SECURITIES AND EXCHANGE COMMISSION
FORM 10-Q
þ | QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the quarterly period ended June 30, 2004
OR
o | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934 |
Commission file number 1-12284
GOLDEN STAR RESOURCES LTD.
Canada
|
98-0101955 | |
(State or other jurisdiction of incorporation or organization) |
(I.R.S. Employer Identification No.) | |
10901 West Toller Drive, Suite 300 |
||
Littleton, Colorado
|
80127-6312 | |
(Address of principal executive office)
|
(Zip Code) |
(303) 830-9000
(Registrants telephone number, including area code)
Indicate by check mark whether the Registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes x No o
Indicate by check mark whether the registrant is an accelerated filer (as defined in Rule 12b-2 of the Act). Yes x No o
Number of Common Shares outstanding as of July 30, 2004: 141,848,937
INDEX
REPORTING CURRENCY, FINANCIAL AND OTHER INFORMATION
All amounts in this report are expressed in US dollars, unless otherwise indicated. Canadian currency is denoted as Cdn$ and the Euro is denoted as .Financial information is presented in accordance with accounting principles generally accepted in Canada (Cdn GAAP). Differences between accounting principles generally accepted in the US (US GAAP) and those applied in Canada, as applicable to Golden Star Resources Ltd., are explained in Note 18 to the Consolidated Financial Statements.References to Golden Star, we, our, and us mean Golden Star Resources Ltd., its predecessors and consolidated subsidiaries, or any one or more of them, as the context requires.
NON-GAAP FINANCIAL MEASURES
In this Form 10-Q, the terms total cash cost and cash operating cost are used on a per ounce of gold basis. Total cash cost per ounce is equivalent to mining operations expense for the period as found on the Consolidated Statements of Operations, divided by the number of ounces of gold sold during the period. Cash operating cost per ounce is equivalent to mining operations expense for the period less production royalties and production taxes, divided by the number of ounces of gold sold during the period. We have included total cash cost and cash operating cost information to provide investors with information about the cost structure of our mining operations. We use this information for the same purpose and for monitoring the performance of our operations. This information differs from measures of performance determined in accordance with GAAP in Canada and the US and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. These measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP and might not be comparable to similarly titled measures of other companies. See Item 2, Managements Discussion and Analysis of Financial Condition and Results of Operations for a reconciliation of these non-GAAP measures to our Statements of Operations.
STATEMENTS REGARDING FORWARD-LOOKING INFORMATION
This Form 10-Q contains forward-looking statements, within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Exchange Act of 1934, as amended, with respect to our financial condition, results of operations, business prospects, plans, objectives, goals, strategies, future events, capital expenditure, and exploration and development efforts. Words such as anticipates, expects, intends, plans, forecasts, projects, budgets, believes, seeks, estimates, could, might, should, may, will, and similar expressions identify forward-looking statements. Although we believe that our plans, intentions and expectations reflected in these forward-looking statements are reasonable, we cannot be certain that these plans, intentions or expectations will be achieved. Actual results, performance or achievements could
1
differ materially from those contemplated, expressed or implied by the forward-looking statements contained or incorporated by reference in this Form 10-Q. These statements include comments regarding: the establishment and estimates of mineral reserves and mineral resources, production, production commencement dates, production costs, cash operating costs per ounce, total cash costs per ounce, grade, processing capacity, potential mine life, feasibility studies, development costs, capital and operating expenditures, exploration, the closing of certain transactions including acquisitions and offerings, our expansion plans for Bogoso/Prestea, start-up of Wassa and the potential acquisition of IAMGold.
The following, in addition to the factors described in Risk Factors discussed in our Form 10-K for the fiscal year ended December 31, 2003, are among the factors that could cause actual results to differ materially from the forward-looking statements:
| unexpected changes in business and economic conditions; | |||
| significant increases or decreases in gold prices; | |||
| changes in interest rates and currency exchange rates; | |||
| timing and amount of production; | |||
| unanticipated grade changes; | |||
| unanticipated recovery rates or production problems; | |||
| changes in mining, processing and overhead costs; | |||
| changes in metallurgy and processing technology; | |||
| access and availability of materials, equipment, supplies, labor and supervision, power and water; | |||
| determination of mineral reserves and mineral resources; | |||
| availability of drill rigs; | |||
| changes in project parameters; | |||
| costs and timing of development of new mineral reserves; | |||
| results of current and future exploration activities; | |||
| results of pending and future feasibility studies; | |||
| joint venture relationships; | |||
| political or economic instability, either globally or in the countries in which we operate; | |||
| local and community impacts and issues; | |||
| timing of receipt of government approvals; | |||
| accidents and labor disputes; | |||
| environmental costs and risks; | |||
| competitive factors, including competition for property acquisitions; | |||
| lack of IAMGold shareholder support for our proposed transaction; and | |||
| availability of capital at reasonable rates or at all. |
These factors are not intended to represent a complete list of the general or specific factors that could affect us. We might note additional factors elsewhere in this Form 10-Q, and in any documents incorporated by reference into this Form 10-Q. We undertake no obligation to update forward-looking statements.
2
ITEM 1 FINANCIAL STATEMENTS
GOLDEN STAR RESOURCES LTD.
CONSOLIDATED BALANCE SHEETS
(Stated in thousands of US dollars except shares issued and outstanding)
(Unaudited)
As of | As of | |||||||
June 30, | December 31, | |||||||
2004 |
2003 |
|||||||
ASSETS |
||||||||
Current assets: |
||||||||
Cash and cash equivalents |
$ | 85,835 | $ | 89,970 | ||||
Accounts receivable |
2,637 | 790 | ||||||
Inventories (Note 2) |
14,579 | 12,661 | ||||||
Due from sale of property (Note 3) |
1,000 | 1,000 | ||||||
Other current assets |
1,626 | 514 | ||||||
Total current assets |
105,677 | 104,935 | ||||||
Restricted cash (Note 10) |
3,317 | 3,317 | ||||||
Due from sale of property (Note 3) |
| 1,000 | ||||||
Deferred exploration and development costs (Note 4) |
5,917 | 9,108 | ||||||
Property, plant and equipment (Note 5) |
20,895 | 18,202 | ||||||
Mining properties (Note 6) |
64,082 | 56,808 | ||||||
Mine construction-in-progress (Note 7) |
38,141 | 27,376 | ||||||
Other assets (Note 8) |
4,606 | 1,645 | ||||||
Total assets |
$ | 242,635 | $ | 222,391 | ||||
LIABILITIES |
||||||||
Current liabilities: |
||||||||
Accounts payable |
$ | 4,730 | $ | 3,268 | ||||
Construction retention payable |
696 | 1,350 | ||||||
Royalties payable |
436 | 532 | ||||||
Other accrued liabilities |
6,277 | 2,859 | ||||||
Current debt (Note 9) |
860 | 142 | ||||||
Total current liabilities |
12,999 | 8,151 | ||||||
Long term debt (Note 9) |
572 | 657 | ||||||
Asset retirement obligations (Note 10) |
8,022 | 7,745 | ||||||
Total liabilities |
21,593 | 16,553 | ||||||
Minority interest |
6,113 | 7,476 | ||||||
Commitments and contingencies (Note 11) |
||||||||
SHAREHOLDERS EQUITY |
||||||||
Share capital |
||||||||
First preferred shares, without par value, unlimited shares
authorized. No shares issued |
| | ||||||
Common shares, without par value, unlimited shares
authorized. Shares issued and outstanding: 138,655,518 at
June 30, 2004; 132,924,278 at December 31, 2003 (Notes 12 &
13) |
337,836 | 327,578 | ||||||
Deficit |
(122,907 | ) | (129,216 | ) | ||||
Total shareholders equity |
214,929 | 198,362 | ||||||
Total liabilities and shareholders equity |
$ | 242,635 | $ | 222,391 | ||||
The accompanying notes are an integral part of these consolidated financial statements.
3
GOLDEN STAR RESOURCES LTD.
CONSOLIDATED STATEMENTS OF OPERATIONS
(Stated in thousands of US dollars except per share amounts)
(Unaudited)
Three months ended | Six months ended | |||||||||||||||
June 30 |
June 30 |
|||||||||||||||
2003 | 2003 | |||||||||||||||
Restated | Restated | |||||||||||||||
2004 |
(Note 13) |
2004 |
(Note 13) |
|||||||||||||
REVENUE |
||||||||||||||||
Gold sales |
$ | 15,515 | $ | 12,508 | $ | 34,780 | $ | 27,525 | ||||||||
Interest and other (Note 3) |
979 | 185 | 1,571 | 309 | ||||||||||||
Total revenues |
16,494 | 12,693 | 36,351 | 27,834 | ||||||||||||
EXPENSES |
||||||||||||||||
Mining operations |
10,190 | 7,844 | 19,315 | 16,344 | ||||||||||||
Depreciation, depletion and amortization |
1,945 | 1,159 | 4,223 | 2,053 | ||||||||||||
Accretion of asset retirement obligation |
163 | 91 | 322 | 199 | ||||||||||||
Exploration expense |
221 | 165 | 455 | 233 | ||||||||||||
General and administrative expense |
2,196 | 1,293 | 4,052 | 2,543 | ||||||||||||
Interest expense |
6 | 3 | 12 | 27 | ||||||||||||
Foreign exchange (gain)/loss |
343 | (283 | ) | 626 | (561 | ) | ||||||||||
Total expenses |
15,064 | 10,272 | 29,005 | 20,838 | ||||||||||||
Income before the undernoted |
1,430 | 2,421 | 7,346 | 6,996 | ||||||||||||
Gain on sale of marketable securities |
| 1,905 | | 1,905 | ||||||||||||
Income before minority interest |
1,430 | 4,326 | 7,346 | 8,901 | ||||||||||||
Minority interest |
(315 | ) | (333 | ) | (1,037 | ) | (924 | ) | ||||||||
Net income before income tax |
1,115 | 3,993 | 6,309 | 7,977 | ||||||||||||
Income tax (Note 15) |
| | | | ||||||||||||
NET INCOME |
$ | 1,115 | $ | 3,993 | $ | 6,309 | $ | 7,977 | ||||||||
Deficit, beginning of period |
(124,022 | ) | (147,188 | ) | (129,216 | ) | (151,655 | ) | ||||||||
Cumulative effect of change in accounting method |
| | | 483 | ||||||||||||
Adjusted deficit, beginning of period |
(124,022 | ) | (147,188 | ) | (129,216 | ) | (151,172 | ) | ||||||||
Deficit, end of period |
$ | (122,907 | ) | $ | (143,195 | ) | $ | (122,907 | ) | $ | (143,195 | ) | ||||
Net income per common share basic (Note 16) |
$ | 0.008 | $ | 0.037 | $ | 0.047 | $ | 0.078 | ||||||||
Net income per common share diluted (Note 16) |
$ | 0.008 | $ | 0.035 | $ | 0.044 | $ | 0.073 | ||||||||
Weighted average shares outstanding (millions of
shares) |
136.7 | 107.6 | 134.9 | 102.3 | ||||||||||||
The accompanying notes are an integral part of these consolidated financial statements.
