than 120 days after the end of the fiscal year covered by this report, and certain information included therein is incorporated herein by reference.
Item 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
For information regarding our Directors and compliance with Section 16(a) of the Securities Exchange Act of 1934, we direct you to the sections entitled “Proposal 1 - Election of Directors” and “Section 16(a) Beneficial Ownership Reporting Compliance,” respectively, in the Proxy Statement. For information regarding our Audit/Compliance Committee and our Audit/Compliance Committee’s financial expert, we direct you to the section entitled “Information