4
GOLDEN STAR RESOURCES LTD.
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Stated in thousands of US dollars)
(Unaudited)
Three months ended | Six months ended | |||||||||||||||
June 30 |
June 30 |
|||||||||||||||
2003 | 2003 | |||||||||||||||
Restated | Restated | |||||||||||||||
2004 |
(Note 13) |
2004 |
(Note 13) |
|||||||||||||
OPERATING ACTIVITIES: |
||||||||||||||||
Net income |
$ | 1,115 | $ | 3,993 | $ | 6,309 | $ | 7,977 | ||||||||
Reconciliation of net income
to net cash provided by
operating activities: |
||||||||||||||||
Depreciation, depletion
and amortization |
1,945 | 1,159 | 4,223 | 2,053 | ||||||||||||
Stock-based compensation |
872 | 182 | 1,009 | 698 | ||||||||||||
Reclamation expenditures |
(301 | ) | (220 | ) | (468 | ) | (390 | ) | ||||||||
Accretion of asset
retirement obligation |
163 | 91 | 322 | 199 | ||||||||||||
Minority interest |
315 | 333 | 1,037 | 924 | ||||||||||||
4,109 | 5,538 | 12,432 | 11,461 | |||||||||||||
Changes in assets and
liabilities: |
||||||||||||||||
Accounts receivable |
(2,259 | ) | 1,049 | (3,136 | ) | 1,320 | ||||||||||
Inventories |
(352 | ) | (1,174 | ) | (1,918 | ) | (1,649 | ) | ||||||||
Accounts payable and
accrued liabilities |
3,600 | (698 | ) | 4,130 | (1,605 | ) | ||||||||||
Marketable securities |
| 906 | | 906 | ||||||||||||
Other |
577 | (2 | ) | 173 | 29 | |||||||||||
Net cash
provided by
operating
activities |
5,675 | 5,619 | 11,681 | 10,462 | ||||||||||||
INVESTING ACTIVITIES: |
||||||||||||||||
Expenditures on
deferred exploration
and development |
(2,067 | ) | (533 | ) | (3,691 | ) | (3,097 | ) | ||||||||
Expenditures on mining
properties |
(3,745 | ) | (12,623 | ) | (6,270 | ) | (15,383 | ) | ||||||||
Expenditures on
property, plant and
equipment |
(2,431 | ) | (944 | ) | (3,437 | ) | (2,542 | ) | ||||||||
Expenditures on mine
construction-in-progress |
(4,729 | ) | | (10,341 | ) | | ||||||||||
Sale of property |
| | 1,000 | 1,000 | ||||||||||||
Other |
(2,322 | ) | (75 | ) | (2,959 | ) | (82 | ) | ||||||||
Net cash used in
investing
activities |
(15,294 | ) | (14,175 | ) | (25,698 | ) | (20,104 | ) | ||||||||
FINANCING ACTIVITIES: |
||||||||||||||||
Issuance of share
capital, net of issue
costs (Note 12) |
8,555 | 299 | 9,250 | 33,796 | ||||||||||||
Debt repayment (Note 9) |
(34 | ) | (331 | ) | (81 | ) | (3,004 | ) | ||||||||
Other |
916 | 20 | 713 | 40 | ||||||||||||
Net cash
provided
by/(used in)
financing
activities |
9,437 | (12 | ) | 9,882 | 30,832 | |||||||||||
Increase/(decrease) in cash
and cash equivalents |
(182 | ) | (8,568 | ) | (4,135 | ) | 21,190 | |||||||||
Cash and cash equivalents,
beginning of period |
86,017 | 49,774 | 89,970 | 20,016 | ||||||||||||
Cash and cash
equivalents end
of period |
$ | 85,835 | $ | 41,206 | $ | 85,835 | $ | 41,206 | ||||||||
See Note 17 for supplemental cash flow information
The accompanying notes are an integral part of these consolidated financial statements.
5
GOLDEN STAR RESOURCES LTD.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(All tabular amounts in thousands of US dollars unless noted otherwise)
(Unaudited)
These consolidated financial statements and the accompanying notes are unaudited and should be read in conjunction with the audited consolidated financial statements and related notes thereto included in our annual report on Form 10-K for the year ended December 31, 2003, on file with the Securities and Exchange Commission and with the Canadian securities commissions (referred to as the 2003 Form 10-K). Financial information is presented in accordance with accounting principles generally accepted in Canada.
The unaudited consolidated financial statements for the three and six months ended June 30, 2004 and June 30, 2003 contained herein reflect all adjustments, consisting solely of normal recurring items, which are necessary for a fair presentation of financial position, results of operations and cash flows on a basis consistent with that of our prior audited consolidated financial statements.
Prior period amounts have been restated to reflect the impact of the adoption in December 2003 of the Canadian Institute of Chartered Accountants amended Handbook Section 3870, Stock-based Compensation and other Stock-based Payments. Information presented for prior periods in 2003 have been restated to reflect the adoption of Section 3870 amendments as of January 1, 2003.
1. Description of Business
We are a Canadian international gold mining and exploration company focused primarily on mining, mine development and exploration in Ghana, West Africa. Through our subsidiaries and joint ventures we own a controlling interest in four gold properties in Ghana; the Bogoso property (Bogoso), the Prestea property (Prestea), the Wassa property (Wassa) and the currently inactive Prestea underground property (Prestea Underground). Bogoso and Prestea are adjoining properties and both are owned by our 90% owned subsidiary Bogoso Gold Limited (BGL). These two properties now function as a single operation referred to as Bogoso/Prestea. BGL holds a 90% managing interest in the Prestea Underground.
We operate the Bogoso/Prestea mine, with ore mined at the Prestea property being processed at the Bogoso processing plant. To date, Bogoso/Prestea has produced all of our gold since we became a gold producer upon our purchase of the Bogoso mine in late 1999. We commenced development of the Wassa mine in mid-2003.
We hold interests in exploration joint ventures, managed by our joint venture partners, in Mali and Sierra Leone in West Africa. We also hold active exploration properties in Ghana and in Suriname and, through our 53%-owned subsidiary, Guyanor Ressources S.A. (Guyanor), we hold interests in gold exploration properties in French Guiana. And through our affiliate Goldmin Holdings, we hold interests in gold exploration properties in Peru and Chile.
We are a reporting issuer or the equivalent in all provinces and territories of Canada and the United States and file continuous disclosure documents with the Canadian securities regulatory authorities and the United States Securities and Exchange Commission.
2. Inventories
As of | As of | |||||||
June 30, | December 31, | |||||||
2004 |
2003 |
|||||||
Stockpiled ore |
$ | 5,009 | $ | 4,167 | ||||
In-process |
1,742 | 2,821 | ||||||
Materials and supplies |
7,828 | 5,673 | ||||||
Total inventories |
$ | 14,579 | $ | 12,661 | ||||
3. Guiana Shield Transaction
In late 2001 we sold our Gross Rosebel exploration property in South America to Cambior Inc. (Cambior). In addition to a $5.0 million payment received at closing in 2002, terms of the sale agreement provided that Cambior would make three deferred payments of $1.0 million each plus royalty payments on the first seven million ounces of gold production. The first and second
6
deferred payments were received in the first quarters of 2003 and 2004 respectively. The third and final deferred payment is expected in the first quarter of 2005. Gold production began at Gross Rosebel in the first quarter of 2004 which triggered the quarterly production royalty due to us from the property. Royalty revenue of approximately $1.0 million was recorded in the first six months of 2004 of which $0.3 million has been received.
4. Deferred Exploration and Development Costs
Deferred | Deferred | |||||||||||||||||||
Exploration & | Exploration & | |||||||||||||||||||
Development | Capitalized | Transferred | Development | |||||||||||||||||
Costs | Exploration | to Mine | Costs | |||||||||||||||||
as of 12/31/03 |
Expenditures |
Acquisitions |
Property |
as of 6/30/04 |
||||||||||||||||
GHANA: |
||||||||||||||||||||
Obuom |
$ | 278 | $ | 2 | $ | | $ | | $ | 280 | ||||||||||
Bogoso Sulfide Project |
5,930 | | | (5,930 | ) | | ||||||||||||||
Akropong Trend & Other
Ghana |
1,759 | 1,159 | | | 2,918 | |||||||||||||||
Prestea Property Projects |
| 1,136 | | | 1,136 | |||||||||||||||
Beta Boundary |
814 | | | (814 | ) | | ||||||||||||||
MALI: |
||||||||||||||||||||
Mininko |
130 | 678 | | | 808 | |||||||||||||||
SIERRA LEONE |
||||||||||||||||||||
Mano River |
| 198 | | | 198 | |||||||||||||||
FRENCH GUIANA: |
||||||||||||||||||||
Bon Espoir |
| | 132 | | 132 | |||||||||||||||
Other |
| | 76 | | 76 | |||||||||||||||
SURINAME: |
||||||||||||||||||||
Saramacca |
197 | 172 | | | 369 | |||||||||||||||
TOTAL |
$ | 9,108 | $ | 3,345 | $ | 208 | $ | (6,744 | ) | $ | 5,917 | |||||||||
The Bogoso Sulfide project, and the Beta Boundary property which will feed the Bondaye Plant, were deemed sufficiently advanced by the end of 2003 to be reclassified in early 2004 as Mining Properties rather than as exploration properties. Reclassification was based upon definitive proven and probable reserves at both projects, completion of a feasibility study for the Bogoso Sulfide project showing it to be economically viable, board approval to proceed with the Bondaye/Beta Boundary project and initiation of detailed engineering and development in 2004.
5. Property, Plant and Equipment
As of June 30, 2004 |
As of December 31, 2003 |
|||||||||||||||||||||||
Property, Plant | Property, Plant | |||||||||||||||||||||||
Property, Plant | and | Property, Plant | and | |||||||||||||||||||||
and | Equipment | and | Equipment | |||||||||||||||||||||
Equipment at | Accumulated | Net Book | Equipment at | Accumulated | Net Book | |||||||||||||||||||
Cost |
Depreciation |
Value |
Cost |
Depreciation |
Value |
|||||||||||||||||||
Bogoso/Prestea |
$ | 19,860 | $ | 4,854 | $ | 15,006 | $ | 15,765 | $ | 4,143 | $ | 11,622 | ||||||||||||
Prestea Underground |
238 | | 238 | 227 | | 227 | ||||||||||||||||||
Guyanor |
1,969 | 1,940 | 29 | 1,985 | 1,952 | 33 | ||||||||||||||||||
Wassa |
5,460 | | 5,460 | 6,259 | | 6,259 | ||||||||||||||||||
Corporate & Other |
929 | 767 | 162 | 782 | 721 | 61 | ||||||||||||||||||
Total |
$ | 28,456 | $ | 7,561 | $ | 20,895 | $ | 25,018 | $ | 6,816 | $ | 18,202 | ||||||||||||
7
6. Mining Properties
As of June 30, 2004 |
As of December 31, 2003 |
|||||||||||||||||||||||
Mine Property | Accumulated | Mine Property, Net | Mine Property | Accumulated | Mine Property, Net | |||||||||||||||||||
at Cost |
Amortization |
Book Value |
at Cost |
Amortization |
Book Value |
|||||||||||||||||||
Bogoso/Prestea |
$ | 40,993 | $ | 20,333 | $ | 20,660 | $ | 41,885 | $ | 16,856 | $ | 25,029 | ||||||||||||
Prestea Underground |
8,561 | | 8,561 | 8,560 | | 8,560 | ||||||||||||||||||
Wassa |
9,653 | | 9,653 | 9,778 | | 9,778 | ||||||||||||||||||
Bogoso Sulfide |
10,411 | | 10,411 | | | | ||||||||||||||||||
Mampon |
13,447 | | 13,447 | 13,441 | | 13,441 | ||||||||||||||||||
Beta Boundary |
1,350 | | 1,350 | | | | ||||||||||||||||||
Total |
$ | 84,415 | $ | 20,333 | $ | 64,082 | $ | 73,664 | $ | 16,856 | $ | 56,808 | ||||||||||||
During the quarter ended June 30, 2004 due to financial difficulties experienced by our joint venture partner, the portion of the Prestea Underground owned by our joint venture partner reverted to our ownership per terms of the original joint venture agreement. As a result, a $2.4 million minority position originally recorded when the partnership was organized was reversed and a $2.4 million reduction was recorded in the carrying value of the Prestea Underground Mining Property assets.
The Bogoso Sulfide project, and the Beta Boundary property which will feed the Bondaye Plant, were deemed sufficiently advanced by early 2004 for reclassification as Mining Properties rather than as exploration properties. Reclassification was based upon definitive proven and probable reserves at both projects, completion of a feasibility study for the Bogoso Sulfide project showing it to be economically viable, board approval to proceed with the Bondaye/Beta Boundary project and initiation of detailed engineering and development in 2004. The Mining Property costs associated with these two projects will be amortized over production ounces when gold production begins.
7. Mine Construction-in-Progress
Mine construction in progress represents costs incurred at the Wassa project subsequent to acquisition. The balance includes exploration drilling, feasibility study costs, equipment purchases and construction costs, including progress payments to the construction contractor and development costs.
8. Other Assets
Other assets include $1.9 million of direct, incremental acquisition costs resulting from our tender offer for IAMGold Corporation (IAMGold) common shares. The majority of these costs are for financial advisory, legal and accounting services. If the tender offer fails to acquire a controlling interest in IAMGold, this amount plus any additional future costs incurred in the endeavor would be expensed.
9. Debt
As of | As of | |||||||
June 30, | December 31, | |||||||
2004 |
2003 |
|||||||
Current debt: |
||||||||
Line of Credit BGL (Note a) |
$ | 714 | $ | | ||||
Equipment financing loans Wassa (Note b) |
146 | 142 | ||||||
Total current debt |
$ | 860 | $ | 142 | ||||
Long term debt: |
||||||||
Equipment financing loans Wassa (Note b) |
$ | 572 | $ | 657 | ||||
Total long term debt |
$ | 572 | $ | 657 | ||||
(a) Revolving facility from Barclays Bank (Ghana) in the amount of $1.0 million.
(b) Caterpillar Financial Services Corporation A $0.8 million installment loan was used to purchase mobile equipment at Wassa and is repayable in 60 equal monthly installments beginning January 2004 with an interest rate of 6.25%.
8
(c) In June 2004 an equipment financing credit facility was established between Caterpillar Financial Services Corporation and the subsidiaries of Golden Star Resources with Golden Star the guarantor of all amounts borrowed. The loan provides up to a maximum of $25 million of credit for a mixture of new and used mining equipment. The facility expires on April 30, 2005, bears an interest at a rate equal to the Five Year US$ Swap Rate plus 2.28%, is repayable over five years for new equipment and over two years for used equipment and requires monthly payments. As of June 30, 2004 the amount drawn on this line of credit was nil.
10. Asset Retirement Obligations
Our Asset Retirement Obligations (ARO) are estimated to be the present value of the ultimate closure cost associated with reclamation, demolition and stabilization of our Bogoso/Prestea and Wassa mining properties. Included in this liability are the costs of mine closure and reclamation, processing plant and infrastructure demolition, tailings pond stabilization and reclamation and environmental monitoring costs.
The changes in the carrying amount of the ARO during the first six months of 2004 are:
Six months ended | ||||
June 30, 2004 |
||||
Balance at December 31, 2003 |
$ | 7,745 | ||
Accretion expense |
322 | |||
Reclamation work performed |
(468 | ) | ||
New AROs incurred during the period |
423 | |||
Balance at June 30, 2004 |
$ | 8,022 | ||
11. Commitments and Contingencies
(a) Environmental Regulations and Asset Retirement Obligations We are not aware of any events of material non-compliance with environmental laws and regulations in our operations which could have a material adverse effect on our operations or financial condition. The exact nature of environmental control problems, if any, which we may encounter in the future cannot be predicted, primarily because of the changing character of environmental regulations that may be enacted. Asset retirement obligations, which include environmental rehabilitation liabilities for reclamation and for closure costs, were $5.4 million at Bogoso/Prestea at June 30, 2004, up from $5.2 million at December 31, 2003. Asset retirement obligations at Wassa totaled $2.6 million at June 30, 2004, up from $2.5 million at December 31, 2003.
(b) Cash Restricted for Environmental Rehabilitation Liabilities In 1999, we were required, according to the acquisition agreement with the sellers of BGL, to restrict $6.0 million of cash to be used for the ongoing and final reclamation and closure costs at Bogoso. The withdrawal of these funds for our use must be agreed to by the sellers, who are ultimately responsible for the reclamation in the event of our non-performance. In the past the sellers have agreed to allow disbursement of portions of the restricted cash to us equal to the cash costs we have incurred for work performed, but there have been no agreements for disbursements since 2001. We are seeking to obtain an amendment to the agreement that would remove the restriction and in its place establish a reclamation bond to meet Ghanas Environmental Protection Agencys reclamation bonding requirements. At June 30, 2004, approximately $3.3 million of restricted cash was held as a cash provision against future reclamation commitments at Bogoso.
(c) Royalties
i. | Dunkwa Properties: In August 2003 we agreed to pay Birim Goldfields Inc. a net smelter return royalty on future gold production from the Mansiso and Asikuma properties (the Dunkwa Properties), excluding any royalty on the first 200,000 ounces produced from Mampon which is located on the Asikuma property. The amount of the royalty is based on a sliding scale which ranges from a 2% net smelter return at gold prices at or below $300 per ounce up to 3.5% for gold prices in excess of $400 per ounce. | |||
i. | ii. Government of Ghana: Under the laws of Ghana, a holder of a mining lease is required to pay an annual royalty of not less than 3% and not more than 12% of the total revenues earned from the lease area. The royalty is payable on a quarterly basis. We currently pay a 3% royalty on all gold production from Bogoso/Prestea and expect to pay a royalty at the same rate on Wassa production. The Government of Ghana retains the right to increase the amount of the royalty to as much as 12% based upon a formula related to a companys operating margin. |
9
(d) Wassa Construction Contract In July 2003 we entered into a contract with Metallurgical Design and Management (Pty) Ltd. (MDM), a South African company, for the construction of the CIL processing plant facility and other associated processing facilities at Wassa. The total contract amount is set at $15.9 million of which $13.8 million had been disbursed at June 30, 2004.
(e) Mano River Joint Venture In late 2003 we entered into a joint venture to invest up to $6 million over the next four years in the Mano River project in Sierra Leone via an earn-in agreement with a junior exploration company which now holds a group of gold exploration properties in Sierra Leone. The initial $6 million, if fully funded (we can terminate the agreement after spending $1.0 million) would yield a 51% interest in the joint venture. Further provisions of the joint venture agreement provide the opportunity to acquire up to 85% of the joint venture by continued long term funding. The joint venture agreement is subject to completion of documentation. Our spending during the first six months of 2004 totaled $0.2 million.
(f) Mininko Joint Venture In late 2003 we entered into a joint venture agreeing to fund exploration work on the Mininko gold property in Mali. Funding of $2.6 million would earn a 51% interest in the joint venture. We can terminate the joint venture at any time after spending $0.4 million. We have spent a total of $0.8 million as of June 30, 2004. The joint venture agreement provides that we can earn up to an 82.5% interest by continued funding of exploration and development, if warranted.
12. Share Capital
Changes in share capital during the six months ended June 30, 2004:
Shares |
Amount |
|||||||
Beginning balance as of December 31, 2003 |
132,924,278 | $ | 327,578 | |||||
Common shares issued: |
||||||||
Option exercises |
632,850 | 1,008 | ||||||
Warrant exercises |
5,098,390 | 8,548 | ||||||
Other |
| 702 | ||||||
Ending balance as of June 30, 2004 |
138,655,518 | $ | 337,836 | |||||
13. Stock Based Compensation
(a) Stock Options We have one stock option plan, the Amended and Restated 1997 Stock Option Plan (the GSR Plan). Options are granted under this plan from time to time at the discretion of the Board of Directors. Options granted are non-assignable and are exercisable for a period of ten years or such other period as stipulated in a stock option agreement between Golden Star and an optionee. Under the GSR Plan we may grant options to employees, consultants and directors of the Company or its subsidiaries for up to 15,000,000 shares of common stock. Options take the form of non-qualified stock options, and the exercise price of each option is not less than the market price of our stock on the date of grant. Options typically vest over periods ranging from immediately, to four years from the date of grant. Vesting periods are determined at the discretion of the Board of Directors.
In 2003 the Canadian Institute of Chartered Accountants amended CICA Handbook Section 3870, Stock-based Compensation and other Stock-based Payments to require expensing of all stock based compensation awards for fiscal years beginning on or after January 1, 2004. In light of this development we adopted the new provision of CICA 3870 at the end of 2003 and recognized approximately $1.1 million of option expense in 2003 as if CICA 3870 had been in effect since the beginning of 2003.
Data presented in this Form 10-Q related to the quarter and the six months ended June 30, 2003 has been revised to reflect compensation expensed that would have been reported had the provisions of CICA 3870 been in place at the beginning of 2003.
No new options were granted during the first quarter of 2004. A total 855,000 options were granted in the second quarter of 2004. Certain of these options vested immediately and others vest 1/4th immediately, and 1/4th on each of the next three anniversary dates. In the three and six months ended June 30, 2004, we recognized approximately $0.1 million and $0.3 million respectively of stock option expense related to options granted during 2003, and we recognized $0.7 million of compensation expense in the second quarter of 2004 for options granted in the second quarter of 2004.
10
Weighted- | ||||||||
Average Exercise | ||||||||
Options |
Price (Cdn$) |
|||||||
Outstanding as of December 31, 2003 |
5,241,322 | $ | 2.41 | |||||
Granted |
855,000 | 6.95 | ||||||
Exercised |
(632,850 | ) | 2.06 | |||||
Forfeited |
(14,668 | ) | 3.14 | |||||
Outstanding as of June 30, 2004 |
5,448,804 | $ | 3.16 | |||||
The fair value of options granted during the second quarter of 2004 was estimated at the grant dates using a Black-Scholes option-pricing model with the following assumptions:
Three months ended June 30, |
Six months ended June 30, |
|||||||||||||||
2004 |
2003 |
2004 |
2003 |
|||||||||||||
Expected volatility
|
36.4% to 36.5% | 34 | % | 36.4% to 36.5% | 34 | % | ||||||||||
Risk-free interest rate
|
3.7% to 4.1% | 3.0% to 4.5% | 3.7% to 4.1% | 3.0% to 4.5% | ||||||||||||
Expected lives
|
3.5 to 5 years | 3.5 to 5 years | 3.5 to 5 years | 3.5 to 5 years | ||||||||||||
Dividend yield
|
0 | % | 0 | % | 0 | % | 0 | % |
The expense of options issued prior to 2003 is not recognized in reported net income. Had compensation costs been recognized for options granted prior to 2003 and vesting in 2004, our net income and earnings per share would have been reduced to the pro forma amounts shown below:
Three months ended June 30, |
Six months ended June 30, |
|||||||||||||||
2004 |
2003 |
2004 |
2003 |
|||||||||||||
Net income as reported |
$ | 1,115 | $ | 3,993 | $ | 6,309 | $ | 7,977 | ||||||||
Unrecognized amortization of fair value of
options vesting |
1 | 238 | 12 | 1,030 | ||||||||||||
Net income pro forma |
$ | 1,114 | $ | 3,755 | $ | 6,297 | $ | 6,947 | ||||||||
Basic earnings per share as reported |
$ | 0.008 | $ | 0.037 | $ | 0.047 | $ | 0.078 | ||||||||
- pro forma |
$ | 0.008 | $ | 0.035 | $ | 0.047 | $ | 0.068 | ||||||||
Diluted earnings per share as reported |
$ | 0.008 | $ | 0.035 | $ | 0.044 | $ | 0.073 | ||||||||
- pro forma |
$ | 0.008 | $ | 0.033 | $ | 0.044 | $ | 0.064 | ||||||||
(b) Stock Bonus Plan In December 1992, we established an Employees Stock Bonus Plan (the Bonus Plan) for any full-time or part-time employee (whether or not a director) of the Company or any of our subsidiaries who has rendered meritorious services which contributed to the success of the Company or any of its subsidiaries. The Compensation Committee grants bonus common shares under the Bonus Plan on terms that it determines, within the limitations of the Bonus Plan and subject to the rules of applicable regulatory authorities. The Bonus Plan, as amended, provided for the issuance of 900,000 common shares of bonus stock of which 445,820 common shares have been issued as of June 30, 2004.
During the three months ended June 30, 2004 and 2003 there were no common shares issued to employees pursuant to the Bonus Plan. During the six months ended June 30, 2004 and 2003 a total of nil and 57,200 common shares, respectively, were issued to employees pursuant to the Bonus Plan. We recognized nil compensation expense related to bonuses under the Bonus Plan during each of the three months ended June 30, 2004 and 2003. We recognized compensation expense related to bonuses under the Bonus Plan during the six months ended June 30, 2004 and 2003 of nil and $0.1 million, respectively.
11
14. Operations by Geographic Area
The following geographic data includes revenues based on product shipment origin and long-lived assets based on physical location:
Three months ended June 30, 2004 |
Six months ended June 30, 2004 |
|||||||||||||||||||||||
Net Income | Identifiable | Net Income | Identifiable | |||||||||||||||||||||
Revenues |
(Loss) |
Assets |
Revenues |
(Loss) |
Assets |
|||||||||||||||||||
Africa |
$ | 15,517 | $ | 2,970 | $ | 150,149 | $ | 34,793 | $ | 9,893 | $ | 150,149 | ||||||||||||
South America |
22 | (348 | ) | 653 | 51 | (715 | ) | 653 | ||||||||||||||||
North America Corporate Office |
955 | (1,507 | ) | 91,833 | 1,507 | (2,869 | ) | 91,833 | ||||||||||||||||
Total |
$ | 16,494 | $ | 1,115 | $ | 242,635 | $ | 36,351 | $ | 6,309 | $ | 242,635 | ||||||||||||
Three months ended June 30, 2003 |
Six months ended June 30, 2003 |
|||||||||||||||||||||||
Net Income | Identifiable | Net Income | Identifiable | |||||||||||||||||||||
Revenues |
(Loss) |
Assets |
Revenues |
(Loss) |
Assets |
|||||||||||||||||||
Africa |
$ | 12,546 | $ | 3,122 | $ | 71,939 | $ | 27,581 | $ | 8,097 | $ | 71,939 | ||||||||||||
South America |
11 | (140 | ) | 287 | 22 | (453 | ) | 287 | ||||||||||||||||
North America Corporate Office |
136 | 1,011 | 44,242 | 231 | 333 | 44,242 | ||||||||||||||||||
Total |
$ | 12,693 | $ | 3,993 | $ | 116,468 | $ | 27,834 | $ | 7,977 | $ | 116,468 | ||||||||||||
15. Income Tax
For the six months ended June 30, 2004 BGL generated approximately $6.3 million of pre-tax net income. BGL has tax loss carry-forwards not previously recognized in amounts sufficient to fully offset income taxes on the pre-tax net income. Accordingly, no tax provision has been recorded in the period ended June 30, 2004.
16. Earnings per Common Share
The following table provides reconciliation between basic and diluted earnings per common share:
Three months ended June 30, |
Six months ended June 30, |
|||||||||||||||
2004 |
2003 |
2004 |
2003 |
|||||||||||||
Net income |
$ | 1,115 | $ | 3,993 | $ | 6,309 | $ | 7,977 | ||||||||
Weighted average number of common shares (millions) |
136.7 | 107.6 | 134.9 | 102.3 | ||||||||||||
Dilutive securities: |
||||||||||||||||
Options |
3.1 | 2.2 | 3.2 | 2.1 | ||||||||||||
Warrants |
5.6 | 5.2 | 6.1 | 4.6 | ||||||||||||
Weighted average number of diluted shares |
145.4 | 115.0 | 144.2 | 109.0 | ||||||||||||
Basic earnings per share |
$ | 0.008 | $ | 0.037 | $ | 0.047 | $ | 0.078 | ||||||||
Diluted earnings per share |
$ | 0.008 | $ | 0.035 | $ | 0.044 | $ | 0.073 | ||||||||
Earnings per share on a US GAAP basis are found in Note 18 below.
12
17. Supplemental Cash Flow Information
The following is a summary of non-cash transactions:
Three months ended June 30, |
Six months ended June 30, |
|||||||||||||||
2004 |
2003 |
2004 |
2003 |
|||||||||||||
Acquisition of minority interest in Prestea Underground: |
||||||||||||||||
Minority Interest |
$ | 2,400 | $ | | $ | 2,400 | $ | | ||||||||
Mining property |
(2,400 | ) | | (2,400 | ) | | ||||||||||
Other cash flow information: |
||||||||||||||||
Interest paid |
$ | 7 | $ | 14 | $ | 7 | $ | 36 | ||||||||
18. Generally Accepted Accounting Principles in Canada and the United States
The following Golden Star consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the United States.
(a) Balance Sheets under US GAAP
As of | As of | |||||||
June 30, | December 31, | |||||||
2004 |
2003 |
|||||||
ASSETS |
||||||||
Current assets: |
||||||||
Cash and cash equivalents |
$ | 85,835 | $ | 89,970 | ||||
Accounts receivable |
2,637 | 790 | ||||||
Inventories |
14,579 | 12,661 | ||||||
Due from sale of property |
1,000 | 1,000 | ||||||
Other current assets |
1,626 | 514 | ||||||
Total current assets |
105,677 | 104,935 | ||||||
Restricted cash |
3,317 | 3,317 | ||||||
Due from sale of property |
| 1,000 | ||||||
Acquisition, deferred exploration and development costs (note d1) |
| | ||||||
Property, plant and equipment, net |
20,895 | 18,202 | ||||||
Mining properties, net (note d2) |
47,009 | 46,478 | ||||||
Mine construction-in-progress |
36,412 | 25,647 | ||||||
Other assets (note d1) |
3,117 | 758 | ||||||
Total assets |
$ | 216,427 | $ | 200,337 | ||||
LIABILITIES |
||||||||
Current liabilities |
$ | 12,999 | $ | 8,151 | ||||
Long term debt |
572 | 657 | ||||||
Asset retirement obligations |
8,022 | 7,745 | ||||||
Total liabilities |
21,593 | 16,553 | ||||||
Minority interest (notes d1 and d2) |
3,704 | 3,367 | ||||||
SHAREHOLDERS EQUITY |
||||||||
Share capital |
334,866 | 324,609 | ||||||
Accumulated comprehensive income |
1,316 | 1,316 | ||||||
Deficit |
(145,052 | ) | (145,508 | ) | ||||
Total shareholders equity |
191,130 | 180,417 | ||||||
Total liabilities and shareholders equity |
$ | 216,427 | $ | 200,337 | ||||
13
(b) Statements of Operations under US GAAP
Three months ended June 30, |
Six months ended June 30, |
|||||||||||||||
2004 |
2003 |
2004 |
2003 |
|||||||||||||
Net income under Cdn GAAP |
$ | 1,115 | $ | 3,993 | $ | 6,309 | $ | 7,977 | ||||||||
Acquisition and deferred exploration expenditures expensed per US GAAP (note d1) |
(2,067 | ) | (532 | ) | (4,152 | ) | (3,096 | ) | ||||||||
Capitalized mine property acquisition costs expensed for US GAAP (note d2) |
(1,327 | ) | (527 | ) | (2,401 | ) | (2,449 | ) | ||||||||
Net income/(loss) under US GAAP before minority interest |
(2,279 | ) | 2,934 | (244 | ) | 2,432 | ||||||||||
Minority interest, as adjusted (note d1 and d2) |
(661 | ) | 291 | 700 | 610 | |||||||||||
Net income/(loss) under US GAAP before cumulative effect of change in accounting method |
(2,940 | ) | 3,225 | 456 | 3,042 | |||||||||||
Cumulative effect of change in accounting method (note d3) |
| | | 483 | ||||||||||||
Net income/(loss) under US GAAP |
(2,940 | ) | 3,225 | 456 | 3,525 | |||||||||||
Other comprehensive income gain on marketable securities (note d4) |
| (1,027 | ) | | ||||||||||||
Comprehensive income/(loss) |
$ | (2,940 | ) | $ | 2,198 | $ | 456 | $ | 3,525 | |||||||
Basic net income/(loss) per share under US GAAP before cumulative effect of change in accounting method |
$ | (0.022 | ) | $ | 0.030 | $ | 0.003 | $ | 0.030 | |||||||
Cumulative effect of change in accounting method |
$ | | $ | | $ | | $ | 0.005 | ||||||||
Basic net income/(loss) per share under US GAAP after cumulative effect of change in accounting method |
$ | (0.022 | ) | $ | 0.030 | $ | 0.003 | $ | 0.034 | |||||||
Diluted net income/(loss) per share under US GAAP after cumulative effect of change in accounting method |
NA | $ | 0.028 | $ | 0.003 | $ | 0.032 | |||||||||
(c) Statements of Cash Flows under US GAAP
Three months ended June 30, |
Six months ended June 30, |
|||||||||||||||
2004 |
2003 |
2004 |
2003 |
|||||||||||||
Cash provided by/(used in): |
||||||||||||||||
Operating activities |
$ | 2,284 | $ | 3,837 | $ | 5,129 | $ | 5,684 | ||||||||
Investing activities |
(11,903 | ) | (12,393 | ) | (19,146 | ) | (15,326 | ) | ||||||||
Financing activities |
9,437 | (12 | ) | 9,882 | 30,832 | |||||||||||
Increase/(decrease) in cash and cash equivalents for the period |
(182 | ) | (8,568 | ) | (4,135 | ) | 21,190 | |||||||||
Cash and cash equivalents beginning of the period |
86,017 | 49,774 | 89,970 | 20,016 | ||||||||||||
Cash and cash equivalents end of the period |
$ | 85,835 | $ | 41,206 | $ | 85,835 | $ | 41,206 | ||||||||
(d) Footnotes
(1) Under US GAAP, exploration, acquisition and general and administrative costs related to exploration projects are charged to expense as incurred. Under Cdn GAAP, exploration, acquisition and exploration group general and administrative costs are capitalized. In each subsequent period, the exploration, engineering, financial and market information for each exploration project is reviewed by management to determine if any of the capitalized costs are impaired.
(2) Under US GAAP, the initial purchase cost of mining properties is capitalized. Pre-acquisition costs and subsequent development costs incurred, until such time as a feasibility study had been completed, are expensed in the period incurred. Under Cdn GAAP, all costs of new mine properties as well as costs incurred after acquisition are capitalized, and subsequently reviewed each period for impairment.
(3) Asset retirement obligations: Under US GAAP, the cumulative effect of applying Statement of Financial Accounting Standard No. 143 Accounting for Asset Retirement Obligations was included in net income in 2003. In Cdn GAAP, under the
14
Canadian Institute of Chartered Accountants Section 3110 Asset Retirement Obligations, the cumulative effect of the initial application of this new standard in 2003 was recorded as an adjustment to the beginning deficit account.
(4) Under US GAAP, marketable securities available for sale are marked to market and gains or losses are recognized in Other Comprehensive Income until the securities are sold. Under Cdn GAAP, marketable securities are accounted for at the lower of cost or market.
ITEM 2. MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following discussion and analysis should be read in conjunction with the accompanying consolidated financial statements and related notes. The financial statements have been prepared in accordance with accounting principles generally accepted in Canada (Cdn GAAP). For a reconciliation to accounting principles generally accepted in the United States (US GAAP), see Note 18 to the attached consolidated financial statements.
In this Form 10-Q, the terms total cash cost and cash operating cost are used on a per ounce of gold basis. Total cash cost per ounce is equivalent to mining operations expense for the period as found on the Consolidated Statements of Operations, divided by the number of ounces of gold sold during the period. Cash operating cost per ounce is equivalent to mining operations expense for the period less production royalties and production taxes, divided by the number of ounces of gold sold during the period.
RECONCILIATION OF | Three months ended June 30, |
Six months ended June 30, |
||||||||||||||
CASH OPERATING COST PER OUNCE |
2004 |
2003 |
2004 |
2003 |
||||||||||||
Mining operations expense (in $ thousands) |
$ | 10,190 | $ | 7,844 | $ | 19,315 | $ | 16,344 | ||||||||
Less royalties (in $ thousands) |
436 | 981 | 1,018 | 2,143 | ||||||||||||
Cash operating expense (in $ thousands) |
$ | 9,754 | $ | 6,863 | $ | 18,297 | $ | 14,201 | ||||||||
Gold sold (oz) |
38,805 | 36,042 | 86,007 | 78,398 | ||||||||||||
Cash operating cost ($/oz) |
$ | 251 | $ | 190 | $ | 213 | $ | 181 | ||||||||
We have included total cash cost and cash operating cost information to provide investors with information about the cost structure of our mining operations. We use this information for the same purpose and for monitoring the performance of our operations. This information differs from measures of performance determined in accordance with GAAP in Canada and the United States and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. These measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP and may not be comparable to similarly titled measures of other companies.
All figures in this Item 2 are on a 100% basis, which represents our current beneficial interest in gold production and revenues. Once all capital invested in a Ghanaian subsidiary has been repaid, the Government of Ghana would receive 10% of any dividends declared by a Ghanaian subsidiary.
Additional documents which discuss our company and its management, history and operations are available at www.sedar.com and at www.sec.gov.
OVERVIEW OF THE THREE AND SIX MONTHS ENDED JUNE 30, 2004
Results
Our net income for the three months ended June 30, 2004 was $1.1 million, down from $4.0 million in the same period of 2003. While revenues were higher, higher mining and processing costs associated with mining and processing metallurgically complex transition ores in the second quarter of this year and higher depreciation and amortization charges more than offset the improved revenues resulting in lower net income than in the same period of 2003. The increase in depreciation and amortization reflects the buy-out of a production royalty in 2003.
Increase in general and administrative costs, and a foreign exchange loss also contributed to the lower income versus the same period of 2003. Higher compensation costs from adding new management, and stock option expenses were the major factors contributing to the increase in general and administrative costs.
Net income during the six months ended June 30, 2004 totaled $6.3 million or $0.047 per share on revenues of $36.4 million, versus net income of $8.0 million or $0.078 per share on revenues of $27.8 million in the same period of 2003. Increases in operating costs as described above for the quarter were also responsible for much of the increase in costs for the six months. Foreign exchange losses, higher exploration expenses and general and administrative costs also contributed to the lower earnings versus the same period of 2003. As with the quarter, cash and non-cash compensation costs and foreign currency losses accounted for most of the cost increase.
Mining and milling of oxide ores from the Plant-North pit was completed during the second quarter of 2004 and we are now mining and processing only transition ores from the Plant-North pit. The new flotation circuit at Bogoso/Prestea was commissioned in the quarter and is now operating on a regular basis. Non-recurring start-up costs of this new circuit contributed to the increase in operating costs. Construction continued at the Wassa project during the quarter as did planning, engineering and preconstruction activities for the proposed Bogoso/Prestea expansion projects.
15
IAMGold Tender Offer
On March 30, 2004 IAMGold Corporation (IAMGold), a Toronto-based international gold exploration, development, and royalty company, and Wheaton River Minerals Ltd. (Wheaton), a Canadian-based precious and base metals producer, announced that the two entities would amalgamate, subject to shareholder approval. Special shareholder meetings for IAMGold and Wheaton to seek shareholder approval for the amalgamation were scheduled on June 8 and June 9, 2004.
On May 27 we announced our intent to make an offer to purchase all of the outstanding shares of IAMGold. On June 8 we obtained a ruling from the Ontario Superior Court permitting us to make our offer and delaying the IAMGold shareholders vote on the Wheaton/IAMGold merger until June 29 to give IAMGold shareholders time to evaluate our offer. On June 10, following unsuccessful discussions with IAMGolds management and directors about a potential combination of IAMGold with Golden Star, we made a formal tender offer to IAMGolds shareholders to exchange 1.15 Golden Star shares for each IAMGold share and urged the IAMGold shareholders to reject the proposed amalgamation between IAMGold and Wheaton. Subsequently, IAMGold rescheduled its shareholder vote to July 6, the same day as the rescheduled Wheaton shareholder vote.
On the same day that we announced our intent to purchase all of the outstanding shares of IAMGold, Coeur dAlene Mines Corporation (Coeur), a U.S. based silver producer, announced its intent to make an offer to purchase all of the outstanding shares of Wheaton. Coeur initially offered a partial Coeur share and cash, together worth $3.28, for each share of Wheaton. Coeur has subsequently made a tender offer directly to the Wheaton shareholders and has also increased the value of their offer.
On July 1 we increased our bid for IAMGold to 1.25 shares of our stock for each IAMGold share or alternatively 1.15 shares of our common stock plus Cdn$0.50 per share. We agreed to add a contingent Cdn$0.20 per share for each IAMGold share if it is definitively determined that no break-fee is paid or payable by IAMGold in connection with the proposed arrangement with Wheaton.
On July 6 a majority of the IAMGold shareholders voted against the merger with Wheaton thereby effectively terminating the IAMGold/Wheaton merger. Shortly afterward IAMGolds directors issued a statement that they considered our increased bid inadequate and urged the IAMGold shareholders not to tender their shares to us. On July 13 IAMGolds directors announced that a new shareholders rights plan had been adopted which would be effective until August 15, 2004 that would allow IAMGolds shareholders, other than us, to purchase shares at a 50% discount to the market price if we acquired more than 20% of the outstanding IAMGold shares. The IAMGold directors further stated the new shareholders rights plan was to provide sufficient time to bring forward alternatives to maximize shareholder value. IAMGold also announced that they had prepared due diligence data files to be made available to interested parties but refused to provide the data to us.
On July 15 we made application with the Ontario Securities Commission to set aside the new IAMGold shareholders rights plan saying it constituted an improper defensive response to our offer. On July 22 following an exchange of letters with IAMGold we agreed to withdraw our request to the Ontario Securities Commission to review the IAMGold shareholders rights plan and IAMGold agreed to provide to us the same due diligence data being supplied to other potential bidders. Such data was received and we have initiated a due diligence review of the data. On July 28 our board agreed to extend our tender offer expiry date to 12:01 a.m. on August 16 to coincide with the expiry of IAMGolds new shareholders rights plan at the end of the day of August 15.
Assuming that all of the IAMGold shareholders choose the all share option, that all of the IAMGold shares that are issued and outstanding as of June 4, 2004, and all shares issuable upon exercise of IAMGold options that are in the money as of July 27, 2004, are tendered to the offer and that we take up and pay for such shares under the offer, we would issue approximately 188.4 million new Golden Star common shares. If the Cdn$0.20 per share contingent payment described above is payable, we will pay to IAMGold shareholders an additional Cdn$30.1 million, or approximately $22.6 million, in cash if all of the IAMGold shares issued and outstanding as of June 4, 2004, and all of the shares issuable upon exercise of IAMGold options that are in the money as of July 17, 2004, are tendered to the offer and taken up and paid under the offer.
As of June 30, we have incurred $1.9 million of direct, incremental acquisition costs resulting from our tender offer for IAMGolds common shares. The majority of these costs are for financial advisory, legal and accounting services. If the tender offer fails to acquire a controlling interest in IAMGold, this amount plus any additional future costs incurred in this endeavor would be expensed.
We plan at this point to continue to encourage IAMGold shareholders to tender their shares to Golden Star prior to the August 16 expiry of our offer. For more details of the IAMGold tender offer see our registration statement on Form S-4 as amended (reg.
16
no. 333-116350) and our Canadian Offer to Purchase as amended. There can be no assurance given that our tender offer for IAMGold will be successful.
Prestea Underground Restructuring
In late 2003, our partner in the Prestea Underground joint venture filed for bankruptcy in Ghana. This event resulted in our partner relinquishing its rights under the joint venture agreement that in turn resulted in a transfer of all of the partners remaining ownership position to our subsidiary Bogoso Gold Limited, (BGL), thereby giving BGL a 90% ownership in the Prestea Underground. The Government of Ghana will continue to hold a 10% ownership in Prestea Underground as well as its 10% holding in BGL resulting in a net 81% ownership by Golden Star.
Guyanor Restructuring
During the second quarter a memorandum of understanding (MOA) was signed with our 73% owned subsidiary, Guyanor Ressources S.A., which will govern a significant restructuring of Guyanor and an expansion of its existing exploration business to include the acquisition of royalty and other similar interests.
As provided in the MOU, Mr. Michel Juilland resigned as director and general manager of Guyanor and Mr. James Dunnett and Mr. David Birkenshaw (the Consultants) were elected as directors. In exchange for their services in the Guyanor restructuring, Golden Star agreed to sell to the Consultants for a nominal consideration, nine million shares of Guyanor common share owned by Golden Star which reduced Golden Stars ownership to 53% as of June 30, 2004.
The existing loan agreement between Guyanor and Golden Star will be replaced by a new loan agreement which will require Guyanor to repay approximately $16 million owed to Golden Star only when and if Guyanor returns to a sound financial condition and the $16 million loan will be paid only from proceeds Guyanor may receive from its Paul Isnard properties (referred to a the SOTRAPMAG Properties) in French Guiana. Furthermore, Golden Star and Guyanor will enter into a joint venture, which will allow Golden Star to earn a 50% interest in the SOTRAPMAG Properties by funding $2.0 million of exploration work. Golden Star will further increase its interest to 70% by reducing the loan balance by $500,000 per year for three years under the joint venture and by an additional $3.5 million upon delivery of a feasibility study on the Paul Isnard property. Golden Star may also purchase, via a $6.0 million reduction in the loan balance, Guyanors regional exploration database which includes data on Guyanors past work on several French Guiana properties including the SOTRAPMAG Properties.
If Golden Star makes a decision to initiate mining from the SOTRAPMAG Properties within five years of the date of the MOU, Guyanor will sell its SOTRAPMAG Properties to Golden Star for an additional $5.0 million reduction in the loan balance and a net smelter royalty on the first 2.0 million ounces of gold produced from the SOTRAPMAG Properties. Any remaining unpaid debt owed by SOTRAPMAG to Golden Star as of the date of the sale will be permanently forgiven. Furthermore Guyanor has agreed to let Golden Star conclude the acquisition of the Bon Espoir property in French Guiana which is contiguous with the SOTRAPMAG Properties.
Guyanors Yaou and Dorlin gold properties will be joint ventured or sold to a new company organized by Guyanors former management.
In the interim until the restructuring is completed, Golden Star has agreed to provide continued financial support to Guyanor. Golden Star has further agreed to indemnify Guyanor from liabilities relating to the operation of Guyanors business prior to the restructuring, including potential environmental and severance liabilities.
The final step in the restructuring will require Guyanors new management to undertake a rights offering or other capital increase to fund Guyanors acquisition of the new property interests. The financing will be limited to a maximum of 250 million, by issuance of shares, and/or warrants and/or shares and warrants. In conjunction with the above, Guyanors Class A and Class B shares will be merged into one class of common shares.
Once the restructuring and recapitalization of Guyanor is completed, it is expected that Golden Star will (i) have no involvement in Guyanors day-to-day operation; (ii) will no longer fund Guyanors operations; and (iii) is expected to own less than 50% of Guyanor. At the point where Golden Stars ownership drops below 50%, Golden Star will hold its investment in Guyanor as an equity investment.
Golden Star will write-off its inter-company loan receivable from Guyanor as well as reduce its investment in Guyanor as a result of the transfer of the nine million Guyanor shares to the Consultants. But since the value of Golden Stars investment in Guyanor
17
is essentially nil, the impact of Guyanors restructuring on Golden Stars consolidated financial statements is expected to be immaterial. In the near term Golden Star will continue to hold a 53% interest in Guyanor and will consolidate Guyanors activities until such time as the financing is completed and Golden Star owns less than 50% of Guyanor. If the financing is not completed by September 30, 2004 and does not result in equity proceeds in excess of $3.0 million the MOU described above will be terminated.
TRENDS AFFECTING OUR OPERATIONS DURING THE FIRST HALF OF 2004
While gold prices trended generally upward during the last two and a half years, during the last two quarters gold prices have traded in a range between $375 per ounce and $420 per ounce. However the $404 per ounce average gold price received for our shipments during the first six months of 2004 is well above the $351 per ounce average price received in the first six months of 2003.
As expected, operating costs at Bogoso/Prestea were up from the same period in 2003, the result of mining harder, more metallurgically complex transition material at the Plant-North pit which caused lower mill throughput, lower gold production and higher mining and processing costs.
The Bogoso plant completed processing Plant-North oxide ore during the second quarter and is now processing exclusively transition ore. The Bogoso plant will continue to process only transition ore until late 2005 when the BIOX® conversion is completed.
In anticipation of the transition ore, the Bogoso plant flotation circuit was redesigned, re-built and commissioned in the second quarter and is now being used to assist in obtaining higher recoveries from the more complex transition ores. The total capital cost for the upgraded flotation circuit which was project managed in-house and which will be a key component of the future BIOX® project, was $3.5 million. Metallurgical test work in 2003 indicated the combination of gravity, flotation and intensive cyanide leaching of transition material would increase gold recoveries from transition ores to a range of 60% to 70% compared to recoveries in the range of 42% to 50% for carbon-in-leach alone. With the flotation circuit now on-line, we are currently achieving gold recovery of approximately 66% and expect to optimize the process and achieve incremental improvements in the third quarter.
RESULTS OF OPERATIONS
Three months ended June 30, 2004 compared to the three months ended June 30, 2003
Net income during the three months ended June 30, 2004 totaled $1.1 million or $0.008 per share on revenues of $16.5 million, versus net income of $4.0 million or $0.037 per share on revenues of $12.7 million in the same three months of 2003. Gold revenues for the three months ended June 30, 2004 were based on sales of 38,805 ounces, an 8% improvement over the 36,042 ounces sold in the same period of 2003. Realized gold prices averaged $399 per ounce for the quarter, a 15% increase from $347 per ounce realized in the second quarter of 2003.
Three months ended June 30, |
Six months ended June 30, |
|||||||||||||||
FINANCIAL RESULTS |
2004 |
2003 |
2004 |
2003 |
||||||||||||
Gold sold (oz) |
38,805 | 36,042 | 86,007 | 78,398 | ||||||||||||
Average price realized ($/oz) |
399 | 347 | 404 | 351 | ||||||||||||
Operating cash flow (in $ thousands) |
5,675 | 5,619 | 11,681 | 10,462 | ||||||||||||
Total revenues (in $ thousands) |
16,494 | 12,693 | 36,351 | 27,834 | ||||||||||||
Net income (in $ thousands) |
1,115 | 3,993 | 6,309 | 7,977 | ||||||||||||
Net income per share basic ($) |
0.008 | 0.037 | 0.047 | 0.078 | ||||||||||||
18
Three months ended June 30, |
Six months ended June 30, |
|||||||||||||||
BOGOSO/PRESTEA OPERATING RESULTS |
2004 |
2003 |
2004 |
2003 |
||||||||||||
Ore mined (t) |
311,714 | 502,551 | 687,300 | 1,111,327 | ||||||||||||
Waste mined (t) |
1,766,400 | 1,406,457 | 3,793,360 | 3,578,648 | ||||||||||||
Ore milled (t) |
421,289 | 459,506 | 935,725 | 1,016,118 | ||||||||||||
Grade milled (g/t) |
3.51 | 3.31 | 3.64 | 3.29 | ||||||||||||
Recovery (%) |
63.8 | 75.5 | 73.7 | 74.8 | ||||||||||||
Cash operating cost ($/oz) |
251 | 190 | 213 | 181 | ||||||||||||
Royalties ($/oz) |
12 | 28 | 12 | 27 | ||||||||||||
Total cash cost ($/oz) |
263 | 218 | 225 | 208 | ||||||||||||
Bogoso/Prestea processed an average of 4,630 tonnes per day for the three months ended June 30, 2004. Most of the ore milled in the period was transition ore from the Plant-North ore body. Ore grades averaged 3.51 grams per tonne for the quarter. This compares to 5,050 tonnes per day of oxide ore at 3.31 grams per tonne in the second quarter of 2003, which was also from the Plant-North pit. Lower mill through-put was mostly related to start-up activities of the new flotation circuit installed to facilitate gold recovery from the transition ore. We expect through-put to increase incrementally as we optimize the flotation circuit operations.
Gold recovery was 63.8% in the quarter, down from 75.5% in the same quarter last year. Even with lower recovery and lower throughput in the mill, Bogoso/Prestea sold 38,805 ounces of gold in the quarter, up from 36,042 ounces in the same period of 2003. Cash operating costs averaged $251 per ounce for the quarter, compared to $190 per ounce in the same period of 2003. Total cash costs averaged $263 per ounce, up from $218 in the second quarter of 2003. Lower royalty costs were offset by the increased cost of processing transition ores milled in the second quarter.
Six months ended June 30, 2004 compared to the six months ended June 30, 2003
Net income during the six months ended June 30, 2004 totaled $6.3 million or $0.047 per share on revenues of $36.4 million, versus net income of $8.0 million or $0.078 per share on revenues of $27.8 million in the same period of 2003. Gold revenues for the six months ended June 30, 2004 were based on sales of 86,007 ounces, a 10% improvement over the 78,398 ounces sold in the same period of 2003. Realized gold prices averaged $404 per ounce for the six months, a 15% increase from the $351 per ounce realized in the same period of 2003.
Bogoso/Prestea processed an average of 5,141 tonnes per day for the six months ended June 30, 2004, down from 5,614 tonnes per day in the same six months of 2003. Lower mill through-put was related to the start-up phase of the new flotation circuit at the Bogoso mill. All of the ore processed in the current year has come from the Plant-North ore body and averaged 3.64 grams per tonne versus 3.29 grams per tonne in the six months of 2003. Gold recovery averaged 73.7%, down slightly from 74.8% in the same period last year. Cash operating costs averaged $213 per ounce, compared to $181 per ounce in the same six month period of 2003 and total cash costs averaged $225 per ounce, up from $208 per ounce in the first six months of 2003. Cash operating costs rose on the increase in costs associated with milling the transition ores and the start-up of the new flotation plant.
BOGOSO/PRESTEA EXPANSION PROJECTS
Bondaye Plant
Board approval to proceed with the Bondaye plant project was received earlier in the year and the Environmental Impact Statement, or EIS, has been completed and submitted to the Ghana Environmental Protection Agency. The initial permits are expected to be received during the third quarter. We anticipate construction will start immediately thereafter and be finished in mid-2005.
In parallel with the permitting process, the used carbon-in-leach, or CIL, plant that we acquired in 2003 has been disassembled and transported to Prestea where it is being refurbished. The Bondaye plant site is well-located towards the south of the reserves on the Prestea property and immediately north of the seven kilometers of prospective Ashanti trend mineralization being drilled.
19
The estimated capital costs for the construction and commissioning of the Bondaye plant are approximately $17 million. The Bondaye CIL plant with a nominal capacity of 1.5 million tonnes per annum will process ore mined from our Beta Boundary pits and the deeper ore from the Plant-North pit where we have proven and probable reserves of 9.9 million tonnes at an average grade of 3.1 g/t. Based on these known reserves, we expect to upgrade the Bondaye plant to incorporate a BIOX® circuit in 2008 to process deeper sulfide materials from the Beta Boundary pits.
Gold production from the Bondaye plant is expected to average 120,000 ounces per annum, varying between 100,000 to 140,000 ounces per annum, at an average cash operating cost of $200 per ounce. Recoveries are expected to average 82% and to vary between 70% and 94%.
Bogoso Plant Up-Grade
Planning and engineering continues for the proposed Bogoso plant BIOX® conversion project. The plant will process sulfide and refractory ores from the Bogoso/Prestea property. We have issued a letter of award to GRD Minproc Limited for the detailed design of the BIOX® circuit and to carry out the construction under a project management contract. Completion of the detailed engineering and permitting are expected by year-end. Separately, work on an Environmental Impact Assessment is underway. Subject to permitting and board approvals in late 2004, construction would begin immediately thereafter for commencement of production by the end of 2005.
The BIOX® process has been in successful operation for 20 years. The Fairview Mine in South Africa was the first to be commissioned in 1986. Today there are six gold bio-oxidation projects using BIOX® technology and two others using other stirred tank bio-oxidation technology. All are in operation or have been successfully operated. Two new BIOX® plants are currently under construction. One of the larger bio-oxidation plants, which was built by GRD Minproc in the mid-1990s, is at AngloGold Ashantis Obuasi mine, which is also located on the Ashanti gold trend 130 kilometers northeast of Bogoso/Prestea. The sulfide mineralization at Obuasi is very similar to the Bogoso/Prestea material. Our metallurgical assessment of the suitability of the bio-oxidation process for Bogoso/Prestea ores has been a four-year project. The work has involved metallurgical assessments on some 30 samples representative of the current sulfide reserves, including a flotation, BIOX® and neutralization pilot plant program on a nine-tonne bulk sample compiled by the blending of approximately 90 diamond drill hole cores. We estimate the capital cost for the BIOX® upgrade at Bogoso to be about $25 million.
In addition to the above expenditures, we expect to spend approximately $26 million in 2004 and 2005 to expand the Bogoso/Prestea mining fleet to accommodate the expanded scope of the operations. The existing 50-tonne truck fleet and loading and ancillary equipment is nearing the end of its economic life, and will be phased out and replaced with 90-tonne trucks. This larger scale equipment is expected to reduce the cost per tonne mined.
Following the BIOX® upgrade, the Bogoso plant is expected to have a nominal capacity of 1.5 million tonnes per annum to process sulfide and refractory ores from our Bogoso and northern Prestea pits, where we currently have proven and probable reserves of approximately 12.5 million tonnes at an average grade of 3.4 grams per tonne. Gold production from the Bogoso plant is expected to average 140,000 ounces per annum and to vary between 120,000 to 160,000 ounces per annum at an average cash operating cost of $225 per ounce. Estimated gold recoveries from the BIOX®process are expected to average 86% and vary between 82% and 88%.
WASSA GOLD PROJECT
The Wassa Mine, 35 kilometers east of Bogoso/Prestea, is fully permitted and commissioning of the process plant and ore processing has commenced. The Wassa plant is expected to achieve full capacity in August and commercial gold production before the end of the current quarter. Connection to the national power grid should be completed in the fourth quarter. In the interim, Wassa will be powered by its own generating plant, which can generate sufficient electric power to fully operate the site. The generating plant will subsequently be used as a standby power facility.
20
Initially, the Wassa plant will process material from the previous owners operation. The material will be moved by front-end loaders and fed to the conventional milling circuit via a sequence of conveyors and through a slurrying facility. The previous operation failed because this material is not well suited to heap-leach recovery. As a result, we acquired a stockpile of already mined and crushed mill feed grading 0.7 g/t Au that has enabled us to begin operations well ahead of open-pit mining. This material will be preferentially processed as it is located within the ultimate footprint of the tailings dam.
Open pit mining at Wassa will begin on a limited scale in the fourth quarter to supplement the heap-leach material with mined ore. During this period, mining operations will be carried out using mining equipment transferred from Bogoso/Prestea, following the upgrading of that mines fleet with larger capacity units. Once Wassas full-scale open-pit mining commences in late 2005, we plan to invest approximately $17 million in new mining equipment of similar size to that being acquired for Bogoso/Prestea.
When in full open-pit production in 2006, processing only open pit ore, we expect Wassa to produce at an average annualized rate of 140,000 ounces per annum at an average cash operating cost of $200 per ounce. Gold recoveries at Wassa are expected to average 92% and vary from 88% to 95% for open pit ore and from 80% to 96% for the heap leach material.
Following an approximate 12,000-meter reverse circulation, or RC, and diamond drilling program during the first six months of 2004, the mineral reserves at Wassa have been updated resulting in a 25% increase in the Probable Mineral Reserve category to 19.7 million tonnes at an average grade of 1.32 grams of gold per tonne (g/t Au). At present, there are no Proven Reserves.
Tonnes | Grade | Gold Content | ||||||||||||||
Probable Reserves |
(millions) |
(g/t Au) |
(ounces) |
Increase1 |
||||||||||||
Weathered (oxide) |
5.6 | 1.16 | 209,000 | 39 | % | |||||||||||
Fresh (sulfide) |
9.9 | 1.69 | 536,000 | 26 | % | |||||||||||
Heap Leach Pads |
4.2 | 0.66 | 89,000 | 0 | % | |||||||||||
Total Probable Reserves 2 |
19.7 | 1.32 | 834,000 | 25 | % | |||||||||||
1. | Increase in the contained gold relative to December 31, 2003. | |||
2. | Golden Stars share of the mineral reserves is subject to the Government of Ghanas right to a 10% dividend once our capital costs have been recovered. |
The Mineral Reserve estimate was prepared in conformity with Canadas National Instrument 43-101 and with the US Securities and Exchange Commissions definitions. The Qualified Person for the estimation is David Alexander, project mining manager of the Company. The Mineral Reserve estimate has been derived from engineered pits optimized at a $325 per ounce gold price. Appropriate factors to allow for mining recovery and dilution have been used in the estimate. Further technical details on the methodology and calculation of our reserves can be found in the Companys Technical Report filed with SEDAR on May 2, 2003.
MINING FLEET
The total mining fleet capital expenditure at Bogoso/Prestea and Wassa during 2004 and 2005 is expected to total approximately $43 million as follows:
2004 | 2005 | Total | ||||||||||
($million) |
($million) |
($million) |
||||||||||
Bogoso |
6 | 7 | 13 | |||||||||
Prestea (to feed Bondaye Plant) |
| 13 | 13 | |||||||||
Wassa |
| 17 | 17 | |||||||||
Total |
6 | 37 | 43 |
The first 90-tonne trucks have been delivered to Bogoso/Prestea and have been placed into production. To finance a portion of this investment, we have arranged a $25 million finance facility from the major vendor, Caterpillar, to be secured against the fleet. The finance facility has a term of five years and an interest rate of 2.28% over the US Federal Reserve five year swap rate.
21
EXPLORATION
We have allocated approximately $21 million in 2004 to an aggressive exploration program. Much of the work will focus on our highly prospective land positions in Ghana, where a total of $12.5 million has been designated for our expanded Bogoso/Prestea property. In addition, we plan to spend $2.5 million at Wassa and $6.0 million at our exploration projects in West Africa and South America. Expensed exploration totaled $0.2 million for the quarter and $0.5 million for the six months, compared with $0.2 million and $0.2 million in the respective periods in 2003.
Prestea South, Ghana (90% Golden Star)
The first phase of reconnaissance exploration on the southern extension of our Bogoso/Prestea gold property was completed in the second quarter with 28,272 meters of rotary air blast, or RAB, and reverse circulation, or RC, drilling, being completed. This work identified substantial gold grades hosted in oxide material over the northern half of a parallel seven-kilometer gold-in-soil anomaly.
An additional 18,000 meters of RC drilling is underway to test the down-dip extension of the identified mineralized zones. Work to date has confirmed that these zones extend down at least as far as 150 meters below the surface where fresh, or sulfide, rock is encountered.
Prestea Underground, Ghana (81% Golden Star)
Exploration continues in the inactive Prestea Underground Mine on our Bogoso/Prestea property. This mine, with previously fragmented ownership, has produced over nine million ounces. Progress is being made on several of the many unexplored areas, as follows:
| Drilling between the 17 and 24 levels, approximately 700 meters below surface, has returned encouraging results and an additional 6,000 meters of step-out and delineation drilling is planned for this zone during the balance of 2004. |
| Two hanging-wall cross cuts are being developed to provide access to drill targets below the lowest mining levels. Other underground drill locations have been developed and a third underground drill rig has been mobilized, which will commence drilling in the third quarter and continue into 2005. |
| A surface drill rig capable of testing the down-dip extensions below the historical workings is currently drilling the projected extensions of the Bondaye main ore shoot. It should intersect the projected mineralized zone approximately 500 meters below the existing underground workings. Drilling is expected to continue into 2005. |
Exploration costs at the Prestea Underground project totaled $2.6 million during the first six months of 2004, compared to spending of $1.1 million in the same period of 2003.
Mininko, Mali (may earn up to 82.5% interest)
Gold mineralization at Mininko occurs in flat-lying quartz veinlets where two phases of drilling have now been completed. The second phase comprising 2,756 meters of RC and core drilling was concluded during the second quarter. This phase was to test extensions of the mineralization at the Nampala prospect, including a new zone to the east, and to improve the geological model in preparation for preliminary resource modeling.
The drilling confirmed broad zones of lower grade mineralization, which continue to approximately 200 meters below the surface. Many of the drill holes have intercepted multiple zones of mineralization, including some higher grade mineralization. Significant intersections from Phase 1 and 2 drilling, as well as maps, are summarized on our web site at www.gsr.com
Mineralization remains open along strike to the north and south at Nampala and a newly discovered zone to the east was partially tested by three RC drill holes.
Mano River Joint Venture, Sierra Leone (may earn up to 85%)
The first phase of drilling at the Yirisen gold prospect in Sierra Leone commenced during the quarter. Initial results have been encouraging and the current work program is expected to be completed during the third quarter. Yirisen is located in the North Pampana Exclusive Prospecting License in the Sula Mountains greenstone belt and is a joint venture with Mano River Resources who are the project operators.
22
LOOKING AHEAD
Our main objectives for the reminder of 2004 are:
| Continued orderly and efficient mining of Prestea Plant-North ores allowing an adequate flow of transition ores to the Bogoso processing plant; | |||
| Commence commercial production at Wassa; | |||
| Environmental permitting for and commencement of construction of the Bondaye processing plant near Prestea in readiness for first gold production in the third quarter of 2005; | |||
| Completion of planning, engineering and design work for the Bogoso BIOX® conversion in readiness for a board decision by late 2004 and construction in 2005; | |||
| Continued evaluation of the Prestea Underground potential; | |||
| A continued high level of exploration efforts focused on understanding the potential of our principal properties in Ghana and West Africa; | |||
| Continuation of efforts to identify and pursue acquisition and growth opportunities in Ghana and elsewhere; | |||
| Evaluate and rationalize our South American assets; | |||
| A successful completion of the IAMGold share tender offer and subsequent integration of IAMGold into Golden Star. |
23
LIQUIDITY AND CAPITAL RESOURCES
We continued to maintain adequate cash balances during the first half of 2004. The cash and cash equivalent balance stood at $85.8 million at June 30, 2004, down from approximately $90 million at the end of 2003. Cash flow from operations before working capital changes totaled $12.4 million during the first six months of 2004, versus $11.4 million in the same period of 2003.
Investing activities consumed $26.7 million of cash in the first six months of 2004 and we received the second of three $1.0 million deferred payments from sale of the Gross Rosebel property. Investing expenditures by site were as follows:
Six months | ||||
ended June 30, | ||||
2004 |
||||
Bogoso/Prestea |
$ | 6,940 | ||
Wassa |
9,624 | |||
Prestea Underground |
2,619 | |||
Deferred exploration and development |
3,691 | |||
Other projects |
3,824 | |||
Total |
$ | 26,698 | ||
Stock option exercises provided $1.0 million of cash during the first six months of 2004 and warrant exercises added an additional $8.5 million. At June 30, 2004, working capital was $92.7 million, versus $96.8 million at the end of 2003.
In June 2004 an equipment financing credit facility was established between Caterpillar Financial Services Corporation and the subsidiaries of Golden Star with Golden Star the guarantor of all amounts borrowed. The loan provides up to a maximum of $25 million of credit for a mixture of new and used mining equipment. The facility expires on April 30, 2005, bears an interest at a rate equal to the Five Year US$ Swap Rate plus 2.28%, is repayable over five years for new equipment and over two years for used equipment and requires monthly payments. As of June 30, 2004 the amount drawn on this new line of credit was nil.
Outlook
We expect that Bogoso/Prestea will continue to generate positive operating cash flows during 2004, with all excess cash being used at Bogoso/Prestea for the various capital projects scheduled during 2004. While we currently have adequate cash balances on hand to meet our exploration and operational needs, we expect that property acquisitions, development spending and the capital investment needs at Wassa and Bogoso/Prestea and funding of our exploration activities will draw down cash balances to lower levels during the remainder of 2004.
The potential cash component of the IAMGold tender offer could consume up to $57 million of cash if all IAMGold shareholders opt for the shares-plus-cash option in exchange for their IAMGold shares and an additional $23 million would be needed if the contingent Cdn$0.20 per share is paid. While a cash payment for the IAMGold shares would significantly reduce our cash balance, we still expect that the combined entity would have a cash balance sufficient to fund the capital expenditures now anticipated over the next two years.
If additional attractive acquisitions become available during the year, it is possible that more funds could be needed to facilitate our continued growth. Funding of approximately $60 million would be required during 2004 and 2005 when a decision is made to proceed with the Bogoso BIOX® conversion in addition to the Bondaye plant. Potential sources of funds for the expansion would most likely include cash on hand, cash generated by operations, debt, equity or some combination of these sources, although there can be no assurance we would successfully obtain the amount of funds required.
ITEM 3 QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Our exposure to market risk includes, but is not limited to, the following risks: changes in interest rates on our investment portfolio, changes in foreign currency exchange rates and commodity price fluctuations.
24
Commodity Price Risk
We are engaged in gold mining and related activities, including exploration, development, mining, processing and reclamation. Gold bullion is our primary product and, as a result, changes in the price of gold could significantly affect results of operations and cash flows. According to current estimates for 2004, a $25 change in the price of gold could result in a $4.6 million to $5.3 million change in our pre-tax results of operations and cash flows during the year. We may in the future consider more actively managing our exposure through price protection programs.
Foreign Currency Exchange Rate Risk
The price of gold is denominated in United States dollars and the majority of our revenues and expenses are denominated in United States dollars but currently we maintain a portion of our short-term investments in Canadian dollars. A five percent change in the US$/Cdn$ exchange rate would impact the value of our current Cdn$ denominated investments by approximately $1 million. In addition a portion of our capital and operating asset purchases are denominated in currencies other than the US dollar and we have on occasion experienced increases in the cost of certain items due to unanticipated foreign currency exchange rate fluctuations. We currently do not utilize market risk sensitive instruments to manage our exposure. We may in the future consider more actively managing our exposure to foreign currency exchange rates.
Interest Rate Risk
We invest excess cash in short-term debt instruments of the United States Government and its agencies on a floating interest rate basis. We may also invest in short term debt instruments of the Government of Canada. Over time the rates received on such investments may fluctuate with changes in economic conditions. As a result, our investment income may fall short of expectations during periods of lower interest rates. A 0.1 percent change in interest rates would change our annual interest income by approximately $0.8 million based on cash balances the end of June 2004. We may in the future consider more actively managing our exposure to interest rate risk.
ITEM 4. CONTROLS AND PROCEDURES
We carried out an evaluation, under the supervision and with the participation of our principal executive officer and principal financial officer, of the effectiveness of our disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) as of the end of the period covered by this report. Based on this evaluation, the principal executive officer and principal financial officer have concluded that our disclosure controls and procedures are effective.
We periodically conduct an evaluation, under the supervision and with the participation of our principal executive officer and principal financial officer as well as our Audit Committee, of our internal controls and procedures. There have been no significant changes in our internal controls or in other factors that could significantly affect our internal controls subsequent to the date of the most recent evaluation.
PART II OTHER INFORMATION
ITEM 1. LEGAL PROCEEDINGS
We are not currently subject to any material pending legal proceedings. We are, however, engaged in routine litigation incidental to our business. No material legal proceedings, involving us or our business are pending, or, to our knowledge, contemplated, by any governmental authority. We are not aware of any material events of noncompliance with environmental laws and regulations.
ITEM 2. CHANGES IN SECURITIES AND THE USE OF PROCEEDS
Recent Sales of Unregistered Securities
Common Stock
1. In the second quarter of 2004, 280,500 shares were issued upon exercise of warrants for total consideration to the Company of Cdn$841,500 ($602,275). The warrants were originally issued in January 2003 with a Cdn$3.00 exercise price.
ITEM 3. DEFAULTS UPON SENIOR SECURITIES
None.
25
ITEM 4. SUBMISSION OF MATTERS TO A VOTE OF SECURITY HOLDERS
The 2004 Annual General Meeting of Shareholders was held on May 20, 2004 where four matters were voted upon.
1. The following directors were elected until 2004:
Number of Common Shares | ||||||||
Voted |
||||||||
Director |
Affirmative |
Withheld |
||||||
James E. Askew |
89,595,988 | 526,689 | ||||||
Peter J. Bradford |
89,595,988 | 526,689 | ||||||
David K. Fagin |
89,595,988 | 526,689 | ||||||
Ian MacGregor |
89,595,988 | 526,689 | ||||||
Lars-Eric Johansson |
89,595,988 | 526,689 | ||||||
Michael P. Martineau |
89,595,988 | 526,689 |
2. Appointment of PricewaterhouseCoopers LLP as our auditor until the next annual general meeting. The shareholders approved the measure with an affirmative vote of 88,290,968 Common Shares and 302,931 Common Shares withheld.
3. Ratification, confirmation and approval of the Shareholder Protection Plan: The shareholders approved the Plan with 25,762,012 votes for the ratification, confirmation and approval of the plan and 4,373,052 votes cast against.
4. Approval of amendments to the Corporations Amended and Restated 1997 Stock Option Plan: The shareholders approved the amendments with 13,289,672 votes cast in favor and 13,041,979 votes cast against the amendments.
26
ITEM 5 OTHER INFORMATION
None
ITEM 6. EXHIBITS AND REPORTS ON FORM 8-K
(a) Exhibits.
10.1
|
Second Amended and Restated 1997 Stock Option Plan, amended and restated as of May 20, 2004. | |
31.1
|
Certification of Principal Executive Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002. | |
31.2
|
Certification of Principal Financial Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002. | |
32.1
|
Certificate of Principal Executive Officer pursuant to 18 U.S.C. 1350 (Section 906 of the Sarbanes-Oxley Act of 2002). | |
32.2
|
Certificate of Principal Financial Officer pursuant to 18 U.S.C. 1350 (Section 906 of the Sarbanes-Oxley Act of 2002). |
(b) Reports on Form 8-K filed during the quarter ended June 30, 2004.
1. | A report on Form 8-K was furnished to the Securities and Exchange Commission on May 4, 2004 pursuant to Items 7 and 12 to announce financial results for the first quarter of 2004. | |||
2. | A report on Form 8-K was filed to the Securities and Exchange Commission on May 28, 2004 describing an Amended and Restated Shareholder Protection Rights Plan as adopted by shareholders on May 20, 2004. | |||
3. | A report on Form 8-K was filed to the Securities and Exchange Commission on June 3, 2004 announcing a proposed business combination with IAMGold Corporation. |
27
SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
GOLDEN STAR RESOURCES LTD.
Registrant
By: | /s/ Peter J. Bradford | |||
Peter J. Bradford | ||||
President and Chief Executive Officer Date: August 04, 2004 |
||||
By: | /s/ Allan J. Marter | |||
Allan J. Marter | ||||
Senior Vice President and Chief Financial Officer Date: August 04, 2004 |
||||
28
EXHIBITS INDEX
10.1
|
Second Amended and Restated 1997 Stock Option Plan, amended and restated as of May 20, 2004. | |
31.1
|
Certification of Principal Executive Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002. | |
31.2
|
Certification of Principal Financial Officer pursuant to Section 302 of the Sarbanes-Oxley Act of 2002. | |
32.1
|
Certificate of Principal Executive Officer pursuant to 18 U.S.C. 1350 (Section 906 of the Sarbanes-Oxley Act of 2002). | |
32.2
|
Certificate of Principal Financial Officer pursuant to 18 U.S.C. 1350 (Section 906 of the Sarbanes-Oxley Act of 2002). |
